Road Number | Closure Start Date/Time | Closure End Date/Time | Description | Location | Traffic Management | Nature of Works | ||
---|---|---|---|---|---|---|---|---|
M25 | 22 Oct 2014 00:00 | 23 Dec 2016 00:00 | 2200-0530 various lane closures and slip road closures between jcts 11 and 13 on both A and B carriageways | Jn 11 to Jn 13/Jn 13 to Jn 11 | To Be Advised | Construction - Improvement/Upgrading | Not set | Not set |
M3 | 03 Nov 2014 22:00 | 07 Aug 2017 05:30 | M25 clockwise and anticlockwise to westbound M3 | Jct 12 link roads. M25 clockwise and anticlockwise to westbound M3 | Widith Restriction | Construction - Improvement/Upgrading | Not set | Not set |
M3 | 06 Nov 2014 22:00 | 07 Aug 2017 05:30 | 24hrs narrow lanes, both directions, for Managed Motorway scheme by Area 3. | Jct 1 to Jct 3. MP 32/0 to MP 37/3. (Actual MP 32/0 to MP 58/0) | Widith Restriction | Construction - Improvement/Upgrading | Not set | Not set |
M25 | 31 Mar 2015 22:00 | 16 Oct 2015 05:00 | 22:00-05:00, Lane 1,2,3 and Lane HS,1,2,3 closures, Anticlockwise, for concrete repair and surface treatment. | M25 Anticlockwise Junction 10 to Junction 9 | Lane Closure | Event | Not set | Not set |
M25 | 20 Jul 2015 22:00 | 25 Sep 2015 05:30 | 22:00-05:30 hrs, Various Lane closures and 50 mph speed restriction, clockwise for concrete bays replacement. Road works will be carried out on link section 4Km long at time. | Jn 8 to Jn 11 | Lane Closure | Event | Not set | Not set |
M25 | 25 Jul 2015 22:00 | 22 Oct 2015 05:00 | 2200-0500hrs, Carriageway resurfacing east and westbound, for Herts Highways | A414- between A1081 and Watling Street | Other | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 01 Aug 2015 22:00 | 05 Jan 2017 05:00 | 22:00hrs to 05:00hrs: Carriageway closure, various lane closures and narrow lanes both carriageways for A13 Congestion scheme. | Jct 29 to Jct 31/Jct 31 to Jct 29 181/3 to 187/4 and 187/4 to 181/3 | Lane Closure | Event | Not set | Not set |
M25 | 10 Aug 2015 21:30 | 12 Sep 2015 06:00 | 2130-0530hrs, Lane 1, 2 and 3 or Lane 4, 3 and 2 closure, anticlockwise for Maurer joint replacement. 40mph speed restriction in place | Jn 21 to Jn 20 | Lane Closure | Structure - New/Reconstruction | Not set | Not set |
M25 | 10 Aug 2015 22:00 | 03 Sep 2015 05:30 | 2200-0530 hrs, Lane 1,2 closure anticlockwise for carriageway fine milling works. | Jn 10 to Jn 9 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 10 Aug 2015 22:00 | 02 Sep 2015 05:30 | 2200-0530 hrs, Lane 123 or Lane 432 closure, anti clockwise for carriageway repairs | Jn 10 to Jn 9 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 10 Aug 2015 22:00 | 05 Sep 2015 06:00 | 22:00 - 05:30 Lanes 1,2,and 3 or Lane 4 3 and 2, clockwise for Construction, improvements & upgrading. | Jn 31 to Jn 1a | Lane Closure | Construction - Improvement/Upgrading | Not set | Not set |
M4 | 11 Aug 2015 02:00 | 25 Sep 2015 23:59 | 24hrs, Hard shoulder closure with Varioguard Westbound, for VMS renewals | Jn 4 to Jn 4B | Lane Closure | Signs - Maintenance | Not set | Not set |
M4 | 13 Aug 2015 05:30 | 13 Oct 2015 23:59 | 24hrs, Hard shoulder closure with Varioguard Westbound, for VMS renewals | Jn 4 to Jn 4B | Lane Closure | Signs - Maintenance | Not set | Not set |
M25 | 15 Aug 2015 22:00 | 02 Sep 2015 05:30 | 2200-0530 hrs, entry slip road closure anticlockwise for carriageway fine milling works. Diversion to Junction 11 and return | Jct 10 Anticlockwise entry slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 24 Aug 2015 22:00 | 04 Sep 2015 05:30 | 22:00-05:30 hrs, Lane 4-3-2 closure, clockwise for pavement works | Jn 9 to Jn 10 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 24 Aug 2015 22:00 | 04 Sep 2015 05:30 | 22:00-50:30 hrs, Carriageway closure, clockwise for pavement works. Diversion via exit slip roundabout and entry slip to rejoin | Jn 10 to Jn 10 | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 31 Aug 2015 22:00 | 01 Sep 2015 05:30 | 2200-0530 hrs, Lane 1 Closure Anti-Clockwise, for safety Barrier Repairs | M25 Anti-Clockwiseto M40 Westbound link road | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 01 Sep 2015 11:55 | 01 Sep 2015 18:27 | RTC off network | M25 "B" to M40 "A" link road closure for RTC off network | Carriageway Closure | Road Traffic Collision | Not set | Not set |
