Defra commercial pipeline data: Quarter 2 2020-21
Updated 30 October 2020
Download CSV 59.4 KB
Reference Number | Business Area | Short Description | Title | Commercial Strategy | Exisiting Contract End | Next Business Case Stage | Next Business Case Stage Date | Procurement Start Date | Contract Commencement Date | New Contract End Date | New Contract Value GBP | Procurement Sourcing Route | Level Of Competition | Spend Category | Spend Sub Category | Contract Tiering | Existing Supplier | Main Contact |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
project_31252 | EA - Operations NS PCM East | East CDF_ Great Yarmouth Epoch 3 Construction | Infrastructure PDU7 Pipeline Header | New requirement | N/A | Procurement Strategy | 23/04/2019 | 23/01/2019 | 01/01/2020 | 31/12/2020 | £27,000,000 | Direct Award Under Framework | Direct Award Under Framework | U72.00.00.00 | Building and Construction and Maintenance Services | TBC | N/A | Ruksar Din |
project_24826 | EA - Operations NS PCM North | Kendal FRMS Phase 1a | Kendal FRMS Phase 1a | New requirement | N/A | Procurement Strategy | 10/01/2019 | 12/10/2018 | 01/05/2019 | 29/05/2020 | £10,000,000 | Competition Under Framework | Competition Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Joanne Sumner |
project_26205 | EA - Operations NS PCM North | PDU 7 - WEM Lot 4 - Radcliffe and Redvales Phase 2 | PDU 7 - WEM Lot 4 - Radcliffe and Redvales Phase 2 | New requirement | N/A | Procurement Strategy | 16/06/2019 | 18/03/2019 | 03/06/2019 | 30/06/2020 | £15,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Joanne Sumner |
project_26523 | EA - Operations NS PCM North | River Roch, Rochdale & Littleborough | River Roch, Rochdale & Littleborough | New requirement | N/A | Procurement Strategy | 25/07/2019 | 26/04/2019 | TBC | TBC | £17,000,000 | Direct Award Under Framework | Direct Award Under Framework | U99.12.17.18 | Flood Engineering | Gold | N/A | Dawn Faulkner-Brown |
project_26629 | EA - Operations NS PCM North | Rickerby Flood Alleviation Scheme - PDU7 Lot 4 | Rickerby Flood Alleviation Scheme - PDU7 Lot 4 | New requirement | N/A | Procurement Strategy | 29/07/2019 | 30/04/2019 | 01/06/2019 | 03/04/2020 | £3,300,000 | Direct Award Under Framework | Direct Award Under Framework | U72.13.17.00 | ## Infrastructure construction | Silver | N/A | Dawn Faulkner-Brown |
project_27076 | EA - Operations NS PCM North | PIPELINE Infrastructure Leeds FAS Phase 2 NFM Programme (EA delivery) | PIPELINE Infrastructure Leeds FAS Phase 2 NFM Programme (EA delivery) | New requirement | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £15,844,000 | Direct Award Under Framework | Direct Award Under Framework | U99.12.17.18 | Flood Engineering | TBC | N/A | Rachael Burton |
project_27079 | EA - Operations NS PCM North | Pipeline Land Drainage Pumping Station Investigations&Refurbishment | Pipeline Land Drainage Pumping Station Investigations&Refurbishment | New requirement | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £15,750,000 | Direct Award Under Framework | Direct Award Under Framework | U99.12.17.18 | Flood Engineering | TBC | N/A | Rachael Burton |
project_27492 | EA - FCRM Allocation and Asset Man | National MEICA Maintenance & Project Framework | National MEICA Maintenance & Project Framework | New requirement | N/A | Procurement Strategy | 06/11/2019 | 08/08/2019 | 30/10/2020 | 30/10/2028 | £60,000,000 | Competitive with Negotiation | Competitive with Negotiation | U99.18.12.12 | Engineering Materials - Unclassified | TBC | N/A | Joanne Sumner |
project_31289 | EA - Operations NS PCM North | Pipeline - Preston & South Ribble FRMS ECC | Pipeline - Preston & South Ribble FRMS ECC | New requirement | N/A | Procurement Strategy | 31/03/2021 | 01/06/2021 | 01/07/2021 | 01/07/2023 | £40,000,000 | Competition Under Framework | Competition Under Framework | U99.12.17.18 | Flood Engineering | Gold | N/A | Dawn Faulkner-Brown |
project_31291 | EA - Operations NS PCM North | Pipeline - Kendal FRMS Phase 2&3 ECC | Pipeline - Kendal FRMS Phase 2&3 ECC | New requirement | N/A | Procurement Strategy | 31/03/2021 | 01/09/2021 | 01/10/2021 | 01/10/2023 | £50,000,000 | Competition Under Framework | Competition Under Framework | U99.12.17.18 | Flood Engineering | Gold | N/A | Joanne Sumner |
project_31294 | EA - Operations NS PCM North | Pipeline - Team Valley FAS ECC | Pipeline - Team Valley FAS ECC | New requirement | N/A | Procurement Strategy | 31/03/2021 | 19/01/2021 | 01/10/2021 | 01/12/2023 | £11,000,000 | Competition Under Framework | Competition Under Framework | U99.12.17.18 | Flood Engineering | bRONZE | N/A | Dawn Faulkner-Brown |
project_26462 | EA - Operations NS PCM South | Lydd Ranges Sea Defences | Lydd Ranges Sea Defences | New requirement | N/A | Procurement Strategy | 24/06/2019 | 01/01/2021 | 31/10/2020 | 31/10/2022 | £25,000,000 | Competition Under Framework | Competition Under Framework | U72.13.17.00 | ## Infrastructure construction | Gold | N/A | Derek Matthews |
project_26601 | EA - Operations NS PCM South | Infrastructure CDF Thorney Island Construction | Infrastructure CDF Thorney Island Construction | New requirement | N/A | Procurement Strategy | 31/05/2020 | 02/03/2020 | 30/06/2020 | 31/03/2021 | £12,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Silver | N/A | Jessica Morris |
project_26626 | EA - Operations NS PCM South | THM CDF Lot 2 Reading - Caversham FAS Construction | THM CDF Lot 2 Reading - Caversham FAS Construction | New requirement | N/A | Procurement Strategy | 02/03/2022 | 02/12/2021 | 01/04/2022 | 31/08/2023 | £30,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Javier Nagore |
project_26771 | EA - Operations NS PCM South | THM CDF Lot 2 - Guildford FAS Construction | THM CDF Lot 2 - Guildford FAS Construction | New requirement | N/A | Procurement Strategy | 02/05/2022 | 01/02/2022 | 01/06/2022 | 30/06/2023 | £35,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Javier Nagore |
project_28205 | EA - Operations NS PCM South | SSD - CDF Lot 2 - River Itchen Construction | SSD - CDF Lot 2 - River Itchen Construction | New requirement | N/A | Procurement Strategy | 01/04/2021 | 01/04/2021 | 01/04/2021 | 31/10/2023 | £45,000,000 | Direct Award Under Framework | Direct Award Under Framework | U72.13.17.00 | ## Infrastructure construction | Gold | N/A | Derek Matthews |
project_28215 | EA - Operations NS PCM South | SSD - CDF Lot 2 - Hurst Spit Construction | SSD - CDF Lot 2 - Hurst Spit Construction | New requirement | N/A | Procurement Strategy | 29/02/2020 | 01/12/2019 | 01/10/2027 | 31/03/2030 | £33,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Michael Feest |
project_28245 | EA - Operations NS PCM South | THM CDF lot 2 - Byfleet Construction | THM CDF lot 2 - Byfleet Construction | New requirement | N/A | Procurement Strategy | 31/03/2022 | 31/12/2021 | 30/05/2022 | 31/03/2023 | £20,000,000 | Competition Under Framework | Competition Under Framework | U99.16.16.16 | ## Construction - Unclassified | Gold | N/A | Javier Nagore |
