Homes England commercial pipeline
Updated 2 February 2024
Download CSV 8.83 KB
ID | Business Area* | Contract Title* | Short Description* | Commercial Strategy* | Existing Contract End Date* | Estimated Procurement Start Date* | Estimated Contract Start Date* | Estimated Contract Length (in months)* | Estimated Value* | Procurement Route* | Framework* | Framework Lot* | Spend Category* | Pro Contract Reference | External Notes* |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
9569 | Development | Northstowe - WP2B Phase 2 (West) Site Clearance and Earthworks | Phase 2 Site Wide Clearance and Earthworks Outline Scope The scope of work relates to site wide clearance of remaining areas of Phase 2, including removing former ministry of defence below ground structures, disused utilities, vegetation and completing strategic engineering earthworks. The main activities, are earthworks driven, and encompass the following: 1. Contractor Site set up and enabling works 2. Utility and ground Surveys (Ground Penetration Radar) 3. Tree Protection and Ecological Management Compliance 4. Site Clearance encompassing, vegetation and tree removal, topsoil removal and removal of hard standings, debris, waste, disused drainage, utilities and remediation of contaminated land if encountered. 5. Site remediation within areas outlined within planning approved site wide ground remediation method statement, inclusive of verification and validation. 6. Strategic Engineering earthworks to the permanent earthworks’ development levels, upon completion of site clearance and deposition of site won or imported material, to accommodate either volumetric deficiencies or earthworks remediation requirements 7. Earthworks shall comply with the planning approved site wide remediation method statement and technical specifications being developed by Arcadis as well as permitted planning consent discharged by way of reserved matters. | New requirement | Not set | 14/12/2023 | 18/03/2024 | 6 | £3,500,000.00 | Open | N/A | Not set | Construction | DN702588 | Deadline 19/02/2024 |
9568 | Development | Northstowe - WP5 Phase 3a1 and 3a2 Infrastructure | Northstowe work package 5, phase 3a1 and 3a2 Infrastructure works. | New requirement | Not set | 24/10/2024 | 07/04/2025 | 44 | £52,000,000.00 | Unknown | Not set | Not set | Construction | Not set | Not set |
9567 | Development | Northstowe - WP4 Rampton Road Greenway and West Phase 1 Connection | Northstowe - WP4 Rampton Road Greenway and West Phase 1 Connection works | New requirement | Not set | 17/01/2025 | 07/07/2025 | 18 | £4,948,000.00 | Open | Not set | Not set | Construction | Not set | Not set |
9566 | Development | Northstowe - WP3 Remaining Phase 2 Site Wide Highways and Infrastructure | Northstowe - WP3 Remaining Phase 2 Site Wide Highways and Infrastructure works. | New requirement | Not set | 20/01/2025 | 25/08/2025 | 27 | £27,552,880.00 | Unknown | Not set | Not set | Construction | Not set | Not set |
9563 | Development | Burtree Infrastructure Delivery (Phase 1) | Tender to appoint delivery partner for the phase 1 infrastructure at Burtree Garden Village. Construction of access roundabout, spine road and secondary roads, attenuation basins, utilities, foul and surface water drainage, new park and landscaping with associated earthworks. | New requirement | Not set | 25/03/2024 | 17/06/2024 | 18 | £27,000,000.00 | Open | Not set | Not set | Construction | Not set | Timescales may change |
9504 | Development | Brookleigh, Early Planting Works | To appoint a plant nursery to enter into a contract growing agreement to supply approximately 400,000 native plants for a site in south-east England, comprising of whips, standard trees and heavy standard trees. The works programme will potentially be phased over two planting seasons planting seasons. | New requirement | Not set | 18/03/2024 | 19/08/2024 | 53 | £2,000,000.00 | Open | N/A | Not set | Facilities | DN653421 | Not set |
9503 | Development | Northstowe Civils Works | Typical scope under this contract comprise of, but are not exclusively limited to the following: • Reactive/ Emergency response highway maintenance and Highway winter maintenance; Pre-treatment, Post-treatment, Clearance of ice and snow. Fences and safety barriers repairs , Flooding Traffic signal junctions, Toucan Crossings, Pegasus Crossing and other emergencies • Routine activities that could include: Drainage systems – cleansing/jetting pipes/gully emptying, Headwall cleansing, Attenuation pond cuttings slopes, Road sweeping, Footway sweeping, , Road sign cleaning, Traffic junction signs and bollards – cleansing and repair, Road markings and studs – replacement, Lighting installations – cleansing and repair, Bridges and structures – cleansing and minor works only if required, Traffic signal junctions, Toucan Crossings, Pegasus Crossing • Regulatory maintenance: Maintenance of Highway Register and Definitive Map Co-ordination to be to be completed by Homes England or representative. Other regulatory functions – encroachment, illegal signs, parking etc • Site inspections, whereby the Supplier shall indicate; all matters relating to the maintenance specification, recommendations for necessary Service, incidences of vandalism, fly tipping, trespass and adjustments to the scheduled Service; | New requirement | Not set | 19/02/2024 | 01/08/2024 | 36 | £2,000,000.00 | Open | N/A | Not set | Facilities | Not set | Not set |
