National Infrastructure and Construction Procurement Pipeline 2020/21 (csv)
Updated 16 June 2020
Download CSV 139 KB
Sector | Sub-Sector | Sub-Group | Key Client | Project / Programme Name | Project or Programme | Project Summary | Project ONS Region | Project Status | Work Type | Procurement Name | Procurement Description | Procurement Route | Procurement ONS Region | Estimated Publication Date | Estimated Contract Award Date* | Estimated Contract Value (œ)** | Data source (including web address) | Public Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Transport | Roads | Traffic | Highways England | A428 Black Cat to Caxton Gibbet | Project | Converting the the clogged A428 in Cambridgeshire into a dual carriageway. The construction work to transform the single-carriageway A428 from the Black Cat roundabout to Caxton Gibbet | East of England | Planning and Consents | Construction work | Main works | Construction | Open Tender | East of England | Q1 2020/21 | Q1 2021/22 | 1,600,000,000 | https://www.ardent-management.com/preferred-route-announcement-a428-black-cat-to-caxton-gibbet/ | The long awaited PRA unlocks the next phases of work including the full Land Referencing process to inform the S44 consultation list and further detailed landowner engagement. The Milton Keynes office are driving the bulk of the work on this project and are ideally located for easy access to the project. The DCO application is expected to be submitted in early 2020 with formal consultation taking place in summer 2019. |
Transport | Roads | Standards | DVSA | Future Theory Test Services | Project | DVSA Future Theory Test Service, this contract is for the Test Centre Network (TCN). | UK | Active Programme | Architectural, construction, engineering and inspection services | The project is a procurement to replace an existing service, however the new service is structured in a different way from the existing contract | The test centre network is split in to three lots by geographic region. | Competitive Dialogue (OJEU) | UK | Q1 2020/21 | Q4 2020/21 | 128,000,000 | https://www.delta-esourcing.com/tenders/UK-UK-Nottingham:-Driving-test-services./XV4V26477Q | DVSA procuring the service on behalf of the Secretary of State for Transport |
Transport | Roads | Traffic | Highways England | A66 Scotch Corner | Project | The A66 Northern Trans-Pennine Project will address the lack of east / west connectivity across the Pennines in the north of England connecting Cumbria, County Durham and North Yorkshire, and fully dualling the A66 between the M6 junction 40 and the A1(M) at Scotch Corner. The overall project is œ1.2 Billion but for 20/21 the only procurement and contract award will be for the Design Partner | North East | Active Programme | Architectural, construction, engineering and inspection services | Four discreet construction packages | Design & Build | Open Tender (OJEU) | North East | Q1 2020/21 | Q4 2020/21 | 60,000,000 | https://highwaysengland.co.uk/projects/a66-northern-trans-pennine/ | Public consultation, DCO and preferrefd route announcements |
Transport | Roads | Traffic | Highways England | A12 Chelmsford to A120 Widening | Project | A new wider A12 carriageway between junction 19 and junction 22; new 3 lane bypass from junction 22, to the south, running in parallel with the existing A12 re-joining at junction 23 and a second 3 lane bypass from junction 24, to the south, running in parallel with the existing A12 re-joining at junction 25 | East of England | Active Programme | Construction work | Main Works Construction Contractor to support DCO development | Design Build and Maintenance | Other | East of England | Q1 2020/21 | Q3 2020/21 | 110,000,000 | https://highwaysengland.co.uk/projects/a12-chelmsford-to-a120-widening-scheme/ | 2020 ground investigations and surveys |
Transport | Roads | Traffic and tunnel | Highways England | A303 Amesbury to Berwick Down | Project | Stonehenge Road and Tunnel to alleviate A303 congestion | South West | Active Programme | Architectural, construction, engineering and inspection services | Main Works Construction | Design and build | Competitive Dialogue (OJEU) | South West | Q1 2020/21 | Q1 2021/22 | 2,800,000,000 | https://www.theconstructionindex.co.uk/news/view/bidding-opens-for-12bn-stonehenge-tunnel-contract | The main construction contract for the A303 Amesbury to Berwick Down scheme includes eight miles of new dual carriageway and a tunnel at least two miles long underneath the Stonehenge World Heritage Site in Wiltshire. |
Transport | Roads | Tunnels | Highways England | Lower Thames Crossing | Project | A bored tunnel with 3 lines each side and Three lanes in both directions and improvements to M25, A2 and A13 . Overall project rane is œ 4 to œ 7 Million for three main packages. This entry is for the Delivery Partner only for 20/21. | South East | Planning and Consents | Construction work | 3 Main packages plus enabling works and delivery partner | Delivery Partner | Open Tender (OJEU) | South East | Q2 2020/21 | Q4 2020/21 | 250,000,000 | https://highwaysengland.co.uk/lower-thames-crossing-supply-chain/ | Public Consultation ongoing for the 3 main packages through DCO |
Transport | Roads | Road charging | Highways England | Free Flow Charging Dart Charge | Project | Around 50 million chargeable Dartford crossings are made each year. The existing free-flow charging service is currently outsourced to a single provider. The service will be disaggregated and will eventually encompass charging for Lower Thames Crossing | South East | Active Programme | Construction work | 3 Packages | a) Road User Charging Services b) UK Enforcement Services c) Non UK Enforcement Services hub | Competitive Dialogue (OJEU) | South East | Q1 2020/21 | Q4 2021/22 | 300,000,000 | http://bidstats.uk/tenders/2019/W21/703332416 | Disaggregation of the current single service provider. The service will eventually incorporate the Lower Thames Crossing |
Transport | Roads | Traffic | Highways England | Smart Motorways | Programme | The Smart Motorways Programme will develop an Alliance that will increase lane capacity on all parts of the strategic road network through embedding technology and converting hard shoulders to all-lane running. Where required, the Alliance will also deliver associated works to coordinate wider HE programme of works. The Alliance may also support HE deliver the wider autonomous and connected vehicles road implementation strategy.' | England | Active Programme | Architectural, construction, engineering and inspection services | Smart Motorways Alliance | Six Partners in the Alliance in addition to Higways England: Two Digitally-Enabled Design Partners, one Production Management Partner, and three On-Site Assembly Partners. They will be procured in three lots on a ?best in class? basis and then formed into the Alliance. | Competitive Dialogue (OJEU) | England | Q1 2020/21 | Q4 2020/21 | 7,000,000,000 | https://www.highwaysmagazine.co.uk/Highways-England-releases-7bn-smart-motorways-tender-/4577 | The Smart Motorways delivery model will be responsible for delivering schemes within the ongoing Road Investment Strategy, and subsequent ones that are developed, until 2030. Road Investment Strategies, developed by Highways England and the Government set investment for the Strategic Road Network, and take into account its potential future needs. Highways England objectives and wider Government objectives and priorities play a further role in shaping it. The new delivery model will therefore have built in the objectives and wider vision of both Highways England and the Government |
Transport | High Speed Rail | Rolling Stock | HS2 | HS2 | Project | Rolling Stock for HS2 | England | Active Programme | Repair and maintenance services | HS2 Rolling Stock | Supply, Assembly and Maintenance | Negotiated Tender (OJEU) | England | Q1 2020/21 | Q3 2021/22 | 3,000,000,000 | hs2.org | HS2 Consultation |
Transport | High Speed Rail | Cross Passage Doors | HS2 | HS2 | Project | HS2 Cross Passge Doors | England | Active Programme | Construction work | HS2 Cross Passage Doors | Constructio supply and asssembly | Restricted Tender (OJEU) | England | Q1 2020/21 | Q3 2020/21 | 50,000,000 | hs2.org | HS2 Consultation |
Transport | High Speed Rail | Commercial Delivery and Controls Framework | HS2 | HS2 | Project | Framework for Commercial Delivery and Controls Framework | England | Active Programme | Research and development services and related consultancy services | Commercial Delivery & Controls | Framework | Open Tender (OJEU) | England | Q1 2020/21 | Q3 2020/21 | 250,000,000 | https://www.hs2.org.uk/contract-opportunities/ | HS2 Consultation |
Transport | High Speed Rail | Station construction | HS2 | HS2 | Project | Design and build for Central Birmingham HS2 Station | West Midlands | Active Programme | Architectural, construction, engineering and inspection services | Curzon Street Design and Construction | Design and build | Competitive Dialogue (OJEU) | West Midlands | 2020/21 | Q2 2021/22 | 500,000,000 | https://www.hs2.org.uk/contract-opportunities/ | HS2 Consultation |
Transport | Rail | Railway Signalling | Network Rail | East Coast Digital a multi billion programme. This entry relates to the train control partner procurement for œ 350 Million as part of the south section from London to the north side of Peterborugh | Programme | The first intercity digital railway in the country, the ECDP will involve fitting trains with the latest in-cab signalling technology in addition to removal of the old lineside signals. The project will enable signallers to continuously talk to trains rather than only at fixed points, apart from allowing them to instruct and respond in real time, thereby decreasing the lengths of delays and significantly boosting performance | England | Active Programme | Research and development services and related consultancy services | East Coast Digital/Train Control Partner | Design | Competitive Dialogue (OJEU) | England | Q1 2020/21 | Q1 2020/21 | 350,000,000 | https://www.bing.com/search?q=network+rail+contract+pipeline&src=IE-SearchBox&FORM=IESR4A | Project Advice Notices |
Transport | Rail | Civils | Network Rail | Civils Examination Framework Agreement (CEFA) | Project | Infrastructure Framework for Civils Examination | England | Active Programme | Construction work | Infrastructure Framework | Framework | Competitive Dialogue (OJEU) | England | Q1 2020/21 | Q3 2020/21 | 250,000,000 | https://www.bing.com/search?q=network+rail+contract+pipeline&src=IE-SearchBox&FORM=IESR4A | NR Upgrades Programme |
Transport | Roads | Asset delivery management | Highways England | Scheme Delivery Framework (SDF) | Project | Highways England in procuring capital renewals works | England | Active Programme | Construction work | Capital Renewal Works | Framework | Restricted Tender (OJEU) | England | Q1 2020/21 | Q3 2021/22 | 2,800,000,000 | https://www.gov.uk/government/organisations/highways-england/about/procurement | National Framework |
Transport | Roads | Complex Infrastructure | Highways England | Manchester North West Quadrant Technical Partner | Project | Manchester Northwest Quadrant ? Technical Partner | North West | Active Programme | Construction work | Technical Partner | Technical Partner services | Restricted Tender (OJEU) | North West | Q2 2020/21 | Q4 2020/21 | 150,000,000 | https://highwaysengland.co.uk/projects/manchester-north-west-quadrant/ | The MNWQ strategic study investigated a number of solutions for road, rail and bus to relieve pressure on the M60 between junctions 8 and 18. This is to ensure the area?s economic growth potential is not constrained and that sufficient transport capacity is provided. For more information, please visit Road Investment Strategy: post 2020 ? Manchester North West Quadrant. |
Transport | Roads | Vehicle Fleet | Highways England | Winter Fleet Repalcement | Project | Replacement of Highways England Winter Fleet | England | Active Programme | Repair and maintenance services | Winter Fleet | Supplies | Open Tender (OJEU) | England | Q1 2020/21 | Q4 2020/21 | 60,000,000 | https://www.gov.uk/government/organisations/highways-england/about/procurement | Contract Notice |
Transport | Roads | Archaeology | Highways England | Archaeology Framework | Project | Specialist National Framework for Archaelology expertise | England | Active Programme | Architectural, construction, engineering and inspection services | Archaeology Framework | Framework | Open Tender (OJEU) | England | 2020/21 | Q2 2020/21 | 200,000,000 | https://www.gov.uk/government/organisations/highways-england/about/procurement | Contract Notice |
Transport | Roads | Historical Railways Estate 2020 | Highways England | Historical Railways Estate 2020 Services | Project | Management of Railways Estate for Highways England | England | Various | Repair and maintenance services | Services | Railways Estate Management | Open Tender (OJEU) | England | 2020/21 | Q3 2020/21 | 40,000,000 | https://www.gov.uk/government/organisations/highways-england/about/procurement | Contract Notice |
Energy | Nuclear Decommissioning | Nuclear Decommissioning Authority | Dounreay Site Restoration Ltd | 500L Drum Handling/Export System | Project | 500L Drum Handling/Export System | Scotland | Planning and Consents | Construction work | 500L Drum Handling/Export System | 500L Drum Handling/Export System | Other | Scotland | Q1 2020/21 | Q3 2020/21 | 6,000,000 | Not set | Not set |
Energy | Nuclear Decommissioning | Nuclear Decommissioning Authority | Dounreay Site Restoration Ltd | Waste Treatment Plant - Design & Build | Project | Waste Treatment Plant - Design & Build | Scotland | Scoping | Construction work | Waste Treatment Plant - Design & Build | Waste Treatment Plant - Design & Build | Other | Scotland | Q3 2020/21 | Q1 2021/22 | 7,500,000 | Not set | Not set |
Energy | Nuclear Decommissioning | Nuclear Decommissioning Authority | Radioactive Waste Management | Site Evaluation Support (project 2) | Project | Site Evaluation Services to determine siting factors that could influence the construction of a GDF | England and Wales | Scoping | Research and development services and related consultancy services | RWM Site Evaluation Services | Site evaluation services volunteering communities that may be open to housing the GDF. Framework Agreement covering several siting factors to be assessed to determine suitability. | Restricted Tender (OJEU) | England and Wales | Q3 2020/21 | Q1 2021/22 | 25,000,000 | Not set | Pin Notice Issued - Reference: 2020/S 060-144755 |
Energy | Nuclear Decommissioning | Nuclear Decommissioning Authority | Radioactive Waste Management | Permitting & Consents III | Project | Permitting and consents to support site evaluation and site characterisation services for the design and construction of the GDF programme | England and Wales | Scoping | Research and development services and related consultancy services | Permitting and Consents III | Framework Agreement to support RWM obtain the necessary permits and consents for site evaluation and site characterisation for the GDF Programme | Restricted Tender (OJEU) | England and Wales | Q4 2020/21 | Q3 2020/21 | 25,000,000 | Not set | N/A |
Energy | Nuclear Decommissioning | Nuclear Decommissioning Authority | Sellafield | CLC TH-A+ Superstructure Demolition and Remediation Main Contract - Phase 1 | Project | Remediation and demolition of one of the Calder Hall Turbine Halls. Phase 1 to complete early surveys and allow Contractor to valid price and programme | North West | In Construction | Construction work | CLC TH-A+ Superstructure Demolition and Remediation Main Contract - Phase 1 | Phase 1 is the study and survey work for the remediation solution for CLC (Calder Land Clearance) | Other | North West | 2020/21 | Q2 2020/21 | 10,000,000 | Not set | Not set |