project_28248 | EA - Operations NS PCM South | THM - CDF Lot 2 - Thames Valley Flood Storage - Construction | THM - CDF Lot 2 - Thames Valley Flood Storage - Construction | New requirement | N/A | Procurement Strategy | 30/06/2022 | 01/04/2022 | 01/04/2024 | 30/11/2028 | £500,000,000 | Competitive with Negotiation | Competitive with Negotiation | U81.10.15.00 | Civil engineering | Gold | N/A | Michael Feest |
project_29621 | EA - Operations NS PCM South | Thames Estuary Asset Management 2100 programme (TEAM2100) part 2 | Thames Estuary Asset Management 2100 programme (TEAM2100) part 2 | Re-Procurement Different Scope | N/A | Procurement Strategy | 06/11/2024 | 08/08/2024 | 06/11/2024 | 05/11/2034 | £500,000,000 | Competitive Sub OJEU | Competitive Sub OJEU | U99.16.16.16 | ## Construction - Unclassified | Gold | N/A | Javier Nagore |
project_30345 | EA - Operations NS PCM South | SSD – SE CDF Lot 2 – Ventnor Coastal Protection – Construction | SSD – SE CDF Lot 2 – Ventnor Coastal Protection – Construction | New requirement | N/A | Procurement Strategy | 02/01/2024 | 04/10/2023 | 01/04/2024 | 31/03/2026 | £29,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Silver | N/A | Jessica Morris |
project_30360 | EA - Operations NS PCM South | KSL - SE CDF Lot 2 - MEASS Medway Towns Frontage Improvements - Construction | KSL - SE CDF Lot 2 - MEASS Medway Towns Frontage Improvements - Construction | New requirement | N/A | Procurement Strategy | 05/06/2023 | 06/04/2023 | 03/10/2023 | 03/10/2024 | £13,800,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Silver | N/A | Michael Feest |
project_30363 | EA - Operations NS PCM South | KSL - SE CDF Lot 2 - MEASS North Medway Frontage Improvements - Construction | KSL - SE CDF Lot 2 - MEASS North Medway Frontage Improvements - Construction | New requirement | N/A | Procurement Strategy | 05/06/2023 | 06/04/2023 | 03/10/2023 | 03/10/2025 | £15,100,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Silver | N/A | Michael Feest |
project_30366 | EA - Operations NS PCM South | KSL - SE CDF Lot 2 - MEASS Sheerness Frontage Improvements - Construction | KSL - SE CDF Lot 2 - MEASS Sheerness Frontage Improvements - Construction | New requirement | N/A | Procurement Strategy | 05/06/2023 | 06/04/2023 | 03/10/2023 | 03/10/2025 | £10,400,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Silver | N/A | Michael Feest |
project_30369 | EA - Operations NS PCM South | KSL - SE CDF Lot 2 - MEASS South Sheppey Frontage Improvements - Construction | KSL - SE CDF Lot 2 - MEASS South Sheppey Frontage Improvements - Construction | New requirement | N/A | Procurement Strategy | 05/07/2023 | 06/04/2023 | 03/10/2023 | 03/10/2025 | £31,500,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Michael Feest |
project_30414 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Ventnor Coastal Protection - Construction | SSD - SE CDF Lot 2 - Ventnor Coastal Protection - Construction | New requirement | N/A | Procurement Strategy | 01/01/2026 | 03/10/2025 | 01/04/2026 | 31/03/2027 | £29,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Silver | N/A | Jessica Morris |
project_30457 | EA - Operations NS PCM South | KSL - SE CDF Lot 2 - Stour pumping stations refurbishments Construction | KSL - SE CDF Lot 2 - Stour pumping stations refurbishments Construction | New requirement | N/A | Procurement Strategy | 01/05/2023 | 31/01/2023 | 30/06/2023 | 24/06/2024 | £13,000,000 | Competition Under Framework | Competition Under Framework | U72.00.00.00 | Building and Construction and Maintenance Services | Gold | N/A | Javier Nagore |
project_30460 | EA - Operations NS PCM South | KSL - SE CDF Lot 2 - TE2100 Habitat Creation Construction | KSL - SE CDF Lot 2 - TE2100 Habitat Creation Construction | New requirement | N/A | Procurement Strategy | 30/05/2023 | 01/03/2023 | 28/08/2023 | 25/08/2025 | £18,000,000 | Competition Under Framework | Competition Under Framework | U99.16.16.16 | Civil engineering | Gold | N/A | Javier Nagore |
project_27072 | EA - Operations NS PCM North | PIPELINE Infrastructure Humber: Estuary-wide Monitoring | PIPELINE Infrastructure Humber: Estuary-wide Monitoring | New requirement | N/A | Procurement Strategy | 01/01/2022 | 01/01/2024 | 01/01/2025 | 01/01/2026 | £11,523,564 | Direct Award Under Framework | Direct Award Under Framework | U99.12.17.18 | Flood Engineering | TBC | N/A | Rachael Burton |
project_27075 | EA - Operations NS PCM North | PIPELINE Infrastructure Bradford Aire Catchment FAS | PIPELINE Infrastructure Bradford Aire Catchment FAS | New requirement | N/A | Procurement Strategy | 01/01/2027 | 01/01/2027 | 01/01/2028 | 01/01/1930 | £15,924,188 | Direct Award Under Framework | Direct Award Under Framework | U99.12.17.18 | Flood Engineering | TBC | N/A | Rachael Burton |
project_30602 | EA - Operations North | NE CDF Lot 2 Dutch River (left-bank): Went Outfall to River Ouse Confluence Cons | NE CDF Lot 2 Dutch River (left-bank): Went Outfall to River Ouse Confluence Cons | New requirement | N/A | Procurement Strategy | 03/09/2023 | 04/08/2023 | 01/01/2024 | 03/09/2025 | £10,360,000 | Direct Award Under Framework | Direct Award Under Framework | U72.13.17.00 | ## Infrastructure construction | Bronze | N/A | Graham Duddle |
project_30606 | EA - Operations North | NE CDF Lot 2 Keighley and Stockbridge Flood Alleviation Construction | NE CDF Lot 2 Keighley and Stockbridge Flood Alleviation Construction | New requirement | N/A | Procurement Strategy | 03/09/2024 | 04/08/2024 | 01/01/2025 | 03/09/2027 | £10,269,700 | Direct Award Under Framework | Direct Award Under Framework | U72.13.17.00 | Flood Engineering | Bronze | N/A | Graham Duddle |
project_29065 | Defra | SCAH Transformational Change Consultant | SCAH Transformational Change Consultant | New requirement | N/A | Procurement Strategy | 29/10/2020 | 01/11/2020 | 01/05/2021 | 31/03/2030 | £10,000,000 | Competition Under Framework | Competition Under Framework | U99.12.12.12 | Professional Services Other - Unclassified | Gold | N/A | Dawn Donaldson |
project_29121 | Defra | SCAH - Science Hub - Design | SCAH - Science Hub - Design | New requirement | N/A | Procurement Strategy | 01/05/2021 | 01/07/2021 | 31/12/2021 | 31/03/2024 | £43,000,000 | Restricted OJEU | Restricted OJEU | U99.12.12.12 | Professional Services Other - Unclassified | Gold | N/A | Dawn Donaldson |
project_29703 | Defra | SCAH Programme Manager | SCAH Programme Manager | New requirement | N/A | Procurement Strategy | 01/01/2021 | 01/02/2021 | 01/06/2021 | 31/12/2031 | £38,000,000 | Competition Under Framework | Competition Under Framework | U99.12.12.12 | Professional Services Other - Unclassified | Gold | N/A | Josh Jackson |
project_30081 | APHA – Science | SCAH - Project Management | SCAH - Project Management & Cost Management-General Building | New requirement | N/A | Procurement Strategy | 01/03/2021 | 01/05/2021 | 01/08/2021 | 31/12/2031 | £18,000,000 | Competition Under Framework | Competition Under Framework | U80.10.25.00 | Property and Construction Consultancy | Gold | N/A | Patrick Robinson |
TBC | APHA – Science | SCHA - Cost Consultant | SCAH - Project Management & Cost Management-General Building | New requirement | N/A | Procurement Strategy | 01/03/2021 | 01/05/2021 | 01/08/2021 | 31/12/2031 | £18,000,000 | Competition Under Framework | Competition Under Framework | U99.12.12.12 | Professional Services Other - Unclassified | Gold | N/A | Patrick Robinson |