M25 | 01 Sep 2015 11:58 | 01 Sep 2015 12:27 | RTC | Jn 8 to Jn 9 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 01 Oct 2015 05:30 | 2130-0530hrs, Lane 1, 2 and 3 closure OR lane 2, 3 and 4 closure clockwise, for Maurer joint replacement | Jn 19 to Jn 21 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M4 | 01 Sep 2015 22:00 | 15 Sep 2015 05:30 | 2200-0530hrs, Carriageway closure, eastbound for structure works. Diversion Route: M4 East Bound onto Hogarth Lane onto Hogarth Roundabout onto A4 Westbound or A316 | Jct 2 eastbound exit slip | Carriageway Closure | Construction - Improvement/Upgrading | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200-0500 hrs, Hardshoulder and Lane 1 closure, anti-clockwise for electrical works | Jn 23 to Jn 22 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200 - 0500hrs, lane 3 and 4 closure, clockwise for scheduled routine maintenance | Jn 24 to Jn 25 (Please set NINA signs at MP 144/3) | Lane Closure | Sweeping of Carriageway | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200 - 0500hrs, lane 3 and 4 closure, anticlockwise for routine maintenance | Jn 25 to Jn 24 (Please set NINA signs at MP 145/9) | Lane Closure | Sweeping of Carriageway | Not set | Not set |
M1 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 22:00-05:00hrs Lane 3 and 2 closure Southbound for CAT 1 safety fence repairs | Jn 5 to Jn MSA | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M4 | 01 Sep 2015 22:00 | 11 Sep 2015 05:30 | 2200-0530hrs, Lane 1/2 closure Westbound, for VMS renewals | Jn 3 to Jn 4B | Lane Closure | Signs - Maintenance | Not set | Not set |
A40 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200-0500hrs, lane 1 and 2 closure eastbound, for routine maintenance | Jn M40 to Jn TfL | Lane Closure | Litter Clearance | Not set | Not set |
A3 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200-0500hrs lane 1 closure, southbound routine maintenance. | Boundary to Painshill | Lane Closure | Litter Clearance | Not set | Not set |
A1M | 01 Sep 2015 22:00 | 04 Sep 2015 05:00 | 22:00 to 05:30 Full Carriageway Closure; northbound for Gantry Lift. Diversion from J4 via A6129/B197/A1000 to rejoin A1M via Jct 6 Northbound entry slip | Jn 4 to Jn 6 | Carriageway Closure | Structure - New/Reconstruction | Not set | Not set |
M1 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 closure, northbound for drainage surveys | Jn 6 to Jn 6a | Lane Closure | Drainage | Not set | Not set |
A1M | 01 Sep 2015 22:00 | 04 Sep 2015 05:00 | 22:00 to 05:00 Full Carriageway Closure, Northbound for gantry lift. Diversion from Jct 4 via A6129/B197/A1000 to rejoin at Jct 6 | A1M Northbound J4 On-slip | Carriageway Closure | Structure - New/Reconstruction | Not set | Not set |
A1M | 01 Sep 2015 22:00 | 03 Sep 2015 05:00 | 22:00 to 05:00, Slip Road Closure southbound for New Superspan ganty installation. Diversion via A1000 / B197 / A6129 to rejoin at Jct 4 | Jct 6 Southbound entry slip | Carriageway Closure | Construction - Bridge/Structure | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 closure, clockwise for cat 1 barrier repairs | Jn 8 to Jn 9 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:30 | 2200-0530, lane 4,3,2 closure, clockwise for resurfacing works | Jn 14 to Jn 15 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:30 | 2200-0500 hrs, Lane 1+2+3 closure, anti-clockwise for VMS renewls | Jn 16 to Jn 15 | Lane Closure | Signs - Erection | Not set | Not set |
A3 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200 - 0500hrs, Exit slip road closure, southbound for routine maintenance, diversion via Painshill and return. | Esher exit slip (MP 5/1) | Carriageway Closure | Litter Clearance | Not set | Not set |