Energy | Nuclear Decommissioning | Nuclear Decommissioning Authority | Sellafield | CLC TH-A+ Superstructure Demolition and Remediation Main Contract - Phase 2 | Project | Remediation and demolition of one of the Calder Hall Turbine Halls. Phase is the main works package | North West | Planning and Consents | Construction work | CLC TH-A+ Superstructure Demolition and Remediation Main Contract - Phase 2 | Phase 2 is the remediation and demolition for CLC (Calder Land Clearance) | Other | North West | Q4 2020/21 | Q4 2020/21 | 50,000,000 | Not set | Not set |
Energy | Nuclear Decommissioning | Nuclear Decommissioning Authority | Sellafield | CNC Accommodation | Project | Construction of a new facility for the Civil Nuclear Constabulary on the Sellafield site. | North West | Consents Approved | Construction work | CNC Accommodation | The design and build of the new Civil Nuclear Constabulary's (CNC) facility on Sellafield site. The facility will include but not be limited to office space, changing facilities, equipment storage, training rooms, kennels and garages. Formally known as CNC Accommodation | Other | North West | 2020/21 | Q2 2020/21 | 50,000,000 | Not set | Not set |
Science and Research | Research | N/A | N/A | Spaceflight Programme - Vertical Spaceport build | Project | Infrastructure build for a vertical spaceport build we are providing funding for under a grant funding agreement. | Scotland | Planning and Consents | Construction work | Sutherland Vertical Spaceport Build | Construction of a vertical spaceport in Sutherland to establish UK Launch capability | Other | Scotland | 2020/21 | 2020/21 | 2,250,000 | Not set | The Funding mechanism is a grand award, providing a 15% contribution to the total project costs. GFA signed in 2018. |
Flood Defence | Flood (Coal Authority) | Environment | Dept BEIS | Subsidence Pumping Stations - Build & Refurbishment Programme (9# Projects) | Programme | Flood Risk Management | Yorkshire and the Humber | Active Programme | Construction work | N/A | The Subsidence Pumping Station refurbishment programme is ran in conjunction with external bodies (e.g. EA, land-owners and IDB's (Internal Drainage Boards) and so there are numerous methods of procurement depending who is responsible for placing the contract award | Restricted Tender (OJEU) | Yorkshire and the Humber | 2020/21 | 2020/21 | 1,237,691 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Science and Research | Research | Fusion Research | UKAEA | National Fusion Technology Platform | Project | erection of research facility and offices | South East | In Construction | Construction work | Design and Construction of NFTP Building | DIO frame work | Open Tender | South East | Q1 2020/21 | Q1 2020/21 | 9,000,000 | Not set | Not set |
Energy | Electricity Generation | Offshore Wind | N/A | STDC - Offshore Energy Infrastructure | Project | This proposal will see the development of a key National Strategic Infrastructure asset for offshore wind to be located on the South Bank Quay of the STDC site. This will be a world class, market leading development consisting with the construction of 1km of new quays, dredging the Tees to facilitate both the current and planned installation vessel fleet, creating an "operational area" and UK manufacturing base. The UK has a target to develop 50Gw of Offshore Power by 2050 delivering between 2 - 4 Gw per annum. Of this the UK has a target to provide 60% local content but is falling significantly short of this target. By providing a world class - Nationally Strategic Asset, the developers will have to utilise the UK and encourage manaufacturers into the market. The UK has the largest Offshore Wind market and by developing the capability and capacity this facility will be able to support both local and international markets. The proposal will generate up to 1,000 jobs in the construction phase of the development, up to 1,000 direct jobs and c4 times this in the supply chain. | North East | Planning and Consents | Architectural, construction, engineering and inspection services | STDC Offshore Wind | Construction Services/Design and Build | Other | North East | Q4 2020/21 | Q2 2021/22 | 214,000,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Education | Higher Education | Research and Development | CPCA | University of Peterborough Phase 3 | Project | The Phase 3 Project - comprises two further teaching focussed buildings, to be built 2021 to 2025, leading to capacity for 10,000 pa graduates. Procurement is currently estimated for Q3 2022 but subject to increased availability of funding could be accelerated by a year. An initial economic appraisal of the phase 3 project shows that the key benefits to be delivered by the project include: ? œ1.8 billion in Net Present Benefits ? œ60 million in Net Present Costs ? œ1.7 billion in Net Present Value ? Benefit Cost Ratio of 29 | East of England | Planning and Consents | Construction work | Going to Tender | JCT contract 2 stage design and build | Negotiated Tender | East of England | Q4 2020/21 | Q3 2020/21 | 100,000,000 | Not set | Not set |
Science and Research | Research | Fusion Research | UKAEA | Carpark | Project | new multi level carpark | South East | In Construction | Construction work | Design and Build NFTP Multi-storey car park | open tender | Open Tender | South East | Q1 2020/21 | Q1 2020/21 | 4,000,000 | Not set | Not set |
Science and Research | Research | Fusion Research | UKAEA | Re-roofing J1 Roof | Project | Re roofing building | South East | In Construction | Construction work | J1 Roof | open tender | Open Tender | South East | Q2 2020/21 | Q2 2020/21 | 1,500,000 | Not set | Not set |
Science and Research | Research | Fusion Research | UKAEA | J1 Heating upgrade works | Project | Heating upgrade works | South East | In Construction | Construction work | D3 Biulding/Heating | open tender | Open Tender | South East | Q3 2020/21 | Q3 2020/21 | 1,700,000 | Not set | Not set |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - Scotland (5# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | Scotland | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | Scotland | 2020/21 | 2020/21 | 5,394,452 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - Northumbria (2# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | North East | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | North East | 2020/21 | 2020/21 | 170,077 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - Durham (4# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | North East | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | North East | 2020/21 | 2020/21 | 361,438 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - Lancashire (1# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | North West | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | North West | 2020/21 | 2020/21 | 150,000 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - Yorkshire (1# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | Yorkshire and the Humber | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | Yorkshire and the Humber | 2020/21 | 2020/21 | 205,000 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - East Midlands (2# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | East Midlands | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | East Midlands | 2020/21 | 2020/21 | 82,228 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - West Midlands (1# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | West Midlands | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | West Midlands | 2020/21 | 2020/21 | 75,000 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - New Scheme Build (including construction, consultancy, power supply and land if appropriate) - Wales (3# Projects) | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | Wales | Active Programme | Construction work | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | Wales | 2020/21 | 2020/21 | 345,493 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - Capital Maintenance & Refurbishment Programme - UK | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | UK | Active Programme | Repair and maintenance services | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | UK | 2020/21 | 2020/21 | 6,467,343 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Waste | Water and Sewerage (Coal Authority) | Environment | Dept BEIS | Mine Water Treatment Schemes - Innovation Programme - UK | Programme | EU Water Framework Directive - Water Quality and Potable Water Supply and Flood Risk Management | UK | Active Programme | Research and development services and related consultancy services | N/A | TCA Confluence Framework Contract is in two parts; Design and Construct Contract which ceases 31/05/2024 and Management, Operations and Maintenance Contract which ceases 31/12/2024 | Restricted Tender (OJEU) | UK | 2020/21 | 2020/21 | 597,103 | Coal Authority Corporate Plan and Annual Report & Accounts https://www.gov.uk/government/organisations | Public source for further project details; http://coal.decc.gov.uk/en/coal/cms/publications/annual_report/annual_report.aspx, or procurement@coal.gov.uk |
Housing and Regeneration | Homes England | Build to Rent | Multiple | Build to Rent | Programme | Built to Rent properties are new build apartment blocks that have been built specifically for renters | England | Various | Construction work | Build to Rent | Built to Rent properties are new build apartment blocks that have been built specifically for renters | Multiple | Multiple | 2020/21 | 2020/21 | 89,408,000 | Not set | Not set |
Housing and Regeneration | Homes England | Estate Regeneration | Multiple | Estate Regeneration | Programme | Acceleration and improvement of estate regeneration schemes | England | Various | Construction work | Estate Regeneration | Acceleration and improvement of estate regeneration schemes | Multiple | England | 2020/21 | 2020/21 | 19,568,000 | Not set | Not set |
Housing and Regeneration | Homes England | Long Term Fund | Multiple | Long Term Fund | Programme | Long Term Fund | England | Various | Construction work | Long Term Fund | Long Term Fund | Multiple | England | 2020/21 | 2020/21 | 293,316,000 | Not set | Not set |
Housing and Regeneration | Homes England | Short Term Fund | Multiple | Short Term Fund | Programme | Short Term Fund | England | Various | Construction work | Short Term Fund | Short Term Fund | Multiple | England | 2020/21 | 2020/21 | 425,857,000 | Not set | Not set |
Housing and Regeneration | Homes England | Housing Infrastructure Fund | Multiple | Housing Infrastructure Fund | Programme | Awards to LAs to provide grant funding for new infrastructure | England | Various | Construction work | Housing Infrastructure Fund | Awards to LAs to provide grant funding for new infrastructure | Multiple | England | 2020/21 | 2020/21 | 448,399,000 | Not set | Not set |
Housing and Regeneration | Homes England | Accelerated Construction | Multiple | Accelerated Construction | Programme | Tailored packages of support for LAs to develop out surplus land holdings at pace | England | Various | Construction work | Accelerated Construction | Tailored packages of support for LAs to develop out surplus land holdings at pace | Multiple | England | 2020/21 | 2020/21 | 123,000,000 | Not set | Not set |
Housing and Regeneration | Homes England | Affordable Home Programme | Multiple | Affordable Home Programme | Programme | The programme aims to increase the supply of Shared Ownership and other affordable homes in England | England | Various | Construction work | Affordable Home Programme | The programme aims to increase the supply of Shared Ownership and other affordable homes in England | Multiple | England | 2020/21 | 2020/21 | 123,000,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | Refurbishment / Remodel | London | Scoping | Construction work | Abacus Belsize | Competition | Restricted Tender | London | Q4 2020/21 | Q4 2021/22 | 8,856,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | West Midlands | Scoping | Construction work | BOA Digital | Competition | Restricted Tender | West Midlands | Q1 2020/21 | Q2 2021/22 | 21,768,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | Refurbishment / Remodel | West Midlands | Scoping | Construction work | BOA Stage and Screen Production | Competition | Restricted Tender | West Midlands | Q3 2020/21 | Q3 2021/22 | 6,744,000 | Not set | Not set |
Education | Schools | N/A | AA Projects | LA - Programme | Programme | New build | South East | Scoping | Construction work | Castledon School | Competition | Restricted Tender | South East | Q1 2020/21 | Q2 2020/21 | 1,200,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | City of London Academy, Highgate Hill | Competition | Restricted Tender | London | Q1 2020/21 | Q4 2020/21 | 9,216,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | East London Science School | Direct Award | Restricted Tender | London | Q1 2020/21 | Q1 2021/22 | 30,372,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | Grand Union Village Primary School | Competition | Restricted Tender | London | Q2 2020/21 | Q2 2021/22 | 11,484,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | Harris Rainham Sixth Form | Competition | Restricted Tender | London | Q1 2020/21 | Q1 2021/22 | 14,772,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | Havering Special Free School | Competition | Restricted Tender | London | Q1 2020/21 | Q1 2021/22 | 7,344,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | Yorkshire and the Humber | Scoping | Construction work | Kingston Upon Hull LA Special - Wave 2 | Competition | Restricted Tender | Yorkshire and the Humber | Q3 2020/21 | Q3 2021/22 | 11,304,000 | Not set | Not set |
Education | Schools | N/A | DFE | Priority Schools Building Programme | Programme | New build | London | Scoping | Construction work | Marjorie McClure School | Competition | Restricted Tender | London | Q1 2020/21 | Q1 2021/22 | 17,172,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New Build/ Refurbishment | London | Scoping | Construction work | Newham Collegiate Sixth Form, City of London Academy | Competition | Restricted Tender | London | Q2 2020/21 | Q4 2020/21 | 8,232,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | East of England | Scoping | Construction work | North Lincolnshire LA Special - Wave 2 | Competition | Restricted Tender | East of England | Q3 2020/21 | Q4 2021/22 | 8,916,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | Yorkshire and the Humber | Scoping | Construction work | North Yorkshire LA Special - Wave 2 | Competition | Restricted Tender | Yorkshire and the Humber | Q3 2020/21 | Q4 2021/22 | 8,400,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New Build/ Refurbishment | South West | Scoping | Construction work | Oasis Academy, Temple Quarter | Direct Award | Restricted Tender | South West | Q1 2020/21 | Q4 2020/21 | 40,224,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | Pinn River All Age School | Competition | Restricted Tender | London | Q2 2020/21 | Q4 2021/22 | 18,576,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | South West | Scoping | Construction work | Portsmouth Special School | Competition | Restricted Tender | South West | Q1 2020/21 | Q1 2021/22 | 9,828,000 | Not set | Not set |
Education | Schools | N/A | DFE | Priority Schools Building Programme | Programme | New Build/ Refurbishment | South East | Scoping | Construction work | Reigate Priory Community Junior School | Competition | Restricted Tender | South East | Q3 2020/21 | Q2 2021/22 | 12,000,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New Build/ Refurbishment | East Midlands | Scoping | Construction work | Seva School | Competition | Restricted Tender | East Midlands | Q1 2020/21 | Q1 2021/22 | 13,440,000 | Not set | Not set |
Education | Schools | N/A | AA Projects | LA - Programme | Programme | New build | North East | Scoping | Construction work | St Wilfrid's RC College School | Competition | Restricted Tender | North East | Q2 2020/21 | Q3 2020/21 | 1,440,000 | Not set | Not set |
