ECGD | ECGD | 25 Nov 24 | Agency - Interim Managers | FCD | Alexander Mann Solutions | 4 | £3,130.50 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 4 | £3,412.80 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 4 | £2,867.20 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 4 | £3,584.00 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 4 | £1,443.90 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Specialist Contractors | Risk Approval Division | Alexander Mann Solutions | 4 | £3,721.25 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Temporary Staff | DDD | Alexander Mann Solutions | 4 | £873.66 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Temporary Staff | FCD | Alexander Mann Solutions | 4 | £910.57 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 4 | £761.04 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 4 | £910.57 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Agency - Temporary Staff | ITD | Alexander Mann Solutions | 4 | £695.03 | Interim Staff costs |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £573.93 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,019.18 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,034.84 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,048.00 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,329.60 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,347.90 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,373.95 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,534.40 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,816.00 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £2,921.80 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,028.77 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,150.28 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,456.00 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,584.00 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,592.90 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,592.90 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,652.25 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,652.25 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £3,675.35 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £4,106.20 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £4,174.00 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £4,174.00 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 4 | £6,159.30 | Project Contractors |
ECGD | ECGD | 21 Nov 24 | External Meeting Rooms | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2,722.50 | External meeting rooms |
ECGD | ECGD | 21 Nov 24 | External Meeting Rooms | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £397.00 | External meeting rooms |
ECGD | ECGD | 21 Nov 24 | External Meeting Rooms | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2,548.17 | External meeting rooms |
ECGD | ECGD | 21 Nov 24 | External Meeting Rooms | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | -£22.64 | External meeting rooms |
ECGD | ECGD | 21 Nov 24 | External Meeting Rooms | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £45.00 | External meeting rooms |
ECGD | ECGD | 21 Nov 24 | External Meeting Rooms | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1,966.67 | External meeting rooms |
ECGD | ECGD | 21 Nov 24 | External Meeting Rooms | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3,000.00 | External meeting rooms |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £4.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £4.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £5.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £11.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £15.80 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £15.80 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £21.30 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £27.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £30.20 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £34.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £34.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £48.45 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £49.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £53.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £53.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £53.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £55.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £57.20 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £62.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £65.80 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £66.67 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £68.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £69.90 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £70.85 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £70.85 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £71.67 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £74.10 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £74.10 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £76.80 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £76.80 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £82.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £88.30 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £92.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £95.79 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £97.13 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £97.13 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £97.13 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £103.60 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £108.20 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £114.60 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £114.60 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £115.83 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £127.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £128.76 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £153.33 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £155.64 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £168.98 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £186.85 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £240.20 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £247.46 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £268.72 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £268.72 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £268.72 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £272.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £287.24 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £291.03 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £566.10 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £933.86 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | DDD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | -£206.80 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | DDD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | DDD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £5.40 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | FCD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £70.85 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £109.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £109.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £109.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £109.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £109.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £109.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £129.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £287.40 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | HRD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £539.73 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £22.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £22.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £22.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £22.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | ITD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £22.