A3 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200 - 0500hrs, Entry slip road closure, southbound for routine maintenance, diversion via Tolworth and return.HA_DR49 | Esher Entry Slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 01 Oct 2015 05:30 | 2130-0530hrs, full entry slip road closure, clockwise for Maurer joint replacemnt scheme. Diversion to M25 junction 18 and return. | Jct 20 clockwise entry slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A1M | 01 Sep 2015 22:00 | 04 Sep 2015 05:00 | 22:00 to 05:00; Northbound entry slip Closure for Gantry Lift. Diversion from J4 via B197/A1000/B197 to Jct 6 | Jct 5 northbound entry slip | Carriageway Closure | Structure - New/Reconstruction | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 22:00-05:00hrs M40 Eastbound link to M25 Anticlockwise closure for safety fence repairs diversion to jct 1 Denham Roundabout and return | M40 Eastbound to M25 Anti-Clockwise Link | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 2200-0500 hrs,link road closure, clockwise for drainage works. Diversion via Jct 21A, A405 Southbound to M1 Northbound at Jct 6 | M25 Clockwise link to M1 Northbound | Carriageway Closure | Drainage | Not set | Not set |
M25 | 01 Sep 2015 22:00 | 02 Sep 2015 05:00 | 22:00-05:00hrs M40 Eastbound to M25 Clockwise Link closure for safety fence repairs with diversion to jct 1 M40 and return | M40 Eastbound link to M25 Clockwise | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A3 | 02 Sep 2015 10:32 | 02 Sep 2015 11:38 | RTC | Jn M25 to Jn B2039 | Lane Closure | Road Traffic Collision | Not set | Not set |
A1 | 02 Sep 2015 21:14 | 02 Sep 2015 22:30 | RTC - car left c\way | Jn A5135 to Jn M25 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 22;00 to 05:00 lane 1,2 & 3 closure for routine maintenance and white lining defects | Jn 15 to Jn 17 | Lane Closure | Sweeping of Carriageway | Not set | Not set |
M25 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 2200 - 0500hrs, lane 3 and 4 closure, clockwise for scheduled routine maintenance | Jn 25 to Jn 26 (Please set NINA signs at MP 146/9) | Lane Closure | Sweeping of Carriageway | Not set | Not set |
M1 | 02 Sep 2015 22:00 | 05 Sep 2015 05:00 | 2200-0500hrs, Lane 1 and 2 closure Northbound, for safety fence repairs | Jn 5 to Jn 6 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A1M | 02 Sep 2015 22:00 | 04 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 closure southbound for safety fence repairs | Jn 4 to Jn 3 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A3 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 2200 - 0500hrs, lane 1 closure, northbound for routine maintenance. | Painshill to Boundary | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 22:00-05:00 hrs, Lane 1-2-3 closure anti-clockwise for emergency electrical works | Jn 11 to Jn 10 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 02 Sep 2015 22:00 | 03 Sep 2015 05:30 | 2200-0530hrs L4/3 then L1/2 closure anticlockwise for VMS renewals | Jn 16 to Jn 15 | Lane Closure | Signs - Maintenance | Not set | Not set |
A3 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 2200 - 0500hrs, Exit slip road closure, northbound for routine maintenance, diversion via Tolworth and return. HA_DR50 | Esher Exit Slip (MP 6/3) | Carriageway Closure | Litter Clearance | Not set | Not set |
A3 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 2200 - 0500hrs, Entry slip road closure, northbound for routine maintenance, diversion via Painshill and return | Esher Entry Slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 2200-0500hrs, link road closure clockwise, for routine maintenance. Diversion via Jct 17 and return | M25 Clockwise to M40 Westbound Link Road (MP 101/4) | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 02 Sep 2015 22:00 | 03 Sep 2015 05:00 | 2200-0500hrs, link road closure clockwise, for routine maintenance. Diversion via Jct 17 and return | M25 Clockwise to M40 Eastbound link (MP 102/2) | Carriageway Closure | Litter Clearance | Not set | Not set |
A40 | 02 Sep 2015 22:00 | 25 Sep 2015 05:30 | 2200-0530 hrs, Lane 1 and 2 closure, Westbound for VMS Renewals | Jn Swakeleys to Jn Denham | Lane Closure | Signs - Maintenance | Not set | Not set |
M25 | 03 Sep 2015 09:03 | 03 Sep 2015 10:23 | RTC | Jn 24 to Jn 23 | Lane Closure | Road Traffic Collision | Not set | Not set |
M1 | 03 Sep 2015 09:30 | 04 Sep 2015 16:00 | 09:30-16:00hrs Hard Shoulder closure Northbound for sign vision clearance works | Jn 2 to Jn MSA | Lane Closure | Horticulture (Cutting and Planting) | Not set | Not set |
M25 | 03 Sep 2015 17:27 | 03 Sep 2015 17:48 | RTC - vehicle vs M/C | Jn 16 to Jn 15/Jn 15 to Jn 16 | Lane Closure | Road Traffic Collision | Not set | Not set |
M4 | 03 Sep 2015 22:00 | 23 Sep 2015 05:30 | 2200-0530hrs, Lane 1/2 closure eastbound, for VMS renewals | Jn 4B to Jn 3 | Lane Closure | Signs - Maintenance | Not set | Not set |