project_23526 | EA - Operations NS PCM East | PDU 4 - Great Yarmouth Epoch 2 - WEM Lot 4 | PDU 4 - Great Yarmouth Epoch 2 - WEM Lot 4 | New requirement | N/A | Procurement Strategy | 14/08/2018 | 16/05/2018 | 16/05/2018 | 31/12/2021 | £24,000,000 | Competition Under Framework | Competition Under Framework | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Louise Vincent |
project_26588 | EA - Operations NS PCM East | Pipeline East - East Ruislip FAS - Construction - CDF Lot 2 | Pipeline East - East Ruislip FAS - Construction - CDF Lot 2 | New requirement | N/A | Procurement Strategy | 02/07/2021 | 03/04/2021 | 01/08/2021 | 01/08/2022 | £15,000,000 | Direct Award Under Framework | Direct Award Under Framework | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Louise Vincent |
project_29892 | EA - Operations NS PCM West | Mids - CDF lot 2 - Saffron Brook Tilting Gate - Post FBC Construction Option C | Mids - CDF lot 2 - Saffron Brook Tilting Gate - Post FBC Construction Option C | New requirement | N/A | Procurement Strategy | 04/05/2020 | 04/04/2020 | 01/09/2020 | 31/08/2021 | £100,000 | Competition Under Framework | Competition Under Framework | U99.16.16.16 | ## Construction - Unclassified | Bronze | N/A | Ben Rawlings |
project_29915 | TBC | Mids - CDF lot 2 - Loughborough - Post FBC Construction Option C | Mids - CDF lot 2 - Loughborough - Post FBC Construction Option C | New requirement | N/A | Procurement Strategy | 03/07/2020 | 04/04/2020 | 01/09/2020 | 31/08/2021 | £10,500,000 | Competition Under Framework | Competition Under Framework | U99.16.16.16 | ## Construction - Unclassified | GOLD | N/A | Liam Hall |
project_30084 | EA - Operations NS PCM East | Mids - MCF lot 1 - Saltfleet to Gibraltar Point Strategy – Beach Management | Mids - MCF lot 1 - Saltfleet to Gibraltar Point Strategy – Beach Management | Re-Procurement Same Scope | N/A | Procurement Strategy | 04/10/2020 | 06/07/2020 | 01/12/2020 | 31/07/2024 | £35,000,000 | Competition Under Framework | Competition Under Framework | U99.16.16.16 | ## Construction - Unclassified | Gold | N/A | Ben Rawlings |
project_30281 | EA - Operations West and Central | Stallingborough 3 - Construction | Stallingborough 3 - Construction | New requirement | N/A | Procurement Strategy | 03/07/2022 | 04/05/2022 | 01/09/2022 | 29/02/2024 | £13,000,000 | Direct Award Under Framework | Direct Award Under Framework | U99.16.10.10 | ## Construction Service Providers - Unclassified | Silver | N/A | Chris Cope |
project_30858 | EA - Operations West and Central | Mids - CDF Lot 2 - LNA Recovery SP01 - Capital | Mids - CDF Lot 2 - LNA Recovery SP01 - Capital | New requirement | N/A | Procurement Strategy | 21/11/2020 | 22/09/2020 | 31/08/2020 | 31/03/2021 | £10,000,000 | Direct Award Under Framework | Direct Award Under Framework | U99.16.10.10 | ## Construction Service Providers - Unclassified | Silver | N/A | Chris Cope |
project_31184 | EA - Operations NS PCM East | Mids - CDF lot 2 - Navigation ALN | Mids - CDF lot 2 - Navigation ALN | New requirement | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | 25000000 | Competition Under Framework | Competition Under Framework | U99.16.16.16 | ## Construction - Unclassified | Gold | N/A | Ben Rawlings |
Project 30565 | Defra | Innovation Research and Development - Farming Productivity - Strand 3 | Innovation Research and Development - Farming Productivity - Strand 3 | New requirement | N/A | Procurement Strategy | TBC | 12/10/2020 | 01/02/2022 | 31/01/2025 | £10,000,000 | Open OJEU | Open OJEU | U80.18.00.00 | Business Process Outsourcing Services | Gold | n/a | Graham Read |
ecm_1159 | Defra DDTS | Provision of IT Services for DEFRA. HEADER RECORD ONLY. ALL DOCUMENTS STORED BY DAVID LIGHT'S TEAM. IBM Contract managed by David Light's team. Contract extended to 31.7.19, confirmed by David Light on 8.12.17. Extended to 31st March, 2021 with two further optional 1 year contracts to 31st January, 2023. HOSTING | The Enabling Contract | Extension | 30/03/2021 | Procurement Strategy | 03/07/2020 | 04/04/2020 | 31/03/2021 | 30/03/2022 | £1,500,000,000 | Open OJEU | Open OJEU | U81.11.22.00 | Software maintenance and support | Gold | IBM | Keith Morgan |
ecm_42947 | Defra - DDTS | To provide a capability to operate, support and maintain the Genesis services, systems and applications to defined service levels. The scope also includes the leadership and delivery of service enablement tools, security management, service integration, solution delivery and strategic service management. | Application Maintenance and Support with Systems and Service Integration for the Genesis IT Application | Extension | 31/01/2021 | Procurement Strategy | 06/05/2020 | 06/02/2020 | 01/02/2021 | 05/05/2022 | £15,942,807 | Open OJEU | Open OJEU | U99.23.12.12 | IT Managed / Outsourced Services - Unclassified | Gold | Atos | Ben Freeman |
ecm_51662 | Defra - DDTS | Defra - Service Desk | Defra - Service Desk | Extension | 30/01/2022 | Procurement Strategy | 05/05/2021 | 04/02/2021 | 31/01/2022 | 31/01/2023 | £10,222,000 | Open OJEU | Open OJEU | U99.23.12.12 | IT Managed / Outsourced Services - Unclassified | Gold | Capgemini UK plc | Liam Mckenna |
project_31104 | Defra - PSCH & DG Offices | ERP Replacement - SaaS Element | ERP Replacement - SaaS Element | New requirement | N/A | Procurement Strategy | 06/01/2021 | 08/10/2020 | 01/04/2021 | 31/03/2028 | £50,000,000 | Competition Under Framework | Competition Under Framework | U81.11.25.00 | Application Software (SaaS) | Gold | N/A | David Preece |
project_31105 | Defra - PSCH & DG Offices | ERP Replacement - Implementation Partner | ERP Replacement - Implementation Partner | New requirement | N/A | Procurement Strategy | 06/01/2021 | 08/10/2020 | 01/04/2021 | 31/03/2024 | £25,000,000 | Competition Under Framework | Competition Under Framework | U43.23.16.00 | ## Finance accounting and enterprise resource planning ERP software | Gold | N/A | David Preece |
project_26725 | Defra | Project Mercury (Defra Unified Communications Replacement) | Project Mercury (Defra Unified Communications Replacement) | Re-Procurement Different Scope | N/A | Procurement Strategy | 31/07/2019 | 02/05/2019 | 01/04/2021 | 31/03/2026 | £25,000,000 | Competition Under Framework | Competition Under Framework | U81.16.17.00 | Telecommunication Services | Gold | N/A | Pamela Kelsall |
ecm_50532 | Defra DDTS | The provision and support and maintenance of the IT Infrastructure | Master Services Agreement for Service Procurement | Extension | 31/03/2021 | Procurement Strategy | TBC | TBC | TBC | TBC | £740,000,000 | Open OJEU | Open OJEU | U99.23.12.12 | IT Managed / Outsourced Services - Unclassified | Gold | Capgemini UK plc | Andy Lockwood |