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | LD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £70.85 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | MC | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | MC | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | MC | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £31.20 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | MC | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £46.90 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £21.30 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £21.30 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £57.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £96.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £96.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £222.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £21.30 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £21.30 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £70.85 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £92.66 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £95.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £47.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £77.90 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £118.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £158.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £168.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £169.65 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £184.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £191.01 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £191.01 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £220.35 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Home Travel /Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £222.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | -£4,485.99 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | -£3,729.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | -£3,185.89 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £0.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £6.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £9.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £14.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £121.27 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £140.14 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £178.04 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £213.24 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £250.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £254.06 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £456.98 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £475.72 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £488.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £489.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £646.68 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £646.68 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1,528.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1,939.20 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2,718.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3,779.39 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £10,575.04 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £14.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £14.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £96.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £96.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £162.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £162.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £295.92 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £442.26 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £4,546.34 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Restructuring, Claims & Recoveries Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £742.40 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £140.14 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £222.40 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £284.40 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | Risk Approval Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £441.82 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £444.10 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £853.78 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1,465.68 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £4,475.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel (Case Related) | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £4,475.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | -£759.55 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £2.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £69.40 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £100.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £100.60 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £146.16 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £152.80 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £154.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £190.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £190.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £288.46 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £301.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £327.70 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £448.64 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £448.64 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3,876.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Business Group | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3,876.29 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | LD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | LD | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £263.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | MC | Clarity Travel Ltd frmly Mawasem Ltd | 249 | -£1,458.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | MC | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Portfolio Management Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £388.09 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Restructuring, Claims & Recoveries Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Restructuring, Claims & Recoveries Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Restructuring, Claims & Recoveries Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £263.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | Restructuring, Claims & Recoveries Division | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £263.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £3.50 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £7.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £9.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £90.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £97.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £170.36 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £173.60 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £210.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £223.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £268.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £268.00 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £292.61 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £632.98 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £723.89 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1,057.23 | Business Travel |
ECGD | ECGD | 21 Nov 24 | Overseas Travel/Subsistence | SSIG | Clarity Travel Ltd frmly Mawasem Ltd | 249 | £1,735.15 | Business Travel |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1844 | £37,170.36 | Technical Services (Recoverable) |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1844 | £37,170.37 | Technical Services (Recoverable) |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1851 | £2,933.91 | Technical Services (Recoverable) |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1851 | £3,643.52 | Technical Services (Recoverable) |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1851 | £5,501.69 | Technical Services (Recoverable) |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1851 | £6,113.02 | Technical Services (Recoverable) |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1851 | £15,178.85 | Technical Services (Recoverable) |