Education | Schools | N/A | DFE | Priority Schools Building Programme | Programme | New build | South East | Scoping | Construction work | The Astley Cooper School | Competition | Restricted Tender | South East | Q2 2020/21 | Q1 2021/22 | 20,880,000 | Not set | Not set |
Education | Schools | N/A | DFE | Priority Schools Building Programme | Programme | Refurbishment | South West | Scoping | Construction work | The Bay (CoE) School Sandown IoW | Competition | Restricted Tender | South West | Q1 2020/21 | Q4 2020/21 | 7,800,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | South East | Scoping | Construction work | The Beeches | Competition | Restricted Tender | South East | Q1 2020/21 | Q1 2021/22 | 6,924,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | Refurbishment / Remodel | London | Scoping | Construction work | The Bridge Satellite Provision | Competition | Restricted Tender | London | Q2 2020/21 | Q1 2021/22 | 2,784,000 | Not set | Not set |
Education | Schools | N/A | DFE | Priority Schools Building Programme | Programme | New Build/ Refurbishment | London | Scoping | Construction work | The Douay Martyrs Catholic School | Competition | Restricted Tender | London | Q1 2020/21 | Q4 2020/21 | 12,012,000 | Not set | Not set |
Education | Schools | N/A | DFE | Priority Schools Building Programme | Programme | New build | South East | Scoping | Construction work | The John Henry Newman | Competition | Restricted Tender | South East | Q2 2020/21 | Q1 2021/22 | 20,628,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | The Maritime Academy | Direct Award | Restricted Tender | London | Q1 2020/21 | Q1 2021/22 | 36,600,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | South West | Scoping | Construction work | Two Bridges Academy | Competition | Restricted Tender | South West | Q2 2020/21 | Q2 2021/22 | 11,988,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | South West | Scoping | Construction work | Two Rivers CE Primary | Competition | Restricted Tender | South West | Q1 2020/21 | Q1 2021/22 | 6,036,000 | Not set | Not set |
Education | Schools | N/A | LB Hackney | LA - Programme | Programme | New build | London | Scoping | Construction work | Urswick School Extension | Competition | Restricted Tender | London | Q1 2020/21 | Q1 2021/22 | 3,900,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New Build/ Refurbishment | West Midlands | Scoping | Construction work | Warwickshire LA Special - Wave 2 | Competition | Restricted Tender | West Midlands | Q2 2020/21 | Q1 2021/22 | 4,668,000 | Not set | Not set |
Education | Schools | N/A | AA Projects | LA - Programme | Programme | New build | West Midlands | Scoping | Construction work | Woodlands School | Competition | Restricted Tender | West Midlands | Q1 2020/21 | Q2 2020/21 | 1,500,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | North East | Scoping | Construction work | Callerton Academy | Direct Award | Restricted Tender | North East | Q3 2020/21 | Q3 2021/22 | 24,600,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | Yorkshire and the Humber | Scoping | Construction work | Cockburn Laurence Calvert Academy | Direct Award | Restricted Tender | Yorkshire and the Humber | Q1 2020/21 | Q2 2021/22 | 18,324,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | South West | Scoping | Construction work | Cornwall LA Special - Wave 2 | Direct Award | Restricted Tender | South West | Q2 2020/21 | Q2 2021/22 | 7,500,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | North West | Scoping | Construction work | Edgar Wood Academy | Direct Award | Restricted Tender | North West | Q2 2020/21 | Q1 2021/22 | 25,848,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | South East | Scoping | Construction work | Essex LA Special - Wave 2 | Direct Award | Restricted Tender | South East | Q1 2020/21 | Q1 2021/22 | 6,720,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | North West | Scoping | Construction work | Halton LA Special - Wave 2 | Direct Award | Restricted Tender | North West | Q2 2020/21 | Q1 2021/22 | 6,684,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | North East | Scoping | Construction work | Hartlepool LA Special - Wave 2 | Direct Award | Restricted Tender | North East | Q2 2020/21 | Q2 2021/22 | 6,744,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | South East | Scoping | Construction work | Hertfordshire LA Special - Wave 2 | Direct Award | Restricted Tender | South East | Q3 2020/21 | Q3 2021/22 | 6,960,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | North East | Scoping | Construction work | Northumberland LA Special - Wave 2 | Direct Award | Restricted Tender | North East | Q2 2020/21 | Q1 2021/22 | 7,224,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | South West | Scoping | Construction work | Oasis Academy South Bristol | Competition | Restricted Tender | South West | Q3 2020/21 | Q3 2021/22 | 24,264,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | Reach Academy 2 | Direct Award | Restricted Tender | London | Q3 2020/21 | Q3 2021/22 | 37,200,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | South East | Scoping | Construction work | REAch2 Aveley/Ockendon | Direct Award | Restricted Tender | South East | Q2 2020/21 | Q2 2021/22 | 9,000,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | North West | Scoping | Construction work | REAch2 Aveley/Ockendon | Direct Award | Restricted Tender | North West | Q2 2020/21 | Q1 2021/22 | 6,624,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | West Midlands | Scoping | Construction work | Sandwell LA Special - Wave 2 | Direct Award | Restricted Tender | West Midlands | Q2 2020/21 | Q1 2021/22 | 8,268,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | Saracens Primary School | Direct Award | Restricted Tender | London | Q1 2020/21 | Q4 2020/21 | 12,516,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | West Midlands | Scoping | Construction work | Shropshire LA Special - Wave 2 | Direct Award | Restricted Tender | West Midlands | Q2 2020/21 | Q1 2021/22 | 10,464,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | West Midlands | Scoping | Construction work | Solihull LA Special - Wave 2 | Direct Award | Restricted Tender | West Midlands | Q2 2020/21 | Q1 2021/22 | 8,640,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | South West | Scoping | Construction work | Somerset LA Special - Wave 2 | Direct Award | Restricted Tender | South West | Q2 2020/21 | Q1 2021/22 | 9,672,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | London | Scoping | Construction work | St Andrew the Apostle Greek Orthodox School | Competition | Restricted Tender | London | Q1 2020/21 | Q4 2020/21 | 41,052,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | North West | Scoping | Construction work | Stoke on Trent LA Special - Wave 2 | Direct Award | Restricted Tender | North West | Q2 2020/21 | Q1 2021/22 | 6,624,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | East of England | Scoping | Construction work | Suffolk LA Special - Wave 2 | Direct Award | Restricted Tender | East of England | Q2 2020/21 | Q3 2020/21 | 7,284,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | North East | Scoping | Construction work | Tees Valley LA Special - Wave 2 | Direct Award | Restricted Tender | North East | Q2 2020/21 | Q1 2021/22 | 9,720,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | West Midlands | Scoping | Construction work | The Chance Academy | Competition | Restricted Tender | West Midlands | Q2 2020/21 | Q1 2021/22 | 22,260,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | South East | Scoping | Construction work | The Trinity School | Direct Award | Restricted Tender | South East | Q1 2020/21 | Q1 2021/22 | 26,532,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | North West | Scoping | Construction work | Warrington LA Special - Wave 2 | Direct Award | Restricted Tender | North West | Q1 2020/21 | Q1 2021/22 | 5,436,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build | West Midlands | Scoping | Construction work | Wednesfield Technology Primary School | Competition | Restricted Tender | West Midlands | Q1 2020/21 | Q2 2021/22 | 7,644,000 | Not set | Not set |
Education | Schools | N/A | DFE | Free School Programme | Programme | New build - special | West Midlands | Scoping | Construction work | Worcestershire LA Special - Wave 2 | Direct Award | Restricted Tender | West Midlands | Q3 2020/21 | Q2 2021/22 | 4,200,000 | Not set | Not set |
Education | Schools | N/A | N/A | Condition Improvement Fund | Programme | Capital funding made available via bidding to eligible schools | UK | Scoping | Construction work | Condition Improvement Fund | Competition | Multiple | UK | 2020/21 | 2021/22 | 480,000,000 | Not set | Not set |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | Kennett Residential Scheme | Project | 500 housing unit scheme with commercial space & associated infrastructure with planning - ready to go | East of England | Consents Approved | Construction work | Kennet | Infrastructure works, highways & utilities | Open Tender | East of England | Q3 2020/21 | Q4 2020/21 | 28,000,000 | Not set | Provision of 150 affordable houses in early phases including enterprise park of 80,000 sq ft of commercial space & retirement village & health centre |
Transport | Local Authority | Health/Green Infrastructure | TVCA | Local Cycling & Walking Infrastructure Plan | Programme | A Local Cycling & Walking Infrastructure Plan (LCWIP) has been developed and submitted to DfT. Extensive work has been undertaken to identify a number of corridors across Tees Valley where investment would facilitate an increase in walking and cycling for shorter journeys. Corridors have been shortlisted where infrastructure would provide for utility trips, including short to medium length journeys between housing and employment, but also shorter trips for education, retail, leisure, health and personal business. The corridors will also provide links to national and local public transport hubs, improving access to existing and future bus and rail services. Delivering the programme of active transport corridors will provide better connectivity across the region. These safe, accessible routes, enable stages of trips to work, education and training to be made by active transport. In turn, being more active leads to better health so fewer days taken as sick leave, which contributes to productivity and economic growth and reduces costs of healthcare to the NHS. Using active transport, as stage of a trip, replaces the use of a car, and reduces carbon emissions. Improving public realm, with path and cycle ways, improves the physical urban environment, creating more vibrant attractive communities. Making use of active forms of transport has known social benefits for health and wellbeing, the ability to interact with other people, as well better air quality. | North East | Planning and Consents | Construction work | Cycling and walking infrastructure | Engineering, Design, Consultancy, Planning | Other | North East | Q4 2020/21 | Q2 2021/22 | 25,000,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Science and Research | Research | Research and Innovation Infrastructure | N/A | Advance Manufacturing Lifesciences and Research Centre CPI | Project | The centre will ensure the UK is a technology and innovation leader in pharmaceutical manufacturing, aimed at cell and gene therapy and will play a pivotal role in the UK government ambition to drive forward advanced manufacturing within the life sciences field. The Centre has the potential to deliver upwards of 20,000 jobs | North East | Planning and Consents | Construction work | CPI - Life science research centre | Construction Services/Design and Build | Other | North East | Q3 2020/21 | Q1 2021/22 | 25,000,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Works and Pensions | Works and Pensions | N/A | Department for Work and Pensions | Cardiff Treforest and Ty Bevan | Programme | CAT B Fit Out and FF&E | Wales | Consents Approved | Construction work | Cardiff Treforest and Ty Bevan | CAT B Fit Out and FF&E | Restricted Tender | Wales | Q1 2020/21 | Q3 2020/21 | 21,250,000 | Not set | Not set |
Works and Pensions | Works and Pensions | N/A | Blackpool Council | Blackpool Hub | Project | CAT A Base Build Construction | North West | Planning and Consents | Construction work | Blackpool Hub | CAT A Base Build Construction | Restricted Tender (OJEU) | North West | Q2 2020/21 | Q1 2021/22 | 60,000,000 | Not set | Not set |
Works and Pensions | Works and Pensions | N/A | Department for Work and Pensions | Front Of House Relocations | Programme | CAT B Fit Out and FF&E | UK | Various | Construction work | Front Of House Relocations | CAT B Fit Out and FF&E. Locations include Reading, Bangor, Poplar, Manchester, Dundee, Almwch and Milford Haven | Restricted Tender | UK | Q2 2020/21 | Q2 2020/21 | 12,500,000 | Not set | Not set |
Works and Pensions | Works and Pensions | N/A | Department for Work and Pensions | Back Of House Relocations | Programme | CAT B Fit Out and FF&E | UK | Various | Construction work | Back Of House Relocations | CAT B Fit Out and FF&E. Locations include Manchester, Milton Keynes, Burnley, Chesterfield and Preston | Restricted Tender | UK | Q2 2020/21 | Q2 2020/21 | 4,500,000 | Not set | Not set |
Works and Pensions | Works and Pensions | N/A | Department for Work and Pensions | Life Cycle Works | Programme | Asset Replacement Works | UK | Active Programme | Construction work | Life Cycle Works | Asset Replacement Works across DWP estate comprising mechanical, electrical and building fabric works. | Restricted Tender | UK | Q1 2020/21 | Q1 2020/21 | 36,250,000 | Not set | Not set |
Justice | HM Courts | N/A | HMCTS | Court Capital | Programme | Capital maintenance programme | UK | Various | Construction work | FM or SAA framework | N/A | Open Tender | UK | Q3 2020/21 | Q4 2020/21 | 43,326,857 | Not set | Not set |
Justice | HM Courts | N/A | HMCTS | Court Reform | Programme | Capital investment enabling works/reconfiguration | UK | Various | Construction work | SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q2 2020/21 | 9,579,633 | Not set | Not set |
Justice | HM Prisons | N/A | HMPPS | Custodial Capital | Programme | Capital maintenance and investment programme | UK | Various | Construction work | SAA framework | N/A | Open Tender | UK | Q3 2020/21 | Q4 2020/21 | 159,638,133 | Not set | Not set |
Justice | HM Prisons | N/A | HMPPS | Custodial Resource | Programme | Resource maintenance programme | UK | Various | Construction work | SAA framework | N/A | Open Tender | UK | Q3 2020/21 | Q4 2020/21 | 22,033,858 | Not set | Not set |
Justice | HM Prisons | N/A | HMPPS | HMPP Estate Transformation | Programme | Capital investment programme | UK | Various | Construction work | Modular CCS framework & SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q3 2020/21 | 10,200,000 | Not set | Not set |
Justice | Border Force | N/A | Home Office | Home Office Border Force | Programme | Capital maintenance and investment programme | UK | Various | Construction work | FM or SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q3 2020/21 | 3,328,173 | Not set | Not set |
Justice | Border Force | N/A | Home Office | Home Office Core | Programme | Capital maintenance and investment programme | UK | Various | Construction work | FM or SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q3 2020/21 | 13,151,496 | Not set | Not set |
Justice | HM Prisons | N/A | HMPPS | PETP Reconfiguration | Programme | Capital investment programme | UK | Various | Construction work | SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q3 2020/21 | 12,571,520 | Not set | Not set |
Justice | Probation | N/A | Probation | Probation AP | Programme | Capital investment programme | UK | Various | Construction work | SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q3 2020/21 | 5,096,142 | Not set | Not set |
Justice | Probation | N/A | Probation | Probation Resource | Programme | Resource maintenance programme | UK | Various | Repair and maintenance services | FM | N/A | Open Tender | UK | Q2 2020/21 | Q3 2020/21 | 4,000,000 | Not set | Not set |