ecm_48578 | Defra - DDTS | Provision of a resource to provide contingent labour. This resource will supplement our existing specialist IT skills and experience, to provide capacity and resilience within our workforce. The work centres around several key areas: - Transformation of our IT, making data sets publically available and moving into the digital world - Moving to a new, multi-supplier operating model - Maintaining ‘business as usual’ IT services The requirement also includes the following Generic Requirements • Provide timely contingent labour solutions for ICT positions across the Defra Group using market intelligence to support each search and provide strong, accurate and concrete hiring recommendations; • Regularly meet with Defra Group staff to enhance understanding of the organisation and its core activities, and the specific requirements of each role; • Provide information on how electronic timesheeting and invoicing will operate; • Produce quality CVs for potential hires within agreed timescales, with right first time CVs and following through promptly to secure candidates and onboard; • Ensure that attracting a diverse range of candidates underpins all our recruitment activity; • Provide Management Information for searches, including diversity and time to hire statistics; • Provide Management Information monthly, from labour market intelligence on permanent and temporary resource, including skills availability, location of skills, average salary/rates for each skillset and future trends; • Provide rigorous referencing and qualification checks on successful candidates; Ensure all submitted candidates have the right to work in the UK and have appropriate baseline personnel security checks, including higher level security checks in some cases; • Where the service involves the processing of personal data, the supplier shall comply with the requirements of the Data Protection Act 1998. Reference code was 23630 | Provision of an ICT contractor resource using RM971 Lot 5 IT Professionals Supply | Renew | 05/03/2021 | Procurement Strategy | 04/01/2021 | 06/10/2020 | 06/03/2021 | 05/03/2025 | £156,000,000 | Competition Under Framework | Competition Under Framework | U80.11.16.08 | Temporary information technology software developers | Gold | Hays Specialist Recruitment Ltd | Dale Clark-Thompson |
ecm_43097 | Defra - Network Corporate Services | Travel Tickets | Defra Travel and Accommodation Contract | Extension | 28/02/2021 | Procurement Strategy | 30/11/2020 | 31/10/2020 | 01/03/2021 | 25/09/2022 | £30,000,000 | Direct Award Under Framework | Direct Award Under Framework | U78.11.16.00 | Passenger railway transportation | Bronze | Redfern Travel Limited | Sahdia Afzal |
ecm_46622 | EA - Corporate Affairs | Environment Agency Signage Contract | Environment Agency Signage Contract | renew | 31/03/2021 | Procurement Strategy | 31/12/2020 | 01/11/2020 | 01/04/2021 | TBC | £12,110,000 | Competition Under Framework | Competition Under Framework | U55.12.00.00 | Signage and accessories | Silver | ALLSIGNS INTERNATIONAL LTD | Sahdia Afzal |
ecm_48270 | EA - RLS CASHEW | SIMAR - Lot 2 - Commercial Vehicles | SIMAR - Lot 2 - Commercial Vehicles | Extension | 31/10/2021 | Procurement Strategy | 04/01/2021 | 05/11/2020 | 01/11/2021 | 31/10/2022 | £20,576,000 | Open OJEU | Open OJEU | U78.18.01.00 | Vehicle maintenance & repair services | Silver | Rivus Fleet Solutions | David Pembry |
ecm_54020 | EA - RLS CASHEW | Framework for the Supply of Tractors and Associated Equipment | Framework for the Supply of Tractors and Associated Equipment | Renew | 20/09/2021 | Procurement Strategy | 25/10/2020 | 25/09/2020 | 21/09/2021 | 21/09/2026 | £12,500,000 | Open OJEU | Open OJEU | U25.10.19.01 | ## Agricultural tractors | Bronze | C.J.Cox Ltd | David Pembry |
ecm_54021 | EA - RLS CASHEW | Framework for the supply of standard reach excavators and associated constructio | Framework for the supply of standard reach excavators and associated constructio | Renew | 10/10/2021 | Procurement Strategy | 14/11/2020 | 15/10/2020 | 11/10/2021 | 12/10/2026 | £10,000,000 | Open OJEU | Open OJEU | U22.00.00.00 | ## Building and Construction Machinery and Accessories | Bronze | CNH Industrial NV | David Pembry |
project_25770 | TBC | Geophysical surveys | Geophysical surveys | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Tracy White |
project_29426 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Thorney Island - OBC - FBC | SSD - SE CDF Lot 2 - Thorney Island - OBC - FBC | New requirement | N/A | Procurement Strategy | 31/01/2024 | 01/03/2021 | 01/08/2021 | 01/06/2022 | £500,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Jessica Morris |
project_29427 | EA - Operations NS PCM South | SSD - SE CDF Lot 1 - Farlington Marshes SOC - OBC - Consultant | SSD - SE CDF Lot 1 - Farlington Marshes SOC - OBC - Consultant | New requirement | N/A | Procurement Strategy | 30/10/2020 | 03/08/2020 | 07/12/2020 | 30/09/2021 | £230,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Gold | N/A | Rebecca Minter |
project_29428 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Farlington Marshes SOC - OBC - Contractor | SSD - SE CDF Lot 2 - Farlington Marshes SOC - OBC - Contractor | New requirement | N/A | Procurement Strategy | 30/10/2020 | 03/08/2020 | 01/12/2020 | 30/09/2021 | £240,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Gold | N/A | Rebecca Minter |
project_29429 | EA - Operations NS PCM South | SSD - SE CDF Lot 1 - Farlington Marshes OBC - FBC - Consultant | SSD - SE CDF Lot 1 - Farlington Marshes OBC - FBC - Consultant | New requirement | N/A | Procurement Strategy | 30/10/2020 | 30/06/2021 | 01/10/2021 | 30/09/2022 | £480,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Gold | N/A | Rebecca Minter |
project_29430 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Farlington Marshes OBC - FBC - Contractor | SSD - SE CDF Lot 2 - Farlington Marshes OBC - FBC - Contractor | New requirement | N/A | Procurement Strategy | 30/10/2020 | 30/06/2021 | 01/10/2021 | 30/09/2022 | £120,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Gold | N/A | Rebecca Minter |
project_29431 | EA - Operations NS PCM South | SSD - SE CDF Lot 1 - Farlington Marshes Construction Design Support | SSD - SE CDF Lot 1 - Farlington Marshes Construction Design Support | New requirement | N/A | Procurement Strategy | 30/10/2020 | 30/06/2021 | 01/10/2021 | 30/09/2022 | £20,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Gold | N/A | Rebecca Minter |
project_29749 | EA - Operations NS PCM South | KSL - CDF Lot 1 - Navigation Supervisor | KSL - CDF Lot 1 - Navigation Supervisor | New requirement | N/A | Procurement Strategy | 11/10/2020 | 13/07/2020 | 16/11/2020 | 30/04/2021 | £20,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Jessica Morris |
project_30315 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Embankment Rd Refurbishment - Pre-SOC Contractor | SSD - SE CDF Lot 2 - Embankment Rd Refurbishment - Pre-SOC Contractor | New requirement | N/A | Procurement Strategy | 02/11/2020 | 04/08/2020 | 09/11/2020 | 31/03/2021 | £50,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Jessica Morris |
project_30316 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Ventnor Coastal Protection - Pre-SOC - Contractor | SSD - SE CDF Lot 2 - Ventnor Coastal Protection - Pre-SOC - Contractor | New requirement | N/A | Procurement Strategy | 02/11/2020 | 04/08/2020 | 09/11/2020 | 31/03/2021 | £50,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Jessica Morris |