A1M | 03 Sep 2015 22:00 | 04 Sep 2015 05:00 | 22:00 to 05:00hrs Lane1,2 closure southbound for urgent gantry construction works. | Jn 6 to Jn 4 | Lane Closure | Structure - New/Reconstruction | Not set | Not set |
A1M | 03 Sep 2015 22:00 | 04 Sep 2015 05:00 | 22:00 to 05:00; Lane 1 closure southbound for urgent gantry construction works. | Jct 6 Southbound entry slip | Lane Closure | Structure - New/Reconstruction | Not set | Not set |
A3 | 03 Sep 2015 22:00 | 04 Sep 2015 05:00 | 2200 - 0500hrs, lane 1 closure, southbound for routine maintenance. | Esher to Wisley | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 03 Sep 2015 22:00 | 04 Sep 2015 05:30 | 2200-0530, lane 1 closure, clockwise exit slip for resurfacing works | Jct 14 exit slip | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 03 Sep 2015 22:00 | 04 Sep 2015 05:30 | 2200-0530, link road closure, clockwise for resurfacing works. Diversion via jnc 14 roundabout | M25 clockwise jnc 14 T5 slip road | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 03 Sep 2015 22:00 | 04 Sep 2015 05:00 | 2200 - 0500hrs, Exit slip road closure, southbound for routine maintenance, diversion via Wisley and return | Painshill Exit Slip (MP 10/0) | Carriageway Closure | Litter Clearance | Not set | Not set |
A3 | 03 Sep 2015 22:00 | 04 Sep 2015 05:00 | 2200 - 0500hrs, Entry slip road closure, southbound for routine maintenance, diversion via Esher | Painshill Entry Slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M1 | 03 Sep 2015 22:00 | 04 Sep 2015 05:00 | 22:00-05:00hrs Jct MSA Northbound Entry slip closure for CAT 1 Litter clearance and sign works. Diversion to Jct 1 and return HA_DR19 | Jct MSA Northbound entry slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 04 Sep 2015 11:59 | 04 Sep 2015 14:17 | Lane 1 of 2 on slip road closed for car fire | M25 J25 A track exit slip | Lane Closure | Other | Not set | Not set |
M25 | 04 Sep 2015 17:50 | 04 Sep 2015 19:41 | Broken down vehical | Jn 12 to Jn 13 | Lane Closure | Other | Not set | Not set |
M25 | 04 Sep 2015 23:00 | 05 Sep 2015 05:00 | 23:00-05:00hrs entry slip closure clockwise with for safety fence repairs.Diversion to Jct 17 and return | Jct 18 Clockwise Entry slip | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A1M | 04 Sep 2015 23:00 | 05 Sep 2015 05:00 | 22:00 to 05:00hrs Lane 1, 2 closure northbound for urgent gantry construction works. | A1M Jn 5 to Jn 6 | Lane Closure | Structure - New/Reconstruction | Not set | Not set |
M25 | 04 Sep 2015 23:00 | 19 Sep 2015 06:00 | 22:00-05:30 hrs, Lane 1-2 closure, clockwise for pavement works | Jn 10 to Jn 11 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 04 Sep 2015 23:00 | 19 Sep 2015 06:00 | 22:00-05:30 hrs, Entry slip road closure, clockwise for pavement works. Diversion to Jct 9 | Junction 10 entry slip road | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M1 | 04 Sep 2015 23:00 | 05 Sep 2015 05:00 | 23:00hrs - 05:00hrs Southbound Exit Slip Closure for CAT 1 Barrier repairs. HA_DR61 Diversion via Jct 1, A406,A1 HA_DR61 | Jct 2 Southbound Exit Slip | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 05 Sep 2015 13:30 | 05 Sep 2015 16:18 | BDV | BDV in Lane 2 | Lane Closure | Other | Not set | Not set |
M25 | 05 Sep 2015 21:00 | 06 Sep 2015 09:00 | 2100-0900hrs, Carriageway closure, clockwise for maurier joint replacement. Diversion to Jct 21a via Jct 19, A41 Hunton Bridge, and A405. | Jn 19 to Jn 21A | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 05 Sep 2015 21:00 | 06 Sep 2015 09:00 | 2100-0900hrs, Entry slip road closure clockwise for maurier joint replacement. Diversion via A41 Hunton Bridge, A405 to Jct 21a. | Jct 20 Clockwise entry slip. | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 05 Sep 2015 22:00 | 13 Sep 2015 06:00 | 2200-0530 hrs, Lane 123 or Lane 432 closure, anti clockwise for carriageway repairs | Jn 10 to Jn 9 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 05 Sep 2015 22:00 | 13 Sep 2015 06:00 | 2200-0530 hrs, entry slip road closure anticlockwise for carriageway fine milling works. Diversion to Junction 11 and return | Jct 10 Anticlockwise entry slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 05 Sep 2015 22:00 | 06 Sep 2015 06:00 | 2200-0500hrs, Entry Slip Closure, Anticlockwise for Structure New/Reconstruction. Diversion via A3 Oxshott entry slip | Eastbound A3 Entry Slip From A244 Copsem Lane | Carriageway Closure | Structure - New/Reconstruction | Not set | Not set |