9447 | Investment | Financial Due Diligence for Investment Decisions | Provision of a broad range of financial due diligence services to support the Investments team | New requirement | Not set | 12/02/2024 | 13/05/2024 | 48 | £10,000,000.00 | Framework - Further Competition | CCS - RM6269 | Not set | Professional Services | Not set | May be split into 2 procurements |
102 | Development | Attleborough Infrastructure Works | The works contract will be for a roundabout access, high street (600m long) with seven bellmouths to development parcels, and associated utilities conduits, foul and surface water drainage with the option to add a signal controlled T-junction, a section of link road (550m long) with four bellmouths to development parcels, a second roundabout access, and all associated utilities conduits, foul and surface water drainage. This contract will be a design and build contract with the contractor expected to produce construction level drawings from a substantially developed design, which may or may not have technical approval at the time of entering into contract. | New requirement | Not set | 01/07/2024 | 14/10/2024 | 12 | £9,000,000.00 | Framework - Further Competition | CCS - RM6088 | 3.2 | Construction | Not set | Not set |
97 | Development | SW Rugby - Homestead Link Road | Homestead Link Road (HLR) is the primary piece of highway infrastructure required to unlock circa 5,000 new homes, primary and secondary schools, a new neighbourhood centre, 35 hectares of employment land and green infrastructure. Works include 2km of single lane carriageway, roundabouts, footways and cycleways, streetlighting, utilities and services and circa 180,000m2 of new public open space including soft landscaping and planting. | New requirement | Not set | 12/02/2024 | 03/06/2024 | 12 | £15,000,000.00 | Open | N/A | Not set | Construction | DN689253 | Not set |
96 | Development | Ripon Barracks - Demolition Works | Demolition Works - Deverell Barracks | New requirement | Not set | 01/03/2025 | 01/09/2025 | 10 | £4,500,000.00 | Open | N/A | Not set | Construction | Not set | Not set |
94 | Development | Brookleigh (Northern Arc) Burgess Hill offsite mobility corridor works | To appoint a contractor for the Mobility Corridors works on the Brookleigh scheme in Burgess Hill West Sussex. The works, which involves alterations to the existing highways network comprising mainly of pavement widening within existing carriageways, will be carried out as a single contract albeit in two Stages. The anticipated dates are, Stage One will commence on site in June 2023 and complete in December 2023, and Stage Two will commence on site in January 2024 | New requirement | Not set | 20/05/2024 | 16/09/2024 | 21 | £3,000,000.00 | Open | N/A | Not set | Construction | DN651110 | Not set |
92 | Development | Chalgrove Offsite Highways Works | The works contract is for the construction of two bypass highways to the B480 around the existing towns of Cuxham and Stadhampton. The works would include all associated highways drainage infrastructure, crossings, and junctions. Two river crossings are required which may require bridge or culvert structures. The contract is anticipated to be tendered on a design and build basis. | New requirement | Not set | 19/08/2024 | 25/11/2024 | 21 | £35,000,000.00 | Unknown | Not set | Not set | Construction | Not set | Not set |
85 | Development | Whittingham Hospital Sports Pavilion & Social Club | Refurbishment of Sports Pavilion and demolition works | New requirement | Not set | 01/04/2024 | 01/11/2024 | 9 | £6,728,000.00 | Open | N/A | Not set | Construction | DN686458 | Not set |
81 | Development | Ifield - Phase 1 Infrastucture | Infrastructure Works | New requirement | Not set | 01/05/2025 | 02/01/2026 | 24 | £40,000,000.00 | Framework - Further Competition | CCS - RM6088 | 3.2 | Construction | Not set | Not set |
66 | Development | Strategic Research Evaluation and Analysis Framework | Replacement framework for Strategic Research Evaluation and Analysis | Re-procurement (different scope) | 13/12/2024 | 24/04/2024 | 14/12/2024 | 48 | £15,000,000.00 | Open | N/A | Not set | Professional Services | Not set | PIN published 29/01/24 . Subject to Cabinet Office approval. |
64 | Development | Development Management and Monitoring Framework | Replacement framework (TBC) for Development Management and Monitoring | Re-procurement (different scope) | 04/05/2025 | 01/10/2024 | 05/05/2025 | 48 | £30,000,000.00 | Open | N/A | Not set | Professional Services | Not set | Subject to Cabinet Office Approval |