project_30317 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Yverland Sea Wall Refurbishment - Pre-SOC - Contractor | SSD - SE CDF Lot 2 - Yverland Sea Wall Refurbishment - Pre-SOC - Contractor | New requirement | N/A | Procurement Strategy | 02/11/2020 | 04/08/2020 | 09/11/2020 | 31/03/2021 | £50,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Jessica Morris |
project_30318 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Shanklin Sea Wall Refurbishment - Pre-SOC - Contractor | SSD - SE CDF Lot 2 - Shanklin Sea Wall Refurbishment - Pre-SOC - Contractor | New requirement | N/A | Procurement Strategy | 02/11/2020 | 04/08/2020 | 09/11/2020 | 31/03/2021 | £50,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Jessica Morris |
project_30321 | EA - Operations NS PCM South | SSD - SE CDF Lot 1 - Invest to Save Programme - Consultant ESE | SSD - SE CDF Lot 1 - Invest to Save Programme - Consultant ESE | New requirement | N/A | Procurement Strategy | 03/11/2020 | 05/08/2020 | 09/11/2020 | 31/03/2021 | £25,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Jessica Morris |
project_30417 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Embankment Road Seawall Refurbishment - Construction | SSD - SE CDF Lot 2 - Embankment Road Seawall Refurbishment - Construction | New requirement | N/A | Procurement Strategy | 03/01/2023 | 05/10/2022 | 03/04/2023 | 31/03/2024 | £10,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Jessica Morris |
project_30418 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Southease to A27 Tidal Embankment - Construction | SSD - SE CDF Lot 2 - Southease to A27 Tidal Embankment - Construction | New requirement | N/A | Procurement Strategy | 03/03/2025 | 03/12/2024 | 01/06/2025 | 01/03/2026 | £10,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Gold | N/A | Jessica Morris |
project_30419 | EA - Operations NS PCM South | SSD - SE CDF Lot 2 - Titchfield Haven Seawall Repairs - Constrcution | SSD - SE CDF Lot 2 - Titchfield Haven Seawall Repairs - Constrcution | New requirement | N/A | Procurement Strategy | 01/12/2024 | 02/09/2024 | 01/03/2025 | 01/03/2026 | £2,000,000 | Direct Award Under Framework | Direct Award Under Framework | U81.10.15.00 | Civil engineering | Silver | N/A | Jessica Morris |
project_30470 | EA - Operations South and East | KSL - PFR - East Peckham PFR | KSL - PFR - East Peckham PFR | New requirement | N/A | Procurement Strategy | 01/02/2021 | 01/02/2021 | 01/02/2021 | 31/12/2021 | £800,000 | Competition Under Framework | Competition Under Framework | U70.17.18.03 | Flood protection or control services | Silver | N/A | Michael Feest |
project_30471 | EA - Operations NS PCM South | THM - TBC - River Thames Scheme Gauging Sites | THM - TBC - River Thames Scheme Gauging Sites | New requirement | N/A | Procurement Strategy | 01/08/2020 | 01/08/2020 | 01/06/2020 | 31/03/2021 | £200,000 | Competition Under Framework | Competition Under Framework | U81.10.15.00 | Civil engineering | Bronze | N/A | Michael Feest |
project_30954 | EA - Operations NS PCM South | KSL - CDF - Hampstead Sluice Initial Assessment & Outline Design | KSL - CDF - Hampstead Sluice Initial Assessment & Outline Design | New requirement | N/A | Procurement Strategy | 29/12/2020 | 30/09/2020 | 19/11/2020 | 31/03/2021 | £50,000 | Direct Award Under Framework | Direct Award Under Framework | TBC | Civil engineering | Silver | N/A | Rebecca Minter |
project_25949 | EA - Operations NS PCM South | ALBANY PARK RIVER RESTORATION | ALBANY PARK RIVER RESTORATION | New requirement | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £250,000 | Partnership Project | Partnership Project | TBC | Civil engineering | Silver | N/A | Patricia Oduguwa |
project_27589 | EA - Operations NS PCM North | Ponteland FAS ESE | Ponteland FAS ESE | New requirement | N/A | Procurement Strategy | 27/11/2019 | 29/08/2019 | TBC | TBC | £0 | Direct Award Under Framework | Direct Award Under Framework | TBC | TBC | TBC | N/A | Dawn Faulkner-Brown |
project_30519 | EA - Operations NS PCM North | Asset Recovery Yorkshire - Design | Asset Recovery Yorkshire - Design | New requirement | N/A | Procurement Strategy | 06/11/2020 | 02/11/2020 | 09/11/2020 | 31/03/2020 | £0 | Direct Award Under Framework | Direct Award Under Framework | TBC | TBC | Bronze | N/A | Tracy White |
project_30530 | EA - Operations NS PCM North | Asset Recovery Yorkshire - Construction | Asset Recovery Yorkshire - Construction | New requirement | N/A | Procurement Strategy | 06/11/2020 | 02/11/2020 | 09/11/2020 | 31/03/2020 | £0 | Direct Award Under Framework | Direct Award Under Framework | TBC | TBC | Bronze | N/A | Tracy White |
project_31170 | EA - Operations NS PCM North | North Ring Drain Bridge | North Ring Drain Bridge | New requirement | N/A | Procurement Strategy | TBC | 26/10/2020 | 30/11/2020 | 31/03/2020 | £0 | Framework | Competition Under Framework | TBC | TBC | Bronze | N/A | Jakki Farrell |
project_28066 | Defra - DDTS | Incident Management Portal Managed Service | Incident Management Portal Managed Service | Re-Procurement Same Scope | N/A | Procurement Strategy | 31/01/2021 | 02/11/2020 | 01/04/2021 | 31/03/2025 | £0 | Direct Award Under Framework | Framework | U81.11.18.14 | Infrastructure as a Service (IaaS) | Silver | N/A | Danielle Woodall |
project_30901 | Defra - DDTS | Storm Direct Award | Storm Direct Award | Re-Procurement Same Scope | N/A | Procurement Strategy | 05/11/2020 | 07/08/2020 | TBC | TBC | £0 | Direct Award Under Framework | Direct Award Under Framework | U81.11.25.00 | Application Software (SaaS) | TBC | N/A | Pamela Kelsall |
project_26390 | TBC | East - Bedford Autumn Winter Package - FOF | East - Bedford Autumn Winter Package - FOF | TBC | N/A | Procurement Strategy | 16/07/2019 | 17/04/2019 | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Chris Cope |
project_29180 | TBC | AP FCERM Technical Advisor Anglian (Great Ouse) | AP FCERM Technical Advisor Anglian (Great Ouse) | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Ruksar Din |
project_29266 | TBC | Cambs Beds PSO FCERM Technical Advisor 2020 | Cambs Beds PSO FCERM Technical Advisor 2020 | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Ruksar Din |
project_30562 | TBC | Pipeline_Harwich Sheet Piles | Pipeline_Harwich Sheet Piles | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Ruksar Din |
project_30563 | TBC | Pipeline_West Clacton to Jaywick | Pipeline_West Clacton to Jaywick | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Ruksar Din |
project_30929 | TBC | Pipeline - HNL - CDF - OXCAM | Pipeline - HNL - CDF - OXCAM | TBC | N/A | Procurement Strategy | 27/12/2020 | 28/09/2020 | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Amy Tenerowicz |
project_30931 | TBC | Pipeline - HNL - CDF - Stanstead and Hardmead | Pipeline - HNL - CDF - Stanstead and Hardmead | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_30932 | TBC | Pipeline - HNL - CDF - Tail Sluice SOC-OBC | Pipeline - HNL - CDF - Tail Sluice SOC-OBC | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_30994 | TBC | Pipeline - HNL - CDF - Tail Sluice OBC-FBC | Pipeline - HNL - CDF - Tail Sluice OBC-FBC | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.30.30.30 | Professional Services - CCL - Unclassified | TBC | N/A | Amy Tenerowicz |