ECGD | ECGD | 13 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1854 | £766,446.01 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1855 | -£1,241.65 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1855 | £13,643.96 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1855 | £62,545.85 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1855 | £122,732.71 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1856 | £1,315.40 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1856 | £2,407.11 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1856 | £2,764.86 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1856 | £3,357.44 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1856 | £230,532.59 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1857 | £38,147.82 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1857 | £38,147.83 | Technical Services (Recoverable) |
ECGD | ECGD | 15 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1857 | £56,217.84 | Technical Services (Recoverable) |
ECGD | ECGD | 18 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1864 | £121,588.24 | Technical Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1870 | £37,040.12 | Technical Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1870 | £37,040.13 | Technical Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Legal Services (Recoverable) | LD | White & Case LLP EUR Account | 1872 | £7,766.98 | Legal Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Legal Services (Recoverable) | LD | White & Case LLP EUR Account | 1872 | £7,766.98 | Legal Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Legal Services (Recoverable) | LD | White & Case LLP EUR Account | 1872 | £7,766.99 | Legal Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Legal Services (Recoverable) | LD | White & Case LLP EUR Account | 1872 | £7,766.99 | Legal Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Legal Services (Recoverable) | LD | White & Case LLP EUR Account | 1872 | £7,766.99 | Legal Services (Recoverable) |
ECGD | ECGD | 22 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Clarus Law Associates | 1873 | £33,493.40 | Technical Services (Recoverable) |
ECGD | ECGD | 25 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1874 | £711,803.56 | Technical Services (Recoverable) |
ECGD | ECGD | 25 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1875 | £19,860.25 | Technical Services (Recoverable) |
ECGD | ECGD | 25 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1875 | £75,515.56 | Technical Services (Recoverable) |
ECGD | ECGD | 25 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1875 | £84,843.57 | Technical Services (Recoverable) |
ECGD | ECGD | 25 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1875 | £97,216.94 | Technical Services (Recoverable) |
ECGD | ECGD | 25 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1875 | £281,214.57 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1879 | £1,921.47 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1879 | £7,218.05 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1879 | £8,868.00 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1879 | £9,887.22 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1879 | £184,594.27 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1880 | £5,356.09 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1880 | £7,338.35 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited EUR | 1880 | £14,549.54 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1881 | £2,292.21 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1881 | £5,315.58 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1881 | £21,633.80 | Technical Services (Recoverable) |
ECGD | ECGD | 28 Nov 24 | Technical Services (Recoverable) | Restructuring, Claims & Recoveries Division | Aergo Capital Limited USD | 1881 | £111,774.76 | Technical Services (Recoverable) |
ECGD | ECGD | 8 Nov 24 | Marketing | MC | Manning Gottlieb OMD | 2919 | -£34,464.43 | Marketing and Communication |
ECGD | ECGD | 1 Nov 24 | Learning and Development | HRD | KPMG | 86670 | £39,130.00 | Learning and Development |
ECGD | ECGD | 1 Nov 24 | Project Consultancy Costs | Change Board | KPMG | 86672 | £41,649.00 | Project Consultancy |
ECGD | ECGD | 4 Nov 24 | Project Agency - Specialist Cont | Change Board | Ceox Services Ltd | 86673 | £37,883.00 | Project Contractors |
ECGD | ECGD | 4 Nov 24 | IT Software Licensing & Subscription | ITD | Bytes Software Services Ltd | 86677 | £41,679.98 | Technical Services |
ECGD | ECGD | 4 Nov 24 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 86695 | £1,899.16 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 86695 | £2,515.03 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 86695 | £2,625.25 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 86695 | £3,130.50 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £1,443.90 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £1,539.81 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £2,048.00 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £2,191.35 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £2,329.60 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £2,347.90 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £2,817.44 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £2,869.65 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,391.40 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,456.00 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,584.00 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,592.90 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,592.93 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,652.25 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,652.25 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,652.25 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,721.25 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,721.25 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,721.25 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £3,937.85 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £4,106.20 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £4,106.20 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £4,106.20 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £4,174.00 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Specialist Contractors | HRD | Alexander Mann Solutions | 86695 | £4,174.00 | interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86695 | £553.73 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86695 | £590.64 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86695 | £695.03 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86695 | £726.00 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86695 | £738.30 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86695 | £761.04 | Interim Staff costs |
ECGD | ECGD | 4 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86695 | £761.04 | Interim Staff costs |
ECGD | ECGD | 11 Nov 24 | IT Software Licensing & Subscription | ITD | Fidelity National Info Services | 86712 | £27,825.57 | Technical Services |
ECGD | ECGD | 11 Nov 24 | IT Software Licensing & Subscription | ITD | Fidelity National Info Services | 86712 | £89,041.82 | Technical Services |
ECGD | ECGD | 11 Nov 24 | Assets Under Construction | Change Board | Softwire Technology Limited | 86723 | £74,622.50 | Project Contractors |
ECGD | ECGD | 11 Nov 24 | Project Agency - Specialist Cont | Change Board | Softwire Technology Limited | 86729 | £53,462.50 | Project Contractors |
ECGD | ECGD | 11 Nov 24 | IT Managed Service Transformation | ITD | Risual Ltd | 86746 | £21,704.12 | Technical Services |
ECGD | ECGD | 11 Nov 24 | IT Cloud and Hosting | ITD | Bytes Software Services Ltd | 86750 | £76,449.20 | IT Systems |
ECGD | ECGD | 11 Nov 24 | IT Software Licensing & Subscription | ITD | Bytes Software Services Ltd | 86751 | £60,471.30 | Technical Services |