Justice | Probation | N/A | Probaiton | Probation TR | Programme | Resource maintenance programme | UK | Various | Construction work | FM or SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q2 2020/21 | 2,553,540 | Not set | Not set |
Justice | Youth Custody | N/A | Youth Custody | Youth Custody Reform | Programme | Capital investment programme | UK | Various | Construction work | SAA framework | N/A | Open Tender | UK | Q2 2020/21 | Q3 2020/21 | 1,000,000 | Not set | Not set |
Justice | HM Prisons | N/A | HMPPS | Glen Parva | Project | New prison | East Midlands | Active Programme | Construction work | Scape framework | N/A | Restricted Tender | East Midlands | Q2 2020/21 | Q2 2020/21 | 75,797,116 | Not set | Not set |
Justice | HM Prisons | N/A | HMPPS | Wellingborough | Project | New prison | East Midlands | In Construction | Construction work | SAA framework | N/A | Open Tender | East Midlands | Q1 2020/21 | Q1 2020/21 | 166,353,894 | Not set | Not set |
Cabinet Office | HM Revenue & Customs | Borders | HMRC | Borders | EU Transition | Programme | Borders and customs site operations | England | Planning and Consents | Construction work | EU Transition sites | Establish sites to undertake border checks | Restricted Tender | England | Q1 2020/21 | Q2 2020/21 | 16,000,000 | Not set | Not set |
Home Office | Home Office | N/A | N/A | Emergency Services Mobile Communications | Programme | Emergency Services Mobile Communications | UK | Active Programme | Construction work | Acquisition, Design and Build Services for Mobile Telecommunications Mast sites | Acquisition Design and Build services to strengthen the ESMCP Masts to support the Shared Rural Network programme. | Open Tender (OJEU) | UK | Q3 2020/21 | Q1 2021/22 | 20,000,000 | Not set | Not set |
Utilities | Water and Sewerage | AMP7 | Affinity Water | Affinity Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South East | Active Programme | Construction work | Affinity Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South East | 2020/21 | 2020/21 | 142,853,532 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-affinity-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Anglian Water | Anglian Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | East of England | Active Programme | Construction work | Anglian Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | East of England | 2020/21 | 2020/21 | 183,772,159 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-anglian-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Anglian Water | Anglian Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | East of England | Active Programme | Construction work | Anglian Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | East of England | 2020/21 | 2020/21 | 228,816,908 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Bristol Water | Bristol Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South West | Active Programme | Construction work | Bristol Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South West | 2020/21 | 2020/21 | 36,670,707 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-bristol-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Dwr Cymru Water | Dwr Cymru Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | Wales | Active Programme | Construction work | Dwr Cymru Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | Wales | 2020/21 | 2020/21 | 149,217,328 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-dwr-cymru-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Dwr Cymru Water | Dwr Cymru Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | Wales | Active Programme | Construction work | Dwr Cymru Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | Wales | 2020/21 | 2020/21 | 153,902,431 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Hafren Dyfrdwy | Hafren Dyfrdwy wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | Wales | Active Programme | Construction work | Hafren Dyfrdwy wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | Wales | 2020/21 | 2020/21 | 8,635,148 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-hafren-dyfrdwy-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Hafren Dyfrdwy | Hafren Dyfrdwy wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | Wales | Active Programme | Construction work | Hafren Dyfrdwy wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | Wales | 2020/21 | 2020/21 | 1,490,533 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Northumbrian Water | Northumbrian Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | North East | Active Programme | Construction work | Northumbrian Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | North East | 2020/21 | 2020/21 | 141,475,414 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-northumbrian-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Northumbrian Water | Northumbrian Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | North East | Active Programme | Construction work | Northumbrian Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | North East | 2020/21 | 2020/21 | 90,584,180 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Portsmouth Water | Portsmouth Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South East | Active Programme | Construction work | Portsmouth Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South East | 2020/21 | 2020/21 | 21,486,614 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-portsmouth-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Severn Trent Water | Severn Trent Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | West Midlands | Active Programme | Construction work | Severn Trent Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | West Midlands | 2020/21 | 2020/21 | 197,144,893 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-severn-trent-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Severn Trent Water | Severn Trent Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | West Midlands | Active Programme | Construction work | Severn Trent Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | West Midlands | 2020/21 | 2020/21 | 292,899,936 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | South East Water | South East Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South East | Active Programme | Construction work | South East Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South East | 2020/21 | 2020/21 | 81,798,619 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-south-east-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | South Staffordshire Water | South Staffordshire Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | West Midlands | Active Programme | Construction work | South Staffordshire Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | West Midlands | 2020/21 | 2020/21 | 49,956,397 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-south-staffs-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | South West Water | South West Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South West | Active Programme | Construction work | South West Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South West | 2020/21 | 2020/21 | 72,288,436 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-south-west-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | South West Water | South West Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | South West | Active Programme | Construction work | South West Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | South West | 2020/21 | 2020/21 | 106,671,902 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Southern Water | Southern Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South East | Active Programme | Construction work | Southern Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South East | 2020/21 | 2020/21 | 148,201,349 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-southern-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Southern Water | Southern Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | South East | Active Programme | Construction work | Southern Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | South East | 2020/21 | 2020/21 | 239,260,427 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Sutton & East Surrey Water | Sutton & East Surrey Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South East | Active Programme | Construction work | Sutton & East Surrey Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South East | 2020/21 | 2020/21 | 25,167,197 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-ses-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Thames Water | Thames Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | London | Active Programme | Construction work | Thames Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | London | 2020/21 | 2020/21 | 580,264,180 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-thames-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Thames Water | Thames Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | London | Active Programme | Construction work | Thames Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | London | 2020/21 | 2020/21 | 475,416,718 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | United Utilities Water | United Utilities Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | North West | Active Programme | Construction work | United Utilities Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | North West | 2020/21 | 2020/21 | 161,238,698 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-united-utilities-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | United Utilities Water | United Utilities Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | North West | Active Programme | Construction work | United Utilities Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | North West | 2020/21 | 2020/21 | 254,909,441 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Wessex Water | Wessex Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | South West | Active Programme | Construction work | Wessex Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | South West | 2020/21 | 2020/21 | 53,364,269 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-wessex-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Wessex Water | Wessex Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | South West | Active Programme | Construction work | Wessex Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | South West | 2020/21 | 2020/21 | 208,634,757 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Yorkshire Water | Yorkshire Water wholesale water service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to water supply infrastructure | Yorkshire and the Humber | Active Programme | Construction work | Yorkshire Water wholesale water service capex and DPC capex (where applicable) | Maintenance and improvements to water supply infrastructure | Multiple | Yorkshire and the Humber | 2020/21 | 2020/21 | 132,744,927 | https://www.ofwat.gov.uk/publication/pr19-final-determinations-yorkshire-water-final-determination/ | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Utilities | Water and Sewerage | AMP7 | Yorkshire Water | Yorkshire Water wholesale wastewater service capex and DPC capex (where applicable) | Programme | Maintenance and improvements to wastewater supply infrastructure | Yorkshire and the Humber | Active Programme | Construction work | Yorkshire Water wholesale wastewater service capex and DPC capex (where applicable) | Maintenance and improvements to wastewater supply infrastructure | Multiple | Yorkshire and the Humber | 2020/21 | 2020/21 | 408,780,989 | Not set | Figures represent PR19 final determination estimates of gross capital expenditure for 2020-21 based on the level of on-going and enhancement expenditure we have allowed for each company. These figures should therefore be regarded as an indication of the potential capital expenditure pipeline. |
Flood Defence | Flood | Flood and coastal Risk Management Infrastructure | Environment Agency | Environment Agency Flood and Coastal Risk Management Capital Programme | Programme | Multiple flood and coastal risk management infrastructure projects delivered throughout England. | England | Active Programme | Construction work | Environment Agency Next Generation Supplier Arrangements | On-going contract agreement with framework suppliers. The framework was announced in 2019. Framework is 4yrs + possible 4yr extension. | Other | England | 2020/21 | 2020/21 | 679,000,000 | https://www.gov.uk/government/news/environment-agency-announces-new-green-legacy-for-26bn-flood-and-coastal-risk-management-programme | The work is a mix of flood and coastal risk management projects already under contract and work that will largely be procured through the EA's Next Generation Suppliers Arrangement Framework. This Framework came into effect in 2019. The successful suppliers are split across six geographic areas - Information available via the URL address provided. It includes work accelerated from the 21/21 programme and also work to repair damaged assets following winter flooding. Circa œ120M (of the œ679M) will be provided for flood and coast infrastructure schemes led by other Risk Management Authorities, they will individually have their own contracting arrangements. March 2020 budget announced œ5.2 billion of Capital for the next six-year flood defence programme (2021-27). The majority of works will be procured through the Frameworks already let to suppliers. There is however a significant opportunity via these suppliers for enagegement of SME/tier 2 contractors as let by the principle contractors. |
Flood Defence | Flood | Flood and coastal Risk Management Infrastructure Maintenance | Environment Agency | Environment Agency Flood and Coastal Risk Management Maintenance Programme | Programme | Multiple flood and coastal risk management infrastructure maintenance activity delivered throughout England. Essential maintenance works to ensure critical assets can continue to operate, including reservoir safety maintenance. | England | Active Programme | Repair and maintenance services | Environment Agency Next Generation Supplier Arrangements | On-going contract agreement with framework suppliers. The framework was announced in 2019. Framework is 4yrs + possible 4yr extension. | Other | England | 2020/21 | 2020/21 | 272,000,000 | https://www.gov.uk/government/news/environment-agency-announces-new-green-legacy-for-26bn-flood-and-coastal-risk-management-programme | The work is a mix of work already under contract and work that will be procured through the EA's Next Generation Suppliers Arrangement Framework. This includes a focus on supporting SME's with a "FCRM Operational Framework" for the smaller projects. |
Flood Defence | Water and Sewerage | River navigation and water transfer | Environment Agency | Environment Agency Navigation & Water Land and Biodiversity Programme | Programme | Environment Agency Navigation programme - overall 112 projects with a forecast of œ15.1m ? of which circa 44 projects that are undertaking construction in 20/21 œ10.1m. A small number of those projects are critical for the safety of navigation users and (may) also enable drinking water supply abstraction through retained water levels. Environment Agency Water Land and Biodiversity (WLB) Programme ? overall 217 projects with a forecast of œ26.9m ? of which circa 24 construction related activities with forecasts over œ50k in 2020/21. A small number of those projects (may) be critical to the development of the drinking water distribution network | England | Active Programme | Construction work | Environment Agency Fnext Generation Supplier Arrangements | On-going contract agreement with framework suppliers. The framework was announced in 2019. Framework is 4yrs + possible 4yr extension. | Other | England | 2020/21 | 2020/21 | 42,000,000 | https://www.gov.uk/government/news/environment-agency-announces-new-green-legacy-for-26bn-flood-and-coastal-risk-management-programme | The work is a mix of work already under contract and work that will be procured through the EA's Next Generation Suppliers Arrangement Framework. This includes a focus on supporting SME's with a "FCRM Operational Framework" for the smaller projects. |