project_30995 | TBC | Pipeline - HNL - CDF - Tail Sluice Construction | Pipeline - HNL - CDF - Tail Sluice Construction | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_30996 | TBC | Pipeline - HNL - CDF - River Roding | Pipeline - HNL - CDF - River Roding | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_30997 | TBC | Pipeline - HNL - CDF - Broadlands Future Initiatives | Pipeline - HNL - CDF - Broadlands Future Initiatives | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_30998 | TBC | Pipeline - HNL - CDF - Alders Brook | Pipeline - HNL - CDF - Alders Brook | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_30999 | TBC | Pipeline - HNL - CDF - Amp 7 Investigations | Pipeline - HNL - CDF - Amp 7 Investigations | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.30.30.30 | Professional Services - CCL - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31000 | TBC | Pipeline - HNL - CDF - Beam Tidal Sluices Refurbishment | Pipeline - HNL - CDF - Beam Tidal Sluices Refurbishment | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31001 | TBC | Pipeline - HNL - CDF - Bedlooker installation | Pipeline - HNL - CDF - Bedlooker installation | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31002 | TBC | Pipeline - HNL - CDF - Bridges Asset Inspection | Pipeline - HNL - CDF - Bridges Asset Inspection | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31003 | TBC | Pipeline - HNL - CDF - Carbon Baselining | Pipeline - HNL - CDF - Carbon Baselining | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.30.30.30 | Professional Services - CCL - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31004 | TBC | Pipeline - HNL - CDF - Chipping Ongar | Pipeline - HNL - CDF - Chipping Ongar | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31005 | TBC | Pipeline - HNL - CDF - Colnbrook - County Ditch & Colne Brook | Pipeline - HNL - CDF - Colnbrook - County Ditch & Colne Brook | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31006 | TBC | Pipeline - HNL - CDF - Com NFM - Bishops Wood | Pipeline - HNL - CDF - Com NFM - Bishops Wood | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31007 | TBC | Pipeline - HNL - CDF - Com NFM - Lower River Crane Improvements | Pipeline - HNL - CDF - Com NFM - Lower River Crane Improvements | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31008 | TBC | Pipeline - HNL - CDF - Com NFM - Pymmes Brook Deculverting | Pipeline - HNL - CDF - Com NFM - Pymmes Brook Deculverting | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31009 | TBC | Pipeline - HNL - CDF - Com NFM – River Pinn Park Wood | Pipeline - HNL - CDF - Com NFM – River Pinn Park Wood | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31010 | TBC | Pipeline - HNL - CDF - Com NFM – Woodland and River Management in two Headwater | Pipeline - HNL - CDF - Com NFM – Woodland and River Management in two Headwater | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31011 | TBC | Pipeline - HNL - CDF - Crane Tidal Gate Replacement | Pipeline - HNL - CDF - Crane Tidal Gate Replacement | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31012 | TBC | Pipeline - HNL - CDF - Croxley Green Sluice Refurbishment | Pipeline - HNL - CDF - Croxley Green Sluice Refurbishment | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31013 | TBC | Pipeline - HNL - CDF - Eel and Fish Pass installation | Pipeline - HNL - CDF - Eel and Fish Pass installation | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31014 | TBC | Pipeline - HNL - CDF - Floating Pennywort Removal | Pipeline - HNL - CDF - Floating Pennywort Removal | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31015 | TBC | Pipeline - HNL - CDF - Gauging Building Rebuild (Bretons Farm) | Pipeline - HNL - CDF - Gauging Building Rebuild (Bretons Farm) | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31019 | TBC | Pipeline - HNL - CDF - Gauging Hut Replacement | Pipeline - HNL - CDF - Gauging Hut Replacement | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31020 | TBC | Pipeline - HNL - CDF - Gaynes Parkway Fish pass | Pipeline - HNL - CDF - Gaynes Parkway Fish pass | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31021 | TBC | Pipeline - HNL - CDF - Grange Paddocks Weir | Pipeline - HNL - CDF - Grange Paddocks Weir | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31022 | TBC | Pipeline - HNL - CDF - Greenford Flood Management Scheme | Pipeline - HNL - CDF - Greenford Flood Management Scheme | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31024 | TBC | Pipeline - HNL - CDF - Gypsy Lane and Marsh Farm Roof Replacements | Pipeline - HNL - CDF - Gypsy Lane and Marsh Farm Roof Replacements | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31025 | TBC | Pipeline - HNL - CDF - Hainault Forest Country Park HLF project | Pipeline - HNL - CDF - Hainault Forest Country Park HLF project | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31026 | TBC | Pipeline - HNL - CDF - Hardmead and Stanstead Radial Gate Replacement | Pipeline - HNL - CDF - Hardmead and Stanstead Radial Gate Replacement | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31027 | TBC | Pipeline - HNL - CDF - Herts and North London Raingauge Upgrade Project (Pluvio) | Pipeline - HNL - CDF - Herts and North London Raingauge Upgrade Project (Pluvio) | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31028 | TBC | Pipeline - HNL - CDF - Hillman Cottages FAS | Pipeline - HNL - CDF - Hillman Cottages FAS | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31029 | TBC | Pipeline - HNL - CDF - HNL Bridges & Culverts repair and maintenance works | Pipeline - HNL - CDF - HNL Bridges & Culverts repair and maintenance works | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31030 | TBC | Pipeline - HNL - CDF - HNL Chalk Stream Restorations | Pipeline - HNL - CDF - HNL Chalk Stream Restorations | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31031 | TBC | Pipeline - HNL - CDF - HNL Extreme Weather Scenarios Development | Pipeline - HNL - CDF - HNL Extreme Weather Scenarios Development | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31032 | TBC | Pipeline - HNL - CDF - HNL SPZ Development | Pipeline - HNL - CDF - HNL SPZ Development | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31033 | TBC | Pipeline - HNL - CDF - Horseshoe Corner - Flap Valve Replacement | Pipeline - HNL - CDF - Horseshoe Corner - Flap Valve Replacement | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31040 | TBC | Pipeline - HNL - CDF - Lee 2100 | Pipeline - HNL - CDF - Lee 2100 | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31041 | TBC | Pipeline - HNL - CDF - Little Hadham A120 Bypass flood storage area | Pipeline - HNL - CDF - Little Hadham A120 Bypass flood storage area | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31042 | TBC | Pipeline - HNL - CDF - London Basin GWModel MF6 & Update | Pipeline - HNL - CDF - London Basin GWModel MF6 & Update | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31043 | TBC | Pipeline - HNL - CDF - Loughton Cable Duct Replacement | Pipeline - HNL - CDF - Loughton Cable Duct Replacement | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31044 | TBC | Pipeline - HNL - CDF - Low Hall - non Stat Res | Pipeline - HNL - CDF - Low Hall - non Stat Res | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31045 | TBC | Pipeline - HNL - CDF - Lower Pinn Flood Alleviation Scheme | Pipeline - HNL - CDF - Lower Pinn Flood Alleviation Scheme | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31046 | TBC | Pipeline - HNL - CDF - Luton Airport Parkway and Vauxhall Way | Pipeline - HNL - CDF - Luton Airport Parkway and Vauxhall Way | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31047 | TBC | Pipeline - HNL - CDF - Luton Town Centre Flood Alleviation Scheme | Pipeline - HNL - CDF - Luton Town Centre Flood Alleviation Scheme | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31048 | TBC | Pipeline - HNL - CDF - Marley Castle and Oval Road Pumping Station Refurbishment | Pipeline - HNL - CDF - Marley Castle and Oval Road Pumping Station Refurbishment | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31049 | TBC | Pipeline - HNL - CDF - MEICA - Beam Pumping Station - Variable Speed Drive | Pipeline - HNL - CDF - MEICA - Beam Pumping Station - Variable Speed Drive | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31050 | TBC | Pipeline - HNL - CDF - MEICA - David Stoker Radial Gate - Solar panel | Pipeline - HNL - CDF - MEICA - David Stoker Radial Gate - Solar panel | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31051 | TBC | Pipeline - HNL - CDF - MEICA - Feildes Weir - Gate & Actuator | Pipeline - HNL - CDF - MEICA - Feildes Weir - Gate & Actuator | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31052 | TBC | Pipeline - HNL - CDF - MEICA - Huntsmoor - Hydraulic ram | Pipeline - HNL - CDF - MEICA - Huntsmoor - Hydraulic ram | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31053 | TBC | Pipeline - HNL - CDF - MEICA - Loxford, Oakentrough and Whitings | Pipeline - HNL - CDF - MEICA - Loxford, Oakentrough and Whitings | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31054 | TBC | Pipeline - HNL - CDF - MEICA - Multiple - Gearbox Intermittent PPMs | Pipeline - HNL - CDF - MEICA - Multiple - Gearbox Intermittent PPMs | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31055 | TBC | Pipeline - HNL - CDF - MEICA - Ware Lock | Pipeline - HNL - CDF - MEICA - Ware Lock | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31056 | TBC | Pipeline - HNL - CDF - MEICA - Wraysbury Offtake | Pipeline - HNL - CDF - MEICA - Wraysbury Offtake | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Amy Tenerowicz |
project_31057 | TBC | Pipeline - HNL - CDF - Mereway Sluice | Pipeline - HNL - CDF - Mereway Sluice | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31058 | TBC | Pipeline - HNL - CDF - Mill Green Wall | Pipeline - HNL - CDF - Mill Green Wall | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31059 | TBC | Pipeline - HNL - CDF - Moor Lane, Spelthorne | Pipeline - HNL - CDF - Moor Lane, Spelthorne | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31060 | TBC | Pipeline - HNL - CDF - Natural Flood Management in the River Lee Tributaries | Pipeline - HNL - CDF - Natural Flood Management in the River Lee Tributaries | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31061 | TBC | Pipeline - HNL - CDF - Pinner and Hatch End Flood Alleviation Scheme | Pipeline - HNL - CDF - Pinner and Hatch End Flood Alleviation Scheme | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31062 | TBC | Pipeline - HNL - CDF - Rammey Sluice, Waltham Abbey | Pipeline - HNL - CDF - Rammey Sluice, Waltham Abbey | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31063 | TBC | Pipeline - HNL - CDF - Recovery Dec 19 - Frog Island Tidal Sluice | Pipeline - HNL - CDF - Recovery Dec 19 - Frog Island Tidal Sluice | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31064 | TBC | Pipeline - HNL - CDF - Replacement of Ultrasonic Flow Stations (RUFS) | Pipeline - HNL - CDF - Replacement of Ultrasonic Flow Stations (RUFS) | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31065 | TBC | Pipeline - HNL - CDF - Resilient and Adaptive community Pathfinder project | Pipeline - HNL - CDF - Resilient and Adaptive community Pathfinder project | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31070 | TBC | Pipeline - HNL - CDF - River Gade Restoration, Gadebridge Park | Pipeline - HNL - CDF - River Gade Restoration, Gadebridge Park | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31071 | TBC | Pipeline - HNL - CDF - River Lee Climate Change | Pipeline - HNL - CDF - River Lee Climate Change | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Amy Tenerowicz |
project_31072 | TBC | Pipeline - HNL - CDF - River Ver Restoration, St Albans, Park Reaches | Pipeline - HNL - CDF - River Ver Restoration, St Albans, Park Reaches | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31073 | TBC | Pipeline - HNL - CDF - Silk Stream, Colindale Flood Alleviation Scheme | Pipeline - HNL - CDF - Silk Stream, Colindale Flood Alleviation Scheme | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31074 | TBC | Pipeline - HNL - CSF - Ruislip Park Wood and Pinn Meadows | Pipeline - HNL - CSF - Ruislip Park Wood and Pinn Meadows | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31075 | TBC | Pipeline - HNL - CDF - Salmons Brook Flood Alleviation Scheme | Pipeline - HNL - CDF - Salmons Brook Flood Alleviation Scheme | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31076 | TBC | Pipeline - HNL - CDF - Spatial Planning tool | Pipeline - HNL - CDF - Spatial Planning tool | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.30.30.30 | Professional Services - CCL - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31077 | TBC | Pipeline - HNL - CDF - Telemetry Outstation Replacement Programme | Pipeline - HNL - CDF - Telemetry Outstation Replacement Programme | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31078 | TBC | Pipeline - HNL - CDF - The River Roding Project | Pipeline - HNL - CDF - The River Roding Project | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31079 | TBC | Pipeline - HNL - CDF - Tumbling Bay Trash boom access bridge | Pipeline - HNL - CDF - Tumbling Bay Trash boom access bridge | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31080 | TBC | Pipeline - HNL - CDF - Ultrasonic Gauging Station Weed and Debris Clearance | Pipeline - HNL - CDF - Ultrasonic Gauging Station Weed and Debris Clearance | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Amy Tenerowicz |
project_31082 | TBC | Pipeline - HNL - CDF - Victoria Cut Footbridge | Pipeline - HNL - CDF - Victoria Cut Footbridge | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31083 | TBC | Pipeline - HNL - CDF - GTYEPoch 3 | Pipeline - HNL - CDF - GTYEPoch 3 | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31085 | TBC | Pipeline - HNL - CDF - Wixoe | Pipeline - HNL - CDF - Wixoe | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.30.30.30 | Professional Services - CCL - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31086 | TBC | Pipeline - HNL - CDF - Fish and Eel Pass Project | Pipeline - HNL - CDF - Fish and Eel Pass Project | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.30.30.30 | Professional Services - CCL - Unclassified | TBC | N/A | Amy Tenerowicz |
project_31087 | TBC | Pipeline - HNL - CDF - BFI | Pipeline - HNL - CDF - BFI | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | U99.16.16.16 | ## Construction - Unclassified | TBC | N/A | Amy Tenerowicz |