A3 | 05 Sep 2015 22:00 | 06 Sep 2015 06:00 | 2200-0500hrs, Exit Slip Closure Anticlockwise for Structure New/ Reconstruction. Diversion via A3 Oxshott entry slip | A3 Exit Slip (MP 6/1) Hook Junction & A244 | Carriageway Closure | Structure - New/Reconstruction | Not set | Not set |
M3 | 06 Sep 2015 21:06 | 06 Sep 2015 21:45 | R T C | Jn 2 to Jn 1 | Lane Closure | Road Traffic Collision | Not set | Not set |
A3 | 06 Sep 2015 22:30 | 07 Sep 2015 05:30 | 2200-0500hrs, Entry Slip Closure, Anticlockwise for Structure New/Reconstruction. Diversion to oxshott entry slip | Eastbound A3 Entry Slip From A244 Copsem Lane | Carriageway Closure | Structure - New/Reconstruction | Not set | Not set |
M25 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 22:00-05:00hrs Lane 1,2,3 closure clockwise for patching repairs | Jn 16 to Jn 17 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 2200 to 0500hrs, lane 1 and 2 closure, southbound for routine maintenance. | Painshill to Ockham | Lane Closure | Litter Clearance | Not set | Not set |
M1 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 2200-0500hrs, Lane 3 and 2 closure southbound, for safety fence repairs | Jn 5 to Jn MSA | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A1M | 07 Sep 2015 22:00 | 09 Sep 2015 05:00 | 22:00-05:00hrs lane 3 and 2 closure Northbound for safety fence repairs | Jn 3 to Jn 4 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 2200-0500 hrs, Lane 1/2 closure, clockwise for urgent barrier works | Jn 14 to Jn 15 | Lane Closure | Barriers - Permanent | Not set | Not set |
A3 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 2200 - 0500hrs, Exit slip road closure, southbound for routine maintenance, diversion via Ockham. | Wisely Exit Slip (MP 12/1) | Carriageway Closure | Litter Clearance | Not set | Not set |
A3 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 2200 - 0500hrs, Entry slip road closure, southbound for routine maintenance, diversion via Painshill | Wisely Entry Slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 07 Sep 2015 22:00 | 08 Sep 2015 05:30 | 2200-0530, slip road closure, M40 westbound to M25 clockwise & anticlockwise for resurfacing works. Diversion via M40 jnc 2 | M40 Westbound to M25 Clockwise & anticlockwise link roads | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 07 Sep 2015 22:00 | 08 Sep 2015 05:30 | 2200-0530 hrs, link road closure, m40 esatbound to M25 clockwise for resurfacing works. Diversion via jnc 14 | M40 Eastbound to M25 Clockwise link road | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A1M | 07 Sep 2015 22:00 | 09 Sep 2015 05:00 | 2200-0500hrs, Lane 1 closure Northbound, as safety lane for safety fence repairs | Jct 3 Entry slip | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 2200-0500 hrs, Total Slip closure clockwise, for cat 1 barrier repairs. Division via M25 to M4 j5 westbound and return M4 eastbound | M25 Clockwise to M4 Eastbound link | Carriageway Closure | Barriers - Permanent | Not set | Not set |
M25 | 07 Sep 2015 22:00 | 09 Sep 2015 05:00 | 22:00hrs - 05:00hrs, Lane 1 Closure Anticlockwise for Barrier Works | M40 Eastbound to M25 Anticlockwise Link Road | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 07 Sep 2015 22:00 | 08 Sep 2015 05:00 | 2200-0500hrs, lane 1 closure southbound, for safety lane for cyclic works | M11 southbound to M25 anti-clockwise link | Lane Closure | Litter Clearance | Not set | Not set |
M1 | 08 Sep 2015 09:30 | 08 Sep 2015 16:00 | 0930-1600hrs, Hard shoulder closure Northbound, for sign vision clearance works | A406 Anticlockwise to Jct 2 | Lane Closure | Horticulture (Cutting and Planting) | Not set | Not set |
M25 | 08 Sep 2015 13:43 | 08 Sep 2015 14:46 | RTC - car facing wrong way blocking lane 1, no HS where incident occured, lanes 2, 3 and 4 running past scene | Jn 9 to Jn 10 | Lane Closure | Road Traffic Collision | Not set | Not set |
M3 | 08 Sep 2015 21:00 | 24 Sep 2015 05:30 | 2200-0530hrs, total closure southbound between slips, for resurfacing and traffic swiching to upgrade to smart motorway. Diversion to junction 13 of the M25 onto the A30 and back on the M3 at junction 3 | Jn 1 to Jn 2 | Carriageway Closure | Electrical Works | Not set | Not set |