Rural Affairs | Research | N/A | N/A | Building Services and Minor Works Framework | Programme | Building Services and Minor Works Framework | England | Active Programme | Construction work | Building Services and Minor Works Framework | Building Services and Minor Works Framework | Restricted Tender (OJEU) | England | 2020/21 | Q4 2020/21 | 36,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | Thorney Island Construction | Programme | Infrastructure CDF Thorney Island Construction | England | Active Programme | Construction work | Infrastructure CDF Thorney Island Construction | Infrastructure CDF Thorney Island Construction | Framework Call Off | England | 2020/21 | Q1 2020/21 | 12,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | Future Funding Resources | Programme | Future Funding Resources | England | Active Programme | Consultancy services | Future Funding Resources | Future Funding Resources | Competition Under Framework | England | Q1 2020/21 | Q2 2020/21 | 10,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH Programme Manager | England | Active Programme | Consultancy services | SCAH Programme Manager | SCAH Programme Manager | Competition Under Framework | England | 2020/21 | Q3 2020/21 | 10,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH - Project Management Science Hub | England | Active Programme | Consultancy services | SCAH - Project Management Science Hub | SCAH - Project Management Science Hub | Competition Under Framework | England | 2020/21 | Q3 2020/21 | 6,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH - Science Hub - Design | England | Active Programme | Consultancy services | SCAH - Science Hub - Design | SCAH - Science Hub - Design | Restricted Tender (OJEU) | England | 2020/21 | Q4 2020/21 | 43,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH Cost Management Services | England | Active Programme | Consultancy services | SCAH Cost Management Services | SCAH Cost Management Services | Competition Under Framework | England | Q2 2020/21 | Q3 2020/21 | 10,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH Transformational Change Consultant | England | Active Programme | Consultancy services | SCAH Transformational Change Consultant | SCAH Transformational Change Consultant | Competition Under Framework | England | Q2 2020/21 | Q3 2020/21 | 10,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH - Refurbishment Design | England | Active Programme | Consultancy services | SCAH - Refurbishment Design | SCAH - Refurbishment Design | Competition Under Framework | England | 2020/21 | Q3 2020/21 | 7,700,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH - Site Wide Logistics | England | Active Programme | Consultancy services | SCAH - Site Wide Logistics | SCAH - Site Wide Logistics | Other | England | 2020/21 | Q4 2020/21 | 5,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | SCAH (Science Capability in Animal Health) | Programme | SCAH Project Management Services | England | Active Programme | Consultancy services | SCAH Project Management Services | SCAH Project Management Services | Competition Under Framework | England | Q1 2020/21 | Q3 2020/21 | 5,000,000 | Not set | Not set |
Rural Affairs | Research | N/A | N/A | Science Hub | Programme | Science Hub - Containment PM/QS | England | Active Programme | Consultancy services | Science Hub - Containment PM/QS | Science Hub - Containment PM/QS | Competition Under Framework | England | Q2 2020/21 | Q3 2020/21 | 5,000,000 | Not set | Not set |
Culture | Science Museum Group | Science Museum Group | N/A | N/A | N/A | Hard Services Maintenance | UK | Scoping | Repair and maintenance services | Hard Services Maintenance | Term Maintenance tender for the delivery of Hard Services to provide for national cover for our 6 sites. A planned maintenance service and reactive response to emergencies and services failures will be required, in addition to a CAFM solution. SMG has chosen to use the Negotiated Procedure based on the complexity of the sites and the services to be provided where the variety of service solutions provided may mean it proves useful to allow a discussion between the tenderer and the buyer. | Negotiated Tender (OJEU) | UK | Q1 2020/21 | Q4 2020/21 | 15,000,000 | https://www.mytenders.co.uk/ | Not set |
Communications | Broadband | Gigabit connectivity | Various Local Authorities | Local Full Fibre Networks programme | Programme | Grant funding to Local Authorities to procure connectivity or infrastructure to stimulate the market for full fibre | UK | Various | Construction work | Various | There are various types of frameworks being used, e.g PSBA for Cardiff | Other | UK | Q2 2020/21 | Q3 2020/21 | 53,000,000 | Not set | funding to be provided through a Grant Funding Agreement |
Communications | Broadband | Gigabit connectivity | Various Local Authorities & Health / Education / OGD Commissioning Groups | Rural Gigabit Connectivity programme | Programme | Grant funding to Local Authorities or commissioning groups for gigabit connectivity to public sector hub sites | UK | Various | Construction work | Various | Call Offs | Other | UK | Q2 2020/21 | Q3 2020/21 | 3,000,500 | Link to RGC page no localised procurement page available yet | Grant Funding Agreement Local Body |
Communications | Broadband | Gigabit connectivity | Various Local Authorities | Superfast Programme | Programme | Grant funding to Local Authorities and Devolved Administrations to contract for network operator to extend coverage in areas of market failure | UK | Various | Construction work | Various | There are various procurements underway through the superfast programme led by our Local Body Partners to gap fund roll-out of broadband infrastrcture to areas that would not be covered by commercial means. However the only one live that may make use of DCMS funding is Connecting Devon and Somerset with a potential total contract value of 33m of which œ18.8m could be DCMS. | Other | UK | Q2 2020/21 | Q3 2020/21 | 18,800,000 | https://www.connectingdevonandsomerset.co.uk/cds-launches-new-procurement-process/ | Procurement led by Local Body partner to which DCMS will provide fundig through a Grant Agreement |
Transport | Airports | Infrastructure and Development | N/A | Teesside International Airport Limited (TIAL), Southside Business Park | Project | The project aims to develop a specialist (aviation) logistics business park at Teesside International Airport and runs parallel to the runway. The site extends to 270 acres and has the potential for 3.4 million square feet of employment space (including: 36,447 sq. ft of B1 of Business office space, 75,175 sq. ft of B1 of supporting other business space , 38,750 sq. ft of B2 General (Industrial) space, 1,751,643 sq. ft of B8 Storage and Distribution Space and 1,453,128 SQ FT of B8 of Hangars (Warehouses/B2 Industrial Space). Overall, the plan is to provide a mix of aviation related and general employment development, which aligns to current planning status. Whilst offering significant development opportunities the proposed Southside Business Park currently has no infrastructure in place. Extensive technical work has been undertaken by consultants to identify and cost the infrastructure requirements to unlock the site for development. in summary, the infrastructure requirements comprise road access to the A67, utilities including power supply and flood mitigation work. The requirements have been costed at œ23.6m In terms of direct economic impact, the development will provide over œ200m of investment during construction with 4,200 jobs over the life of the construction. The 3.3m square feet of employment space will support jobs growth of 4,400 and œ211m GVA. Consent for the transaction has been formally received from all TIAL shareholders, including 6 Local Authorities.ÿ The necessary acquisitions of land from Homes England have now all been completed.ÿ Teesside International Development Limited (TID) is arranging for all necessary planning, surveying and other preparatory works (including assessing whether the project can proceed on the basis of a former planning permission which is expected to still be extant). TID is also preparing the specification for the main infrastructure works contract. With the extant planning consent, we can commence procurement in May. Works will then start in September run for 18 months | North East | Planning and Consents | Construction work | Southside Business Park | Construction Services | Other | North East | Q3 2020/21 | Q2 2021/22 | 23,600,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Culture | Research | British Library | British Library | Boston Spa Renewed | Programme | The British Library will run out of storage space in 2026 and will not be able to comply with its statutory obligation. The BSP Renewed Programme aims at (1) building a new 225km high density, automated storage facility which includes high air tightness/ passive design, reduced oxygen, fire protection and robotic storage also (2) refurbishment and renovation of an existing 1970?s building for storage / staff occupancy and (3) incorporate modernised office space for up to 500 staff together with new public facing facilities. | North East | Scoping | Construction work | Boston Spa Renewed Construction | Enabling works and construction of new hi-tech, airtight storage building, refurbishment of existing office space | Other | Yorkshire and the Humber | Q4 2020/21 | Q4 2021/22 | 63,700,000 | Likley to be contracts finder but may choose a framework route which therefore would be published to the market | Procurement route not yet decided - reviewing frameworks and full OJEU tender |
Culture | Research | British Library | British Library | Boston Spa Renewed | Programme | The British Library will run out of storage space in 2026 and will not be able to comply with its statutory obligation. The BSP Renewed Programme aims at (1) building a new 225km high density, automated storage facility which includes high air tightness/ passive design, reduced oxygen, fire protection and robotic storage also (2) refurbishment and renovation of an existing 1970?s building for storage / staff occupancy and (3) incorporate modernised office space for up to 500 staff together with new public facing facilities. | North East | Scoping | Construction work | Boston Spa Renewed Automation | Design and installation of automation system inside storage building | Other | Yorkshire and the Humber | Q4 2020/21 | Q4 2021/22 | 13,800,000 | https://www.gov.uk/contracts-finder | Not set |
Science and Research | Research | Advanced Manufacturing Space | N/A | Advanced Life Science Manufacturing Park | Project | An opportunity exists utilising land in local authority and combined authority ownership to construct an advanced life science manufacturing park linked to existing research facilities. This in response to the identified need, noted by the office for life sciences, for UK based life science manufacturing space. The project will see two spec-build units constructed acting as anchor tenants targeted at securing inward investment in to both the region and UK informed by a wealth of evidence of demand. This proposal is in line with UK life science policy and will go some way in fulfilling the Government drive to secure increased space of this nature. The Manufacturing Park has the potential to deliver in excess of 5,000 jobs | North East | Planning and Consents | Construction work | Advanced Manufacturing Park D&B | Construction Services/Design and Build | Other | North East | Q4 2020/21 | Q2 2021/22 | 21,000,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Education | Local Authority | N/A | London Borough of Merton | Capital Condition Works Programme | Programme | Annual capital works for various schools in Merton | London | Active Programme | Construction work | Various, not yet finalised | Various capital projects for schools, mostly construction | Restricted Tender | London | Q2 2020/21 | Q2 2020/21 | 5,500,000 | https://www.londontenders.org/# | Not set |
Utilities | Local Authority | N/A | London Borough of Merton | Civic Centre Boiler Replacement | Project | Existing boilers over 35 years old and are coming to end of life | London | Scoping | Architectural, construction, engineering and inspection services | Civic Centre Boiler Replacement | 10 of the building's main boilers need replacement | Restricted Tender | London | Q3 2020/21 | Q1 2021/22 | 5,000,000 | https://www.londontenders.org/# | Not set |
Education | Higher Education | Research and Development | CPCA | University of Peterborough Phase 2 | Project | Peterborough is ranked by Centre for Cities, as the fifth most at risk city in the UK in terms of job and economic scarring from COVID 19. It is cities like this, that will be hit hardest and have the longest recovery, where quality of life and employment is lowest and the productivity and knowledge intensity of business is poorest. However, Government infrastructure investment, through such a Transformation Fund, in partnership with MCA?s, local authorities, private sector investors and local business, has the potential to tackle low productivity, sector knowledge intensity, poor skills and low wages, by building new universities and innovation ecosystems, in towns such as Peterborough, to raise all four measures, underpinning recovery longer term and building in future resilience. New funding now, could bring forward Phases 2 and 3 into build between 2021-24, repositioning Peterborough to take much greater advantage of the longer -term recovery 2025-30. Investing in the UK?s university infrastructure is important, but in doing so as part of the COVID recover, rebound and renew cycle, the sector?s consolidation and temporary contraction for regrowth, MUST incorporate the removal of the HE cold spots and the damage they inflict of left-behind cities like Peterborough. The Phase 2 project complements the 2020-22 investment of œ29m from the CPCA, PCC and private sector into a Phase 1 Academic Teaching Building for a new University of Peterborough, to produce 3,000 pa graduates. Phase 2 is proposed to fund an Advanced Manufacturing & Materials Research Centre to extend university delivery into research PhDs and create an innovation eco-system to drive business research in Peterborough and The Fens. | East of England | Planning and Consents | Research and development services and related consultancy services and Construction work | Going to Tender | JCT contract 2 stage design and build | Restricted Tender (OJEU) | East of England | Q4 2020/21 | Q3 2021/22 | 20,000,000 | Not set | Not set |
Science and Research | Research | Research and Innovation Infrastructure | N/A | Net Zero Innovation Centre | Project | This project will deliver a new demonstration space for innovative green technology, specifically aiming to accelerate the development and deployment of technologies to decarbonise. The new centre will create new market opportunities for UK tech start-ups and industrial businesses alike and contribute towards the overall Net Zero Teesside agenda. The centre will deliver 30 direct jobs and has the potential to contribute significantly to the overall ambition of delivering 5,500 jobs and safeguarding a further 16,000 | North East | Planning and Consents | Construction work | Innovation Centre | Construction Services/Design and Build | Other | North East | Q2 2020/21 | Q3 2020/21 | 20,000,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Culture | National Portrait Gallery | Art Gallery | National Portrait Gallery | Inspiring People Project | Project | Gallery refurbishment | London | Consents Approved | Construction work | Inspiring people project | Refurbishment of the entire gallery | Restricted Tender (OJEU) | London | Q1 2020/21 | Q3 2020/21 | 19,100,000 | https://www.delta-esourcing.com/ | Not set |