ecm_44090 | Defra - Human Resources | Learning contract for Defra and some ALBs | Civil Service Learning (CSL) | Renew | 31/12/2020 | Procurement Strategy | 06/03/2020 | 06/01/2020 | 01/01/2021 | 02/11/2025 | £0 | Open OJEU | Open OJEU | U99.24.11.11 | Learning - Unclassified | Silver | KPMG LLP | Erica Collins |
project_30783 | TBC | Defra Tree Health Strategy Analysis | Defra Tree Health Strategy Analysis | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Sahdia Afzal |
project_30784 | TBC | Environment Agency Signage Contract | Environment Agency Signage Contract | TBC | N/A | Procurement Strategy | TBC | TBC | TBC | TBC | £0 | TBC | TBC | TBC | TBC | TBC | N/A | Sahdia Afzal |
ecm_16979 | Defra - Animal H&W: Disease Control | Diagnostic skin testing with Tuberculin Purified Protein Derivative (PPD) is a critical part of Defra’s TB surveillance and monitoring programme. Skin testing plays a crucial role in identifying TB infected herds and individual cattle, and thus helping to control and reduce further spread of the disease. The product supports Defra’s ‘Strategy for achieving Officially Bovine Tuberculosis Free status for England’ Strategy for Bovine TB-free status. Defra, on behalf of the UK government and its devolved administrations, needs to maintain a supply of Bovine and Avian Tuberculin’s PPD and contracted the management, storage and distribution of the product to APHA who also carry out the TB testing, alongside private Veterinarians. | Provision of the Manufacture and Supply of Avian and Bovine Tuberculin | Renew | 31/12/2021 | Procurement Strategy | 05/04/2021 | 05/01/2021 | 01/01/2022 | 07/05/2029 | £18,271,881 | Open OJEU | Open OJEU | U51.20.16.00 | Vaccines and antigens and toxoids | Gold | Prionics AG | APHA Contracts |
project_24989 | APHA – Operations | Veterinary Delivery Partnership - Livestock testing in England & Wales | Veterinary Delivery Partnership - Livestock testing in England & Wales | Re-Procurement Same Scope | N/A | Procurement Strategy | 28/01/2019 | 30/10/2018 | 01/09/2021 | 31/08/2024 | £81,000,000 | Open OJEU | Open OJEU | U85.11.00.00 | Disease prevention and control | Gold | N/A | Simon Desborough |
project_28377 | Defra - Commercial | Lab Initiatives - Chemicals and Consumables | Lab Initiatives - Chemicals and Consumables | Re-Procurement Different Scope | N/A | Procurement Strategy | 05/03/2020 | 06/12/2019 | 30/06/2021 | TBC | £16,000,000 | Open OJEU | Open OJEU | U41.10.00.00 | Laboratory & Scientific Consumables & Equipment | Gold | N/A | Marie Bruce |
project_28735 | APHA – Science | Project 28735 - Manufacture and Supply of Avian and Bovine Tuberculin | Project 28735 - Manufacture and Supply of Avian and Bovine Tuberculin | Re-Procurement Same Scope | N/A | Procurement Strategy | 05/04/2020 | 06/01/2020 | 09/08/2021 | 08/08/2026 | £15,500,000 | Open OJEU | Open OJEU | U51.20.16.00 | Vaccines and antigens and toxoids | Gold | N/A | Melanie Swain |
project_26968 | EA - Operations NS PCM West | Infrastructure Pipeline SW CDF Bridgwater Tidal Barrier construction | Infrastructure Pipeline SW CDF Bridgwater Tidal Barrier construction | New requirement | £70,000,000 | Procurement Strategy | 21/08/2019 | 01/02/2022 | 01/02/2023 | 12/12/2025 | £70,000,000 | Competition Under Framework | Competition Under Framework | U81.10.15.00 | Civil engineering | TBC | N/A | Kerrie Pitson |
project_30299 | EA - Operations National Services E&B | NAT - MEICA - Operational Framework | NAT - MEICA - Operational Framework | Re-Procurement Different Scope | £80,000,000 | Procurement Strategy | 11/10/2020 | 13/07/2020 | 01/04/2021 | 31/03/2025 | £80,000,000 | Competitive with Negotiation | Competitive with Negotiation | U32.15.00.00 | ## Automation control devices and components and accessories | Gold | N/A | Adam Wdowik |
project_31235 | EA- Operations PCM South West | Pipeline - WSX - CDF - Bristol Frome Refurbishment | Pipeline - WSX - CDF - Bristol Frome Refurbishment | New requirement | £15,250,000 | Procurement Strategy | 01/04/2021 | 01/04/2022 | 01/04/2022 | 01/03/2027 | £15,250,000 | Competition Under Framework | Competition Under Framework | U81.10.15.00 | Civil engineering | TBC | N/A | Luke Tobitt |
project_31208 | EA- Operations PCM South West | Pipeline - WSX - CDF - Arne Moor construction | Pipeline - WSX - CDF - Arne Moor construction | New requirement | £12,000,000 | Procurement Strategy | 01/01/2021 | 01/04/2021 | 01/04/2021 | 01/09/2024 | £12,000,000 | Competition Under Framework | Competition Under Framework | U81.10.15.00 | Civil engineering | TBC | N/A | Luke Tobitt |
project_31237 | EA- Operations PCM South West | Pipeline - WSX - CDF - Salisbury river corridor improvements | Pipeline - WSX - CDF - Salisbury river corridor improvements | new requirement | £12,000,000 | Procurement Strategy | 01/06/2020 | 01/06/2021 | 01/01/2022 | 01/03/2023 | £12,000,000 | Competition Under Framework | Competition Under Framework | U81.10.15.00 | Civil engineering | TBC | N/A | Luke Tobitt |
ecm_18084 | Defra - Resource Atmosphere and Susta | In line with templates released August 2014 | Central Management and Control Unit (CMCU) for the AURN | Renew | £16,510,592 | Procurement Strategy | 04/12/2020 | 05/10/2020 | 01/10/2021 | 01/04/2028 | £16,510,592 | Open OJEU | Open OJEU | U77.12.15.04 | Air pollution monitoring or measurement services | Silver | Bureau Veritas UK Limited | Michelle Hingston |
project_30120 | Defra | Research Development and Evidence Framework | Research Development and Evidence Framework | New requirement | £60,000,000 | Procurement Strategy | 06/09/2020 | 08/07/2020 | 01/04/2021 | 31/03/2025 | £60,000,000 | Competitive with Negotiation | Competitive with Negotiation | U99.13.12.12 | Science and Environmental Research - Unclassified | Silver | N/A | Felicity Jowett |
ecm_53977 | EA - Operations National Services E&B | Laboratory Chemicals and Consumables | Laboratory Chemicals & Consumables Framework | Renew | £10,000,000 | Procurement Strategy | 07/12/2019 | 07/11/2019 | 01/05/2021 | 30/04/2021 | £10,000,000 | Competitive with Negotiation | Competitive with Negotiation | U41.10.00.00 | Laboratory & Scientific Consumables & Equipment | Silver | VWR International Ltd | Marie Bruce |
project_25952 | EA - Operations National Services E&B | Automatic Urban and Rural Air Quality Monitoring Network - CMCU & QAQC | Automatic Urban and Rural Air Quality Monitoring Network - CMCU & QAQC | Re-Procurement Different Scope | £25,000,000 | Procurement Strategy | 03/11/2019 | 05/08/2019 | 01/04/2021 | 31/03/2026 | £25,000,000 | Competitive with Negotiation | Competitive with Negotiation | U77.12.15.01 | ## Air quality management | Gold | N/A | Michelle Hingston |
project_30976 | Defra - Resource Atmosphere and Susta | Research Project to Develop Emissions Factors for Domestic Combustion | Research Project to Develop Emissions Factors for Domestic Combustion | New requirement | £0 | Procurement Strategy | 14/02/2021 | 16/11/2020 | 18/01/2021 | 31/12/2022 | £0 | Open OJEU | Open Ojeu | U99.13.12.12 | Science and Environmental Research - Unclassified | Silver | N/A | Penny Hebden |