M3 | 08 Sep 2015 21:00 | 24 Sep 2015 05:30 | 21:00hrs to 05:30hrs link road closure clockwise for resurfacing, traffic switch, improvement works and upgrade to Smart motorways. Diversion to jct 13 down the A30 and onto the M3 at jct 3 | M25 Clockwise to M3 southbound link road | Carriageway Closure | Construction - Improvement/Upgrading | Not set | Not set |
M3 | 08 Sep 2015 21:00 | 24 Sep 2015 05:30 | 2100-0530hrs,total closure anticlockwise, for resurfacing and traffic switches to upgrade to Smart motorway. Diversion to juction 11 along to juction 13 and down the A30 back on the M3 at junction 3 of the m3 | M25 Anticlockwise to M3 Southbound link road | Carriageway Closure | Electrical Works | Not set | Not set |
M25 | 08 Sep 2015 22:00 | 09 Sep 2015 05:00 | 2200-0500 hrs, lane 4,3 closure, anti-clockwise for electrical works | Jn 19 to Jn 18 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 08 Sep 2015 22:00 | 09 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 and 2 closure Anti-clockwise for CAT 1 safety fence repairs | Jn 23 to Jn 21A | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 08 Sep 2015 22:00 | 09 Sep 2015 05:00 | 22:00-05:00hrs Lane 3 and 2 closure Northbound for patching works | Jn 1 to Jn MSA | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 08 Sep 2015 22:00 | 09 Sep 2015 05:00 | 2200 - 0500hrs, lane 1 and 2 closure, northbound for routine maintenance | Ockham to Painshill | Lane Closure | Litter Clearance | Not set | Not set |
M1 | 08 Sep 2015 22:00 | 09 Sep 2015 05:00 | 2200-0500hrs, Lane 1 closure, Southbound for electrical works | Jn 5 to Jn 4 | Lane Closure | Electrical Works | Not set | Not set |
M1 | 08 Sep 2015 22:00 | 10 Sep 2015 05:30 | 22:00hrs to 05:30hrs, Lane 3 and 2 or Lane 1 and 2 closure northbound for gantry inspection | Jn 5 to Jn 6A | Lane Closure | Inspection/Survey | Not set | Not set |
M25 | 08 Sep 2015 22:00 | 25 Sep 2015 05:30 | 2200-0530 hrs, Lane 1,2 closure anticlockwise for carriageway fine milling works. | Jn 10 to Jn 9 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 08 Sep 2015 22:00 | 09 Sep 2015 05:00 | 2200 - 0500hrs, slip road closure, northbound for routine maintenance, diversion via Painshill and return | Wisley exit slip (MP 13/7) | Carriageway Closure | Litter Clearance | Not set | Not set |
M1 | 08 Sep 2015 22:00 | 09 Sep 2015 05:00 | 2200-0500hrs, Lane 1 closure southbound slip, for electrical works | Jct 4 Southbound Exit Slip | Lane Closure | Electrical Works | Not set | Not set |
M25 | 08 Sep 2015 22:30 | 09 Sep 2015 05:30 | 2230-0500hrs, Lane 1 closure on anticlockwise link to M40 westbound, for Cat 1 barrier repair | M25 anticlockwise link road to M40 west bound | Lane Closure | Barriers - Permanent | Not set | Not set |
M25 | 08 Sep 2015 23:59 | 09 Sep 2015 05:30 | 22:00hrs to 05:30hrs, link road closure clockwise for gantry inspection. Diversion to Jct 22 and return | M25 Clockwise Link Road to M1 Northbound | Carriageway Closure | Inspection/Survey | Not set | Not set |
M1 | 09 Sep 2015 09:30 | 09 Sep 2015 16:00 | 0930-1600hrs, Hard Shoulder closure Northbound, for sign vision clearance works | Jn 1 to Jn 2 | Lane Closure | Horticulture (Cutting and Planting) | Not set | Not set |
M25 | 09 Sep 2015 21:51 | 09 Sep 2015 23:42 | Lane 1 closure for BDV | Jn 8 to Jn 8 | Lane Closure | Other | Not set | Not set |
M25 | 09 Sep 2015 22:00 | 10 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 and 2 closure Anticlockwise for patching works after car fire | Jn 22 to Jn 21A | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M1 | 09 Sep 2015 22:00 | 10 Sep 2015 05:00 | 22:00-05:00hrs, Lane 1 Closure southbound for electrical works | Jn 4 to Jn 2 | Lane Closure | Electrical Works | Not set | Not set |
A1M | 09 Sep 2015 22:00 | 12 Sep 2015 05:00 | 22:00 to 05:00hrs Lane 1,2 closure southbound, for urgent gantry construction works. | Jn 6 to Jn 4 | Lane Closure | Structure - New/Reconstruction | Not set | Not set |
A1M | 09 Sep 2015 22:00 | 12 Sep 2015 05:00 | 2200-0500hrs, HS and L1 southbound, for urgent gantry construction works | Jct 6 on slip | Lane Closure | Structure - New/Reconstruction | Not set | Not set |