Justice | HM Prisons | Prisons | SCOTTISH PRISON SERVICE | HMP Glasgow | Project | By replacing an old and unfit prison, HMP Glasgow will provide a fit-for-purpose community facing prison, which supports the Government's objective of reducing the risk of prisoners reoffending on release from custody. SPS will award a contract for the design and construction of HMP Glasgow either on the site of HMP Barlinnie or a site to be acquired by Scottish Prison Service. | Scotland | Scoping | Construction work | HMP Glasgow | Design and construction of new prison | Open Tender | Scotland | Q3 2020/21 | 2020/21 | 387,600,000 | https://www.gov.scot/publications/infrastructure-investment-plan-2015-project-pipeline-update-march-2020/ | Not set |
Justice | HM Prisons | Prisons | SCOTTISH PRISON SERVICE | HMP Greenock (R) | Project | By replacing an old and unfit prison, HMP Greenock (R) will provide a fit-for-purpose prison, which supports the Government's objective of reducing the risk of prisoners reoffending on release from custody. | Scotland | Scoping | Construction work | HMP Greenock (R) | Design and construction of new prison | Open Tender | Scotland | Q4 2020/21 | 2020/21 | 152,900,000 | https://www.gov.scot/publications/infrastructure-investment-plan-2015-project-pipeline-update-march-2020/ | Not set |
Transport | Roads | N/A | Welsh Government | A55 Junctions 15 and 16 | Project | Key improvements to Junctions 15 and 16 on the A55 road in North Wales | Wales | Planning and Consents | Construction work | A55 Junctions 15 and 16 | D&B Contractor | Open Tender (OJEU) | Wales | Q4 2020/21 | Q4 2021/22 | 50,000,000 | Not set | Not set |
Transport | Roads | N/A | Welsh Government | A494 River Dee Bridge | Project | Key improvements to River Dee Bridge | Wales | Planning and Consents | Construction work | A494 River Dee Bridge | D&B Contractor | Open Tender (OJEU) | Wales | Q3 2020/21 | Q2 2021/22 | 60,000,000 | Not set | Not set |
Education | Local Authority | Property | Welsh Government | New facility at Offa's Dyke, Welshpool | Project | New facility at Offa's Dyke, Welshpool | Wales | Consents Approved | Construction work | New facility at Offa's Dyke, Welshpool | New build construction | Open Tender | Wales | Q1 2020/21 | Q2 2020/21 | 1,900,000 | Not set | Not set |
Housing and Regeneration | Local Authority | Property | Welsh Government | Northern Gateway Infrastructure Works, Deeside | Project | Northern Gateway Infrastructure Works, Deeside | Wales | Consents Approved | Construction work | Northern Gateway Infrastructure Works, Deeside | Northern Gateway Infrastructure Works, Deeside | Restricted Tender (OJEU) | Wales | Q2 2020/21 | Q2 2021/22 | 7,000,000 | Not set | Not set |
Housing and Regeneration | Local Authority | Property | Welsh Government | Rhyd Y Blew ? Plot 1 Building Construction Contract | Project | Rhyd Y Blew ? Plot 1 Building Construction Contract | Wales | Consents Approved | Construction work | Rhyd Y Blew ? Plot 1 Building Construction Contract | Rhyd Y Blew ? Plot 1 Building Construction Contract | Open Tender (OJEU) | Wales | Q2 2020/21 | Q4 2020/21 | 6,100,000 | Not set | Not set |
Transport | Roads | Property | Welsh Government | SA1 Multi-Storey Car Park D& B Contract | Project | SA1 Multi-Storey Car Park D& B Contract | Wales | Consents Approved | Construction work | SA1 Multi-Storey Car Park D& B Contract | SA1 Multi-Storey Car Park D& B Contract | Open Tender (OJEU) | Wales | Q2 2020/21 | Q4 2020/21 | 5,000,000 | Not set | Not set |
Education | Local Authority | Historic Environment/Cadw | Welsh Government | Porth Mawr Phase 3 | Project | Conversion of Castle Gate into visitor accommodation along with conservation works to the fabric of the monument | Wales | Planning and Consents | Repair and maintenance services | Porth Mawr Phase 3 | Conversion of Castle Gate into visitor accommodation along with conservation works to the fabric of the monument | Open Tender | Wales | Q3 2020/21 | Q4 2020/21 | 250,000 | Not set | Not set |
Education | Local Authority | Historic Environment/Cadw | Welsh Government | Tretower Court Barn Visitor Centre | Project | Updating of existing vistor centre and conservation | Wales | Planning and Consents | Repair and maintenance services | Tretower Court Barn Visitor Centre | Tretower Court Barn Visitor Centre | Open Tender | Wales | Q2 2020/21 | Q3 2020/21 | 500,000 | Not set | Not set |
Education | Local Authority | Historic Environment/Cadw | Welsh Government | Falls From Height | Project | Installation of bespoke barrier system at selected monuments | Wales | Planning and Consents | Repair and maintenance services | Falls from Height | Falls from Height | Open Tender | Wales | Q2 2020/21 | Q3 2020/21 | 300,000 | Not set | Not set |
Transport | Rail | N/A | Translink | Ballymartin Park & Ride Ph2 | Project | Construction of additional Park & Ride provision at Ballymartin | Northern Ireland | Planning and Consents | Construction work | Ballymartin Park & Ride Ph2 | Construction of additional Park & Ride provision at Ballymartin | Framework Call Off | Northern Ireland | Q4 2020/21 | Q2 2021/22 | 1,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Rail | N/A | Translink | Lurgan to Portadown - S&T Cable Renewals | Project | Design and construction of a serviceable cable duct route system for the Signalling and Telecoms (S&T) cabling infrastructure between Lurgan and Portadown. | Northern Ireland | Planning and Consents | Construction work | Lurgan to Portadown - S&T Cable Renewals | Design and construction of a serviceable cable duct route system for the Signalling and Telecoms (S&T) cabling infrastructure between Lurgan and Portadown. | Framework Call Off | Northern Ireland | Q4 2020/21 | Q3 2021/22 | 10,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Rail | N/A | Translink | Dark Arch Whiteabbey - Track Renewal (Construction) | Project | Full Track Renewal between Dark Arches and Whiteabbey (circa 800m) including track drainage and ground stabilisation enabling works. | Northern Ireland | Scoping | Construction work | Dark Arch Whiteabbey - Track Renewal (Construction) | Full Track Renewal between Dark Arches and Whiteabbey (circa 800m) including track drainage and ground stabilisation enabling works. | Other | Northern Ireland | Q4 2020/21 | Q3 2021/22 | 8,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | ICT in place. Planning not yet approved awaiting DFI input. |
Transport | Rail | N/A | Translink | Platform LED Lighting Programme. | Programme | Installation of Quality LED Lighting systems including smart controls across all NIR Stations, Halts, Platforms, Walkways and Car Parks. | Northern Ireland | Scoping | Construction work | Platform LED Lighting Programme. | Installation of Quality LED Lighting systems including smart controls across all NIR Stations, Halts, Platforms, Walkways and Car Parks. | Framework Call Off | Northern Ireland | Q4 2020/21 | Q3 2021/22 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Funding not yet allocated. Subject to capital funding. |
Transport | Rail | N/A | Translink | Cullybackey - LC Upgrade MCB | Project | Level Crossing upgrades at Cullybackey | Northern Ireland | Scoping | Construction work | Cullybackey - LC Upgrade MCB | Level Crossing upgrades at Cullybackey | Framework Call Off | Northern Ireland | Q2 2020/21 | 2022/23 | 12,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | ICT in place and design progressing. |
Transport | Rail | N/A | Translink | Bus Engineering Pit Modifications. | Project | Pit modifications to ensure suitable pit clearances are available for engineering resource. | Northern Ireland | Planning and Consents | Construction work | Bus Engineering Pit Modifications. | Pit modifications to ensure suitable pit clearances are available for engineering resource. | Framework Call Off | Northern Ireland | Q2 2020/21 | Q1 2021/22 | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Rail | N/A | Translink | Gauging Clearance Programme | Programme | Programme of works for route wide gauging clearance surveys | Northern Ireland | Scoping | Architectural, construction, engineering and inspection services | Gauging Clearance Programme | Programme of works for route wide gauging clearance surveys | Framework Call Off | Northern Ireland | Q4 2020/21 | Q1 2021/22 | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Rail | N/A | Translink | Mossley West P&R Extention | Project | Development of existing Park & Ride Facility at Mossley West to expand Car Parking Capacity | Northern Ireland | Planning and Consents | Construction work | Mossley West P&R Extention | Development of existing Park & Ride Facility at Mossley West to expand Car Parking Capacity | Framework Call Off | Northern Ireland | Q2 2020/21 | Q1 2021/22 | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Rail | N/A | Translink | Trooperslane Park & Ride | Project | Construction of a Park & Ride facility at Trooperslane | Northern Ireland | Planning and Consents | Construction work | Trooperslane Park & Ride | Construction of a Park & Ride facility at Trooperslane | Other | Northern Ireland | Q3 2020/21 | Q1 2021/22 | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Rail | N/A | Translink | Track Asset Surveying | Project | Ballast sampling / testing and ground investigation works. | Northern Ireland | Scoping | Architectural, construction, engineering and inspection services | Track Asset Surveying | Ballast sampling / testing and ground investigation works. | Framework Call Off | Northern Ireland | Q3 2020/21 | Q1 2021/22 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Schools | N/A | CPD | Pan Government Clerk of Works Framework | Project | Not set | Northern Ireland | Scoping | Architectural, construction, engineering and inspection services | Pan Government Clerk of Works Framework | Not set | Open Market | Northern Ireland | Q2 2020/21 | Not set | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Schools | N/A | CPD | Integrated Supply Team for Millstrand IPS | Programme | Complete design from ICT and construct new build for Millstrand IPS | Northern Ireland | Planning and Consents | Construction work | Integrated Supply Team for Millstrand IPS | Complete design from ICT and construct new build for Millstrand IPS | Open Market | Northern Ireland | Q1 2020/21 | Q1 2021/22 | 6,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Schools | N/A | CPD | Integrated Supply Team for Rowandale IPS | Programme | Complete design from ICT and construct new build | Northern Ireland | Planning and Consents | Construction work | Integrated Supply Team for Rowandale IPS | Complete design from ICT and construct new build | Open Market | Northern Ireland | Q2 2020/21 | Q1 2021/22 | 6,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Further Education | N/A | Education Authority | Ardnashee | Project | Amalgamation of Belmont House and Foyle View Special schools to create Ardnashee. | Northern Ireland | Scoping | Construction work | Ardnashee | Amalgamation of Belmont House and Foyle View Special schools to create Ardnashee. | Framework Call Off | Northern Ireland | Q3 2020/21 | Q4 2020/21 | 30,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Further Education | N/A | Education Authority | Integrated Supply Team for Enniskillen IPS | Project | Design and construct new build for Enniskillen IPS | Northern Ireland | Planning and Consents | Construction work | Integrated Supply Team for Enniskillen IPS | Design and construct new build for Enniskillen IPS | Open Market | Northern Ireland | Q2 2020/21 | Q3 2020/21 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Feasibility study complete. Land issues to be resolved. |
Education | Further Education | N/A | Education Authority | Holy Trinity College - IST | Project | 1300 pupil new school, design and build | Northern Ireland | Planning and Consents | Construction work | Holy Trinity College - IST | 1300 pupil new school, design and build | Open Market | Northern Ireland | Q2 2020/21 | Q4 2020/21 | 6,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Further Education | N/A | Education Authority | Gaelscoil Ui Dhochartaigh, Strabane ICT | Project | Contract for new build facilities for Gaelscoil Ui Dhochartaigh school. | Northern Ireland | Scoping | Construction work | Gaelscoil Ui Dhochartaigh, Strabane ICT | Contract for new build facilities for Gaelscoil Ui Dhochartaigh school. | Open Market | Northern Ireland | Q2 2020/21 | Q3 2020/21 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Further Education | N/A | Education Authority | Integrated Consultant Team for Seaview PS, Belfast | Project | Traditional contract to erect a 14 classbase Primary School & Double Nursery Unit | Northern Ireland | Consents Approved | Construction work | Integrated Consultant Team for Seaview PS, Belfast | Traditional contract to erect a 14 classbase Primary School & Double Nursery Unit | Open Market | Northern Ireland | Q3 2020/21 | Q4 2020/21 | 8,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Further Education | N/A | Education Authority | Islandmagee Primary School - Contractor | Project | 5 class base, traditional build | Northern Ireland | Planning and Consents | Construction work | Islandmagee Primary School - Contractor | 5 class base, traditional build | Open Market | Northern Ireland | Q2 2020/21 | Q2 2021/22 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Education | Schools | N/A | CPD | St. Mary's University College - Library Refurbishment | Project | Not set | Northern Ireland | Scoping | Construction work | St. Mary's University College - Library Refurbishment | Not set | Open Market | Northern Ireland | Q2 2020/21 | Not set | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Health | Further Education | N/A | CPD Health Estates | Lisnaskea Helath and Care Centre | Project | Design Contract | Northern Ireland | Scoping | Architectural, construction, engineering and inspection services | Lisnaskea Helath and Care Centre | Design Contract | Open Market | Northern Ireland | Q2 2020/21 | Not set | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Schools | N/A | CPD | Refurbishment of new shared premises for VOYPIC and Include Youth charity organisations | Project | Refurbishment of 100 Great Patrick Street, Belfast | Northern Ireland | Scoping | Construction work | Refurbishment of new shared premises for VOYPIC and Include Youth charity organisations | Refurbishment of 100 Great Patrick Street, Belfast | Open Market | Northern Ireland | Q4 2020/21 | Q3 2020/21 | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Schools | N/A | CPD | Shankill Gateway Phase 1 Construction Public Realm | Project | Deliver a high quality Public Realm Scheme to include natural stone paving with granite kerbs, lighting and boundary treatments. | Northern Ireland | Planning and Consents | Construction work | Shankill Gateway Phase 1 Construction Public Realm | Deliver a high quality Public Realm Scheme to include natural stone paving with granite kerbs, lighting and boundary treatments. | Open Market | Northern Ireland | Q3 2020/21 | Q3 2020/21 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Schools | N/A | CPD | Belfast Streets Ahead Phase 3 - IST | Project | This Public Realm Improvement and Regeneration Project will link to Ulster University's plans for their campus at York Street, delivering high quality streetscapes and open space and including improvements to surfacing, lighting, landscaping, street furniture and public artwork. | Northern Ireland | Scoping | Construction work | Belfast Streets Ahead Phase 3 - IST | This Public Realm Improvement and Regeneration Project will link to Ulster University's plans for their campus at York Street, delivering high quality streetscapes and open space and including improvements to surfacing, lighting, landscaping, street furniture and public artwork. | Open Market | Northern Ireland | Q4 2020/21 | Q2 2021/22 | 25,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Schools | N/A | CPD | Albert Street Public Realm | Project | Deliver high quality public realm including footpath resurfacing, street lighting and boundary treatments | Northern Ireland | Planning and Consents | Construction work | Albert Street Public Realm | Deliver high quality public realm including footpath resurfacing, street lighting and boundary treatments | Open Market | Northern Ireland | Q2 2020/21 | Not set | 15,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Outline Business Case in preparation. Funding not yet allocated. Subject to capital funding. |