ECGD | ECGD | 11 Nov 24 | Legal Fees transactions | LD | J.P. Morgan SE | 86753 | £25,000.00 | Legal Services (Recoverable) |
ECGD | ECGD | 11 Nov 24 | Project Agency - Specialist Cont | Change Board | Softwire Technology Limited | 86756 | £22,800.00 | Project Contractors |
ECGD | ECGD | 15 Nov 24 | Project Agency - Specialist Cont | Change Board | Softwire Technology Limited | 86778 | £50,225.00 | Project Contractors |
ECGD | ECGD | 18 Nov 24 | Overseas Export Managers | Business Group | Foreign & Commonwealth Office | 86781 | £68,836.71 | Overseas staff |
ECGD | ECGD | 21 Nov 24 | Shared Services Costs | HRD | Cabinet Office | 86798 | £188,398.77 | Employment Cost |
ECGD | ECGD | 25 Nov 24 | Project Consultancy Costs | Change Board | KPMG | 86809 | £38,698.00 | Project Consultancy |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Farsight Consulting Ltd | 86812 | £99,001.25 | Project Contractors |
ECGD | ECGD | 25 Nov 24 | Project Agency - Specialist Cont | Change Board | Ceox Services Ltd | 86819 | £35,468.67 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Agency - Interim Managers | FCD | Alexander Mann Solutions | 86823 | £3,130.50 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Interim Managers | FCD | Alexander Mann Solutions | 86823 | £3,130.50 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Interim Managers | FOD | Alexander Mann Solutions | 86823 | £6,159.30 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 86823 | £525.05 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Interim Managers | HRD | Alexander Mann Solutions | 86823 | £2,625.25 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 86823 | £3,412.80 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Specialist Contractors | DDD | Alexander Mann Solutions | 86823 | £3,412.80 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 86823 | £3,584.00 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 86823 | £1,443.90 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Specialist Contractors | Risk Approval Division | Alexander Mann Solutions | 86823 | £3,721.25 | interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Temporary Staff | DDD | Alexander Mann Solutions | 86823 | £919.45 | interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Temporary Staff | FCD | Alexander Mann Solutions | 86823 | £958.30 | interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86823 | £804.24 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86823 | £958.30 | Interim Staff costs |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £18.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £1,539.81 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £1,539.81 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,252.80 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,329.60 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,347.90 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,373.95 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,560.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,831.35 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,831.35 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £2,869.65 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,028.77 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,391.40 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,391.40 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,456.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,521.80 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,584.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,584.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,584.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,592.90 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,592.90 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,652.25 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,652.25 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £3,937.85 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £4,106.20 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £4,106.20 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £4,106.20 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £4,174.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86823 | £4,174.00 | Project Contractors |
ECGD | ECGD | 26 Nov 24 | Marketing | MC | Manning Gottlieb OMD | 86828 | £64,640.00 | Marketing and Communication |
ECGD | ECGD | 28 Nov 24 | IT Managed Services | ITD | Risual Ltd | 86831 | £131,671.11 | Technical Services |
ECGD | ECGD | 28 Nov 24 | Market Analysis | SSIG | Sustainable Finance & Insurance | 86838 | £40,040.00 | Market Analysis |
ECGD | ECGD | 28 Nov 24 | Agency - Interim Managers | FCD | Alexander Mann Solutions | 86841 | £3,130.50 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Interim Managers | FOD | Alexander Mann Solutions | 86841 | £6,159.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Specialist Contractors | IA | Alexander Mann Solutions | 86841 | £3,584.00 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Specialist Contractors | MC | Alexander Mann Solutions | 86841 | £1,443.90 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Specialist Contractors | Risk Approval Division | Alexander Mann Solutions | 86841 | £3,721.25 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | DDD | Alexander Mann Solutions | 86841 | £867.65 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | DDD | Alexander Mann Solutions | 86841 | £919.45 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | FCD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £485.90 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £582.75 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £602.18 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £647.86 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £647.86 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £647.86 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £731.64 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £777.00 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £802.90 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £804.24 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £910.57 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £910.57 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £910.57 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £958.30 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £1,045.93 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | HRD | Alexander Mann Solutions | 86841 | £2,100.20 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | ITD | Alexander Mann Solutions | 86841 | £695.03 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Agency - Temporary Staff | ITD | Alexander Mann Solutions | 86841 | £695.03 | Interim Staff costs |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £1,899.16 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £2,048.00 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £2,329.60 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £2,347.90 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £2,566.38 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £2,713.12 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £2,869.65 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,072.00 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,150.28 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,225.60 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,225.60 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,365.30 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,391.40 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,592.90 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,592.90 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,652.25 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £3,652.25 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £4,106.20 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £4,174.00 | Project Contractors |
ECGD | ECGD | 28 Nov 24 | Project Agency - Specialist Cont | Change Board | Alexander Mann Solutions | 86841 | £4,174.00 | Project Contractors |