M25 | 09 Sep 2015 22:00 | 21 Oct 2015 05:30 | 2200-0530 hrs, lane 1,2,3 or 4,3,2 anticlockwise for fine milling works | Jn 10 to Jn 9 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 09 Sep 2015 22:00 | 10 Sep 2015 05:00 | 2200 - 0500hrs, lane 1 and 2 closure, clockwise for routine maintenance. | Jn 9 to Jn 11 | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 09 Sep 2015 22:00 | 10 Sep 2015 05:00 | 2200 - 0500hrs, Exit slip road closure, clockwise for routine maintenance, diversion via Jct 11 and return | Jct 10 Exit Slip (MP 70/6) | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 09 Sep 2015 22:00 | 10 Sep 2015 05:00 | 2200 - 0500hrs, Entry slip road closure, clockwise for routine maintenance, diversion via Jct 9 and return | Jct 10 Entry Slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M1 | 09 Sep 2015 22:00 | 10 Sep 2015 05:00 | 2200-0500 hrs, slip road closure, southbound for electrical works 2200-0500hrs, slip road closure, anti-clockwise for electrical works Diversion Via M1 southbound to Junction 1 and return on M1 northbound to Jn MSA HA_DR17 | Jn MSA Southbound exit slip | Carriageway Closure | Electrical Works | Not set | Not set |
M1 | 10 Sep 2015 09:30 | 11 Sep 2015 16:00 | 09:30-16:00hrs Hard shoulder closure Northbound for sign vision clearance works | Jn 2 to Jn MSA | Lane Closure | Horticulture (Cutting and Planting) | Not set | Not set |
M25 | 10 Sep 2015 09:30 | 17 Sep 2015 16:00 | 0930-1600hrs, Hard shoulder closure, closckwise for technology works | M25 Clockwise Jct 15 - Jct 16 | Lane Closure | Communications | Not set | Not set |
M25 | 10 Sep 2015 12:15 | 10 Sep 2015 14:22 | BDV | Jn 9 to Jn 10 | Lane Closure | Other | Not set | Not set |
M25 | 10 Sep 2015 20:07 | 10 Sep 2015 21:03 | lane 1 closure for tanker sunk in french drain, lanes 2, 3 and 4 running past scene | Jn 22 to Jn 21A | Lane Closure | Other | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 2200-0500 hrs, Lane 4,3,2 closure with switch 3,2,1, anti-clockwise for electrical works | Jn 19 to Jn 17 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 and 2 closure Anticlockwise for patching works after car fire | Jn 22 to Jn 21A | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M4 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 2200-0500 hrs, Lane 3 2 closure, westbound for cat 1 barrier repairs | Jn 2 to Jn 3 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 22:00-05:00hrs Lane 3 and 2 closure Southbound for safety fence repairs | Jn 4 to Jn 2 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 22:00-05:00hrs lane 3 and 2 closure southbound for safety fence repairs | Jn 6A to Jn 5 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 16 Oct 2015 05:30 | 2200-0530hrs, Lane 1,2,3 or 4,3,2 closure, anticlockwise for fine milling works | Jn 10 to Jn 9 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 12 Sep 2015 06:00 | 2200-0500hrs, Cobham MSA anti-clockwise closure, for loop repairs. Diversion via M25 clockwise to Jnc 10 and return | Cobham MSA Anti-Clockwise Entry Slip | Carriageway Closure | Electrical Works | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 23:00-06:00 hrs, Lane 4-3-2 closure, switching to 1-2-3 closure anti-clockwise for emergency electrical works. | Jn 10 to Jn 9 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 2200-0500 hrs, Lane 2 closure westbound for cat 1 barrier works | T5 Spur to Jn M25 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 2200-0500hrs link road closure clockwise for cat 1 barrier repairs. Division to M4 Jct 4 and return | Jct 14 exit to T5 Rbt | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 10 Sep 2015 22:00 | 11 Sep 2015 05:00 | 2200-0500 hrs, Lane 2 closure anti-clockwise for barrier repairs | M25 Anticlockwise link to T5 Spur | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A3 | 11 Sep 2015 00:08 | 11 Sep 2015 00:32 | RTC | Jn A245 to Jn A244 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 11 Sep 2015 11:50 | 11 Sep 2015 12:15 | M25 J14 MP 91/6 A C/W BDV | Jn 14 to Jn 14 | Lane Closure | Other | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 22:00-05:00hrs Lane 1,2,3 closure Anti clockwise for patching works | Jn 17 to Jn 16 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 2300 - 0500hrs, lane 1 closure, southbound for routine maintenance | Wisley to