Housing and Regeneration | Local Authority | N/A | NIHE | Fence Painting | Project | Fence painting to NIHE properties | Northern Ireland | Scoping | Construction work | Fence Painting | Fence painting to NIHE properties | Open Market | Northern Ireland | Q1 2020/21 | Q1 2020/21 | 12,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Outline Business Case 1 in preparation. Funding not yet allocated. Subject to capital funding. |
Housing and Regeneration | Local Authority | N/A | NIHE | Construction Related Professional Services | Project | Not set | Northern Ireland | Scoping | Architectural, construction, engineering and inspection services | Construction Related Professional Services | Not set | Open Market | Northern Ireland | Q2 2020/21 | Q2 2020/21 | 6,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Local Authority | N/A | NIHE | Major Adaptations to NIHE Dwellings | Project | Not set | Northern Ireland | Scoping | Construction work | Major Adaptations to NIHE Dwellings | Not set | Open Market | Northern Ireland | Q2 2020/21 | Q2 2020/21 | 20,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Local Authority | N/A | NIHE | Refurbishment Works Waterside Triangle | Project | Not set | Northern Ireland | Scoping | Construction work | Refurbishment Works Waterside Triangle | Not set | Open Market | Northern Ireland | Q3 2020/21 | Q3 2020/21 | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Local Authority | N/A | NIHE | DLO Minor Works | Project | Minor Works to NIHE dwellings | Northern Ireland | Scoping | Construction work | DLO Minor Works | Minor Works to NIHE dwellings | Open Market | Northern Ireland | Q3 2020/21 | Q2 2020/21 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Local Authority | N/A | NIHE | External Cyclical Maintenance 2020 | Project | External Maintenance to NIHE dwellings | Northern Ireland | Scoping | Construction work | External Cyclical Maintenance 2020 | External Maintenance to NIHE dwellings | Open Market | Northern Ireland | Q1 2020/21 | Q2 2020/21 | 20,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Local Authority | N/A | NIHE | External Cyclical Maintenance 2021 | Project | External Maintenance to NIHE dwellings | Northern Ireland | Scoping | Construction work | External Cyclical Maintenance 2021 | External Maintenance to NIHE dwellings | Open Market | Northern Ireland | Q3 2020/21 | Q2 2020/21 | 20,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Local Authority | N/A | NIHE | Medium Rise Flats Rathcoole Flat Roof Repairs | Project | Roof Repairs to NIHE dwellings | Northern Ireland | Scoping | Construction work | Medium Rise Flats Rathcoole Flat Roof Repairs | Roof Repairs to NIHE dwellings | Open Market | Northern Ireland | Q3 2020/21 | Q4 2020/21 | 2,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Housing and Regeneration | Local Authority | N/A | NIHE | Planned Maintenance & Improvement | Project | Maintenance and improvement works to NIHE Dwellings | Northern Ireland | Scoping | Construction work | Planned Maintenance & Improvement | Maintenance and improvement works to NIHE Dwellings | Open Market | Northern Ireland | Q3 2020/21 | Q2 2020/21 | 450,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Flood Defence | Flood | N/A | CPD | Newcastle - Shimna River Flood Alleviation | Project | Construction of reinforced concrete walls with sheet pile foundations | Northern Ireland | Planning and Consents | Construction work | Newcastle - Shimna River Flood Alleviation | Construction of reinforced concrete walls with sheet pile foundations | Open Market | Northern Ireland | Q3 2020/21 | Q3 2020/21 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Flood Defence | Flood | N/A | CPD | Glenbrook River East Belfast Flood Alleviation Scheme | Project | Provision of flood alleviation works. | Northern Ireland | Scoping | Construction work | Glenbrook River East Belfast Flood Alleviation Scheme | Provision of flood alleviation works. | Open Market | Northern Ireland | Q1 2020/21 | Not set | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Flood Defence | Flood | N/A | DfI Roads | Flush Bridge Stream Lisburn Flood Alleviation Scheme | Project | Provision of flood alleviation works. | Northern Ireland | Scoping | Construction work | Flush Bridge Stream Lisburn Flood Alleviation Scheme | Provision of flood alleviation works. | Open Market | Northern Ireland | Q1 2020/21 | Not set | 600,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Flood Defence | Flood | N/A | DfI Roads | Hollywell Burn Antrim Flood Alleviation Scheme | Project | Provision of flood alleviation works | Northern Ireland | Scoping | Construction work | Hollywell Burn Antrim Flood Alleviation Scheme | Provision of flood alleviation works | Open Market | Northern Ireland | Q1 2020/21 | Not set | 600,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Utilities | Water and Sewerage | N/A | Northern Ireland Water | Ards North, Carrowdore, Ballywalter, Ballyhaskin | Project | Main Contract - Civil & M&E works | Northern Ireland | Scoping | Construction work | Ards North, Carrowdore, Ballywalter, Ballyhaskin | Main Contract - Civil & M&E works | Framework Call Off | Northern Ireland | Q2 2020/21 | Q2 2020/21 | 15,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Utilities | Water and Sewerage | N/A | Northern Ireland Water | Framework for Site Supervision | Project | Not set | Northern Ireland | Scoping | Architectural, construction, engineering and inspection services | Framework for Site Supervision | Not set | Framework Call Off | Northern Ireland | Q2 2020/21 | Q2 2020/21 | 40,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Utilities | Water and Sewerage | N/A | Northern Ireland Water | Lurgan Moira WIIM 2.1 Work Package | Project | Main Contract - Civil & M&E works | Northern Ireland | Scoping | Construction work | Lurgan Moira WIIM 2.1 Work Package | Main Contract - Civil & M&E works | Framework Call Off | Northern Ireland | Q2 2020/21 | Q2 2020/21 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Utilities | Water and Sewerage | N/A | Northern Ireland Water | Ravenhill Avenue, Belfast, Sewer Upgrades-Capital Delivery | Project | Not set | Northern Ireland | Scoping | Construction work | Ravenhill Avenue, Belfast, Sewer Upgrades-Capital Delivery | Not set | Framework Call Off | Northern Ireland | Q2 2020/21 | Q2 2020/21 | 4,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Utilities | Water and Sewerage | N/A | Northern Ireland Water | Dunadry WWPS Upgrade | Project | Not set | Northern Ireland | Scoping | Construction work | Dunadry WWPS Upgrade | Not set | Framework Call Off | Northern Ireland | Q2 2020/21 | Q2 2020/21 | 600,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Utilities | Water and Sewerage | N/A | Northern Ireland Water | Carmoney - Strabane TM | Project | Carmoney - Strabane Strategic Link Watermain. Main contract Civil M&E works | Northern Ireland | Scoping | Construction work | Carmoney - Strabane TM | Carmoney - Strabane Strategic Link Watermain. Main contract Civil M&E works | Open Market | Northern Ireland | Q3 2020/21 | Q3 2020/21 | 15,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Justice | Prisons | N/A | CPD | Magilligan Redevelopment | Project | Redevelopment of Magilligan Prison | Northern Ireland | Scoping | Construction work | Magilligan Redevelopment | Redevelopment of Magilligan Prison | Open Market | Northern Ireland | Q3 2020/21 | 2021/22 | 80,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Justice | Prisons | N/A | CPD | New Facility for Women - Construction | Project | New build to replace existing accommodation on shared site with Young Offenders. | Northern Ireland | Scoping | Construction work | New Facility for Women - Construction | Not set | Open Market | Northern Ireland | Q3 2020/21 | 2021/22 | 30,000,000 | http://isni.gov.uk/pipeline/Pipeline.xlsx | Not set |
Transport | Roads | N/A | Highways England, Stockton Borough Council | A19 Tees Crossing - Portrack Relief Road | Project | Middlesbrough Station sits in the town?s historic quarter and Enterprise Zone and is a vital link between the town?s commercial and retail centre, civic buildings, Teesside University, Middlesbrough College, the bus station, Riverside Stadium and the Middlehaven regeneration area. The station is constrained by its current capacity of just two platforms. This is compromising the ability to deliver existing franchise commitments, including a direct service to/from London, and future aspirations for increased services. As a result there is a need to address this constraint, refurbish the station and improve passenger facilities linking in with the wider redevelopment of Middlesbrough town centre. The first phase of works will see the extension of an existing platform to ensure the station is able to accommodate services and redevelopment and construction of commercial floorspace in an area of the station which is presently at risk of becoming structurally unsound. There will be significant economic benefits associated with the delivery of station improvements: the construction of a platform to accommodate longer 10 carriage trains running directly to London and facilitate more local services; the provision of commercial floorspace relating to the undercroft area of the station; enhanced passenger facilities to cater for increased usage of the station; and wider benefits linked to the regeneration of the town centre. | North East | Planning and Consents | Construction work | Portrack Relief Road | Design/Build of highways | Other | North East | Q4 2020/21 | Q1 2021/22 | 14,000,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Transport | Rail | N/A | Nexus | Tyne & Wear Metro Asset Renewals | Project | Renewal of end-of-life and non complient track assets south of Tyne Dock Metro Station | North East | Active Programme | Construction work | Tyne Dock Track Renewal | Renewal of circa 570m plain line track. | Open Tender | North East | Q2 2020/21 | Q3 2020/21 | 1,343,000 | To be procured using the North East Procurement Organisation portal. www.nepo.org | Not set |
Transport | Rail | N/A | Nexus | Tyne & Wear Metro Asset Renewals | Project | Not set | North East | Active Programme | Construction work | Christon Rd S&C | Renewal of Christon Rd Switches and Crossing - South Gosforth | Open Tender | North East | Q2 2020/21 | Q3 2020/21 | 1,205,000 | To be procured using the North East Procurement Organisation portal. www.nepo.org | Not set |
Transport | Roads | Electricity Generation, Ports | South Tyneside Council | A185 Dualling between A19 and Port of Tyne | Project | Project to dual the MRN between the A19 Tyne Tunnel and Port of Tyne toimprove reliabilty for Nissan Exports and development of Dogger Bank wind farm | North East | Scoping | Architectural, construction, engineering and inspection services | NEPO | Works advertised through local procurement portals- NEPO in particular | Restricted Tender | North East | Q4 2020/21 | Q2 2021/22 | 25,000,000 | Not set | Not set |
Transport | Roads | Electricity Generation, Ports | South Tyneside Council | A19 Lane Gain/Drop South Bound | Project | Lane gain / lane drop arrangement on the A19 northbound approach to Tyne Tunnel to assist with movements between the A194 and A185 junctions, while reducing queuing and flow breakdown on the Tunnel approach and providing connectivity between the SRN, employment sites such as Nissan and the Port of Tyne. A BCR of 1.9 was calculated for the north bound lane gain/drop and it is expected that a southbound scheme would yield similar results. | North East | Scoping | Architectural, construction, engineering and inspection services | NEPO | Works advertised through local procurement portals- NEPO in particular | Restricted Tender | North East | Q4 2020/21 | Q2 2021/22 | 3,000,000 | Not set | Not set |
Transport | Roads | Public Transport | South Tyneside Council | South Tyneside- Sunderland Public Transport Corridoor | Project | Package of works to boost public transport reliability between South Shields and Sunderland | North East | Active Programme | Construction work | NEPO | Works advertised through local procurement portals- NEPO in particular | Restricted Tender | North East | Q4 2020/21 | Q2 2021/22 | 3,000,000 | Not set | Not set |
Transport | Roads | Housing Delivery | South Tyneside Council | A184 Mill Lane- White Mare Pool Improvements | Project | Highway adjustments to the A194 and White Mare Pool to faciliate local plan growth and unlock strategic housing sites | North East | Scoping | Architectural, construction, engineering and inspection services | NEPO | Works advertised through local procurement portals- NEPO in particular | Restricted Tender | North East | Q4 2020/21 | Q2 2021/22 | 20,000,000 | Not set | Not set |
Transport | Roads | Transport | South Tyneside Council | Level Crossing Closures and new bridge / highway | Project | Level Crossing Closure with new Highway Bridge construction | North East | Active Programme | Architectural, construction, engineering and inspection services | NEPO | local procurement | Restricted Tender | North East | Q3 2020/21 | Q4 2020/21 | 20,000,000 | Not set | Not set |
Transport | Rail | Park & Ride | Birmingham City Council | Tile Hill Park & Ride | Project | Land Assembly, Demolition, Remediation & Infrastructure Works | West Midlands | Scoping | Construction Work | Tile Hill Park & Ride | Land Assembly, Demolition, Remediation & Infrastructure Works | Other | West Midlands | Q4 2020/21 | Q1 2021/22 | 1,687,500 | Not set | Not set |
Transport | Rail | Park & Ride | Coventry City Council | Coventry North Park & Ride | Project | Remediation & Infrastructure Works | West Midlands | Scoping | Construction Work | Coventry North Park & Ride | Remediation & Infrastructure Works | Other | West Midlands | Q4 2020/21 | Q1 2021/22 | 1,800,000 | Not set | Not set |
Transport | Rail | Metro Stop & Bus Interchange | Dudley Metropolitan Borough Council | Dudley Interchange & Portersfield | Project | Site Acquisition, Demolition & Infrastructure Works | West Midlands | Scoping | Construction Work | Dudley Interchange & Portersfield | Site Acquisition, Demolition & Infrastructure Works | Other | West Midlands | Q4 2020/21 | Q1 2021/22 | 5,612,000 | Not set | Not set |
Transport | Rail | Train Station | Birmingham City Council | Lionel Street Piazza | Project | Land Assembly, Demolition, Remediation | West Midlands | Scoping | Construction Work | Lionel Street Piazza | Land Assembly, Demolition, Remediation | Other | West Midlands | Q4 2020/21 | Q1 2021/22 | 3,000,000 | Not set | Not set |
Transport | Rail | N/A | Combined Authority | Wisbech Rail | Project | To provide a train service between wisbech and Cambridge by re opening the Wisbech to March line, establishing a station in Wisbech and enhance the March Station. The project is expected to provide inward investment and housing growth. GRIP3b is currently being finalised. GRIP 4 and 5 required and certainty of funding would enable programme confidence. The BCR is between 2-2.5. | East of England | Scoping | Research and development services and related consultancy services | ESPO | Local Government Contract | Restricted Tender | East of England | Q3 2020/21 | Q4 2020/21 | 23,000,000 | Not set | The contract value was estimated in the Full Business Case |
Housing and Regeneration | Local Authority | N/A | Northumberland CC | Ashington Potland Burn Build | Programme | Housing Estate - various procurements | North East | Planning and Consents | Architectural, construction, engineering and inspection services | Ashington Potland Burn Build | Housing Estate - various procurements | Open Tender | North East | Q3 2020/21 | Q4 2020/21 | 11,385,000 | Not set | Not set |
Transport | Roads | N/A | Combined Authority and Cambridgeshire County Council | Coldhams Lane | Project | The project will consider introducing improvements to the Roundabout at the junctions of Coldhams Lane, Brooks Road and Barnwell Road, Cambridge. This is primarily to improve road safety for all users passing through the area. The focus will be to provide this safer route and also provide a more pleasant, direct and safe pedestrian / cycling route to the newly improved Chisolm Trail. This area is seeing rapid housing and employment growth, with new housing planned to the north of Cherry Hinton. Aspirationally the option to deliver a Dutch Style Roundabout is part of Cambridgeshire's overall approach to encourage active travel and improve congestion. The budget to date does not at this stage cover these types improvements but more work is currently ongoing to determine what could be deliverable. Depending on the option the value for money ranges from medium to very high. | East of England | Active Programme | Research and development services and related consultancy services | Term Service Contract | Local government contract | Other | East of England | Q3 2020/21 | Q1 2021/22 | 6,000,000 | Not set | Several options still at stage of review and preferred option is still to be completed. Minimum is based on the budget we have to complete an improvement which would be seen as a small enhancement. The maximum cost is based on an option that would consider wider and more aspirational improvements |
Transport | Roads | N/A | Combined Authority and Cambridgeshire County Council | March Area Capacity Study | Project | The vision of Fenland District Council is set out within their Local Plan (2014), which aims ?to maximise the potential of the area and deliver jobs, skills, improved housing and new infrastructure?, making Fenland ?a better place to live, work and visit?. The Local Plan includes the delivery of 4,200 new homes in March as well 30 hectares of employment land to provide new jobs. The Option Assessment Report has developed a package of options which consist of local junction improvements to new strategic highway options. The BCR ranges from 2.0 to 4.4.Separate to this there are also a set of quick wins which are to be delivered this budget period. Full outurn costs are currently being developed for these. | East of England | Active Programme | Research and development services and related consultancy services and construction of Quick Wins | Term Service Contract | Local government contract | Other | East of England | Q3 2020/21 | Q4 2020/21 | 1,500,000 | Not set | Quick wins construction estimates still in development. Minimum is based on the budget for completing the Outline Business Case and the maximum is the approximate full outturn costs for construction of the Quick Wins. |
Energy | Local Authority | Low Carbon Refurbishments of LA buildings | Durham CC | Morrison busty | Project | This project will deliver an innovative, low carbon, whole place solution for the Morrison Busty Depot, incorporating a range of innovative technologies, comprising: Insulation works, Energy Storage Solutions, EV charging infrastructure, Air source Heat Pumps installation, 3MW of Solar PV, Infrared Heating and Power Purchase Agreements. The range of technologies implemented will turn this traditional depot into one of the smartest depots in the Country. This project will substantially reduce the carbon emissions of the buildings, by replacing heating gas with heat pumps, which use self-generated electricity from the solar farm as well as providing a smart EV charging infrastructure. | North East | Planning and Consents | Construction work | Morrison busty | Design and Build PPQ/ITT | Open Tender (OJEU) | North East | Q2 2020/21 | Q4 2020/21 | 10,000,000 | https://www.chroniclelive.co.uk/news/north-east-news/early-plans-tackle-climate-emergency-16221570 | Not set |
Works and Pensions | Works and Pensions | N/A | Department for Work and Pensions | Birmingham Front Of House Relocations | Project | CAT B Fit Out and FF&E | West Midlands | Planning and Consents | Construction work | Birmingham Front Of House Relocations | CAT B Fit Out and FF&E | Restricted Tender | West Midlands | Q2 2020/21 | Q2 2020/21 | 8,600,000 | Not set | Not set |
Transport | Roads | N/A | Combined Authority and Cambridgeshire County Council | A10 Dualling and Junctions | Project | Developing the highway improvement of the A10 North of Milton Interchange to south of Ely. Historic BCR is 2.8, this is currently being refreshed. | East of England | Planning and Consents | Construction work | ESPO | Local Government Contract | Open Tender (OJEU) | East of England | Q3 2020/21 | Q4 2020/21 | 8,000,000 | Not set | The contract value is for the Outlines Business Case, not outturn construction costs. |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | CAM Urban settlement L'ton | Project | 6000 housing unit scheme with commercial space & associated infrastructure | East of England | Scoping | Architectural, construction, engineering and inspection services | CAM L'ton | Full professional masterplan team | Competitive Dialogue (OJEU) | East of England | Q3 2020/21 | Q4 2020/21 | 7,000,000 | Not set | Includes provision of 1500 affordable houses & commercial space, connected by the Mayors Cambridgeshire Autonomous metro scheme |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | CAM Urban settlement Cax | Project | 5500 housing unit scheme with commercial space & associated infrastructure | East of England | Scoping | Architectural, construction, engineering and inspection services | CAM Cax | Full professional masterplan team | Competitive Dialogue (OJEU) | East of England | Q4 2020/21 | Q1 2021/22 | 7,000,000 | Not set | Includes provision of 1500 affordable houses & commercial space, connected by the Mayors Cambridgeshire Autonomous metro scheme |
Science and Research | Gas Storage | Green Infrastructure | N/A | Net Zero Teesside | Project | CCUS can play a significant role in local and national plans for regional development, and in the UK?s industrial strategy for a low carbon Northern Powerhouse. Net Zero Teesside could support up to 5,500 direct jobs during construction alone and could help to safeguard as many as 16,000 existing manufacturing jobs in the Tees Valley by increasing competitiveness through the production of ?differentiated? low carbon products. CCUS describes a group of process technologies that remove carbon dioxide emissions and store them deep underground to prevent them from being released into the atmosphere. The project has the potential to regenerate and revitalise the region with new technologies and investment as carbon dioxide utilisation companies are attracted by this new hub for CCUS technology. As a project that is pioneering CCUS technology and the way that it is applied, Net Zero Teesside will build world-leading skills and capabilities that can provide the opportunity to grow exports and create jobs. | North East | Planning and Consents | Construction work | Net Zero Teesside | Construction Services | Other | North East | Q4 2020/21 | Q2 2021/22 | 8,000,000 | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Works and Pensions | Works and Pensions | N/A | Department for Work and Pensions | Bristol Flowers Hill Relocations | Programme | CAT B Fit Out and FF&E | South West | Planning and Consents | Construction work | Bristol Flowers Hill Relocations | CAT B Fit Out and FF&E | Restricted Tender | South West | Q1 2020/21 | Q2 2020/21 | 4,500,000 | Not set | Not set |
Science and Research | Research | Fusion Research | UKAEA | Materials Research Facility extension | Project | extension of existing research building for materials | South East | Planning and Consents | Construction work | Design and Build MRF Extension Facility | CCS framework | Open Tender | South East | Q2 2020/21 | Q2 2020/21 | 4,100,000 | Not set | Not set |
Works and Pensions | Works and Pensions | N/A | Department for Work and Pensions | Birmingham Back Of House Relocations | Project | CAT B Fit Out and FF&E | West Midlands | Planning and Consents | Construction work | Birmingham Back Of House Relocations | CAT B Fit Out and FF&E | Restricted Tender | West Midlands | Q2 2020/21 | Q2 2020/21 | 3,900,000 | Not set | Not set |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | RAF Upwood Phase 1 | Project | 160 housing units | East of England | Consents Approved | Construction work | RAF Upwood Phase 1 | Infrastructure works, highways & utilities | Competitive Dialogue | East of England | Q3 2020/21 | Q3 2020/21 | 3,000,000 | Not set | Not set |
Housing and Regeneration | Housing Association | Community Centre | Cambridge City Council | New Community Hub | Project | New Community Hub to be built combining two older centres freeing up development land for 100+ housing. The new community hub will be a two storey highly sustainable building that targeting BREEAM ?Excellent?. The Community Hub space has been designed to be flexible and have shared use with additional groups with particular mobility or access needs. This flexibility offers greater programming opportunities including performance and theatre opportunities not currently available in the area. Planning approval is expected to be in July 2020 with a start on site for Autumn 2020. A contractor is already in place through the council?s Cambridge Investment Partnerships JV agreement with Hill Partnerships. A pre-construction services agreement (PCSA) is in draft form and the technical design team are ready to be mobilised as soon as planning has been approved. | East of England | Active Programme | Construction work | New Community Hub | Direct call off from Framework | Restricted Tender (OJEU) | East of England | Q2 2020/21 | Q3 2020/21 | 5,000,000 | Not set | Not set |
Transport | Local Authority | N/A | London Borough of Merton | Bishopsford Bridge | Project | Rebuilding of Bishopsford Bridge, an essential part of the highway in Merton | London | Planning and Consents | Construction work | Bishopsford Bridge TBC | Demolition and rebuild of Bishopsford Bridge | Restricted Tender | London | Q2 2020/21 | Q3 2020/21 | 2,700,000 | https://mertonnews.wordpress.com/2020/02/25/council-gives-the-green-light-to-re-build-bishopsford-bridge/ | Not set |
Utilities | Local Authority | N/A | London Borough of Merton | Building fabric term contract (Reactive Maintenance) | Project | Contract to provide reactive maintenance to council buildings | London | Planning and Consents | Repair and maintenance services | Building Fabric Reactive Works | Appointment of contractor to maintain and repair council buildings reactively | Restricted Tender | London | Q3 2020/21 | Q4 2020/21 | 2,500,000 | https://www.londontenders.org/# | This procurement would only get underway in 20/21 if an extension is not taken up from November 2020. |
Flood Defence | Local Authority | N/A | London Borough of Merton | Wimbledon Park Lake reservoir safety requirements - Design and Build | Project | Tender for single contract to design and build safety features at Wimbledon Lake | London | Consents Approved | Architectural, construction, engineering and inspection services | Wimbledon Park Lake reservoir safety requirements - Design and Build | Appointment of a single contractor | Open Tender | London | Q2 2020/21 | Q2 2020/21 | 750,000 | https://www.londontenders.org/# | Delayed but due to go to tender Summer 2020 |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | Fenland DC sites | Project | 3 sites, 400 housing units | East of England | Planning and Consents | Architectural, construction, engineering and inspection services | Fenland sites | Professional team for planning | Competitive Dialogue (OJEU) | East of England | Q3 2020/21 | Q4 2020/21 | 500,000 | Not set | 3 sites to deliver including affordable housing |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | London Road, Peterborough | Project | 80 unit scheme | East of England | Planning and Consents | Architectural, construction, engineering and inspection services | London Road | Professional team for planning | Competitive Dialogue | East of England | Q3 2020/21 | Q4 2020/21 | 300,000 | Not set | Not set |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | RAF Upwood Phase 2 | Project | 325 housing units in phase 2 | East of England | Planning and Consents | Architectural, construction, engineering and inspection services | RAF Upwood Phase 2 | Professional team for planning | Competitive Dialogue | East of England | Q3 2020/21 | Q3 2020/21 | 300,000 | Not set | Not set |
Housing and Regeneration | MHCLG | Housing, Construction & Infrastructure | CPCA | Former MOD Ely Site Phase 2 & City Centre Para | Project | 70 housing units | East of England | Planning and Consents | Architectural, construction, engineering and inspection services | Ely Resi projects | Professional team for planning | Competitive Dialogue | East of England | Q2 2020/21 | Q2 2020/21 | 250,000 | Not set | Not set |
Transport | Rail | N/A | Network Rail, Middlesbrough Council, TVCA | Middlesbrough Station - Undercroft and Platform Extension | Project | Middlesbrough Station sits in the town?s historic quarter and Enterprise Zone and is a vital link between the town?s commercial and retail centre, civic buildings, Teesside University, Middlesbrough College, the bus station, Riverside Stadium and the Middlehaven regeneration area. The station is constrained by its current capacity of just two platforms. This is compromising the ability to deliver existing franchise commitments, including a direct service to/from London, and future aspirations for increased services. As a result there is a need to address this constraint, refurbish the station and improve passenger facilities linking in with the wider redevelopment of Middlesbrough town centre. The first phase of works will see the extension of an existing platform to ensure the station is able to accommodate services and redevelopment and construction of commercial floorspace in an area of the station which is presently at risk of becoming structurally unsound. There will be significant economic benefits associated with the delivery of station improvements: the construction of a platform to accommodate longer 10 carriage trains running directly to London and facilitate more local services; the provision of commercial floorspace relating to the undercroft area of the station; enhanced passenger facilities to cater for increased usage of the station; and wider benefits linked to the regeneration of the town centre. Sustained jobs in the construction phase of the scheme are estimated to be in the region of approx. 389 jobs. This is equivalent to œ80m additional GVA over four years. Further direct monetised benefits have been quantified in the business case. It is estimated that the scheme will deliver œ210m of direct economic benefit. | North East | Planning and Consents | Architectural, construction, engineering and inspection services | Middlesbrough Station Phase 1 | Design/Build/Engineering | Other | North East | Q3 2020/21 | Q4 2020/21 | Not set | https://teesvalley-ca.gov.uk/investment/projects/ | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
* Contract award dates for defence contracts are on the basis of IPA estimates. | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |
**Estimated contract value represents maximum estimated contract value of procurements. | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set | Not set |