Ockham (MP 14/6 to MP 15/2) | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 2300hrs - 0500hrs, lanes 1,2 closure, clockwise, for road repairs | Jn 24 to Jn 25 please set NINA signs for 144.3 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M1 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 23:00-05:00hrs Lane 1 closure southbound for safety fence repairs | Jn 6A to Jn 5 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 2300-0500 hrs, Lane 4 3 closure, anti-clockwise for cat 1 barrier repairs | Jn 8 to Jn 7 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 2300-0500 hrs, Lane 1,2,3 closure, clockwise for electrical works | Jn 9 to Jn 10 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 12 Sep 2015 06:00 | 23:00-06:00, lane 1-2-3 closure anti-clockwise for emergency electrical works. | Jn 10 to Jn 9 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 13 Sep 2015 05:00 | 2200-0500 hrs, Lanes 4 & 3 closure, clockwise for drainage works | Jn 14 to Jn 16 (MP 92/1 to MP97/8) | Lane Closure | Drainage | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 13 Sep 2015 05:00 | 2200-0500 hrs, Lanes 4 & 3 closure, anti-clockwise for drainage works | Jn 16 to Jn 14 (MP98/2 to MP93/9) | Lane Closure | Drainage | Not set | Not set |
A3 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 2300 - 0500hrs, Exit slip road closure, southbound for routine maintenance, diversion via Burpham/A3100 and B2215 | Ockham Exit Slip (MP 14/4) | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 11 Sep 2015 23:00 | 12 Sep 2015 05:00 | 2300hrs - 0500hrs exit slip closure, clockwise, for road repairs, diversion to Jct 26 and return | Jct 25 clockwise exit slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 12 Sep 2015 05:43 | 12 Sep 2015 10:57 | RTC - Lane 1 closed | Jn 8 to Jn 9 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 12 Sep 2015 10:54 | 12 Sep 2015 11:46 | Oil spill from RTC - L3 & L4 closed | Jn 10 to Jn 11 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 12 Sep 2015 21:46 | 12 Sep 2015 23:08 | M25 A C/W Junc 23 Entry slip BDV L1 closed | Jn 23 to Jn 23 | Lane Closure | Other | Not set | Not set |
M25 | 12 Sep 2015 22:00 | 13 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 closure clockwise for safety fence repairs | Jn 20 to Jn 21 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 13 Sep 2015 01:28 | 13 Sep 2015 03:27 | M25 J25-J24 B C/W MP 139/5 RTC, L1 closed | Jn 25 to Jn 24 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 13 Sep 2015 09:03 | 13 Sep 2015 09:22 | BDV - lane 1 for a tyre change | Jn 10 to Jn 11 | Lane Closure | Other | Not set | Not set |
M25 | 13 Sep 2015 12:23 | 13 Sep 2015 13:15 | rtc | Jn 8 to Jn 7 | Lane Closure | Road Traffic Collision | Not set | Not set |
A1M | 13 Sep 2015 22:30 | 14 Sep 2015 05:00 | 22:30-05:00hrs Lane 3 and 2 closure Southbound for safety fence repairs | Jn 4 to Jn 3 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 14 Sep 2015 22:00 | 15 Sep 2015 05:00 | 22:00-05:00hrs Lane 3 and 2 closure Southbound for safety fence repairs | Jn 5 to Jn MSA | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M4 | 14 Sep 2015 22:00 | 25 Sep 2015 05:30 | 2200-0530hrs Lane 1/2 closure Westbound, for VMS renewals | Jn 3 to Jn 4B | Lane Closure | Signs - Maintenance | Not set | Not set |
M3 | 14 Sep 2015 22:00 | 15 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 closure, westbound for cat 1 barrier repars | Jn 1 to Jn 2 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 14 Sep 2015 22:00 | 15 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 closure, clockwise for drainage works | Jn 12 to Jn 13 | Lane Closure | Drainage | Not set | Not set |
A3 | 14 Sep 2015 22:00 | 15 Sep 2015 05:00 | 2200 - 0500hrs, lane 2 and 3 closure, southbound for litter clearance | Boundary to Painshill (Boundary to MP 4/5) | Lane Closure | Litter Clearance | Not set | Not set |
A3 | 14 Sep 2015 22:00 | 15 Sep 2015 05:00 | 2200 - 0500hrs, lane 2 and 3 closure, northbound for litter clearance | Painshill to Boundary (4/5 to Boundary) | Lane Closure | Litter Clearance | Not set | Not set |
M4 | 14 Sep 2015 22:00 | 16 Sep 2015 05:00 | 2200-0500, Lane 1 closure, Southbound for survey works | M4 Spur, Southbound | Lane Closure | Inspection/Survey | Not set | Not set |
M4 | 14 Sep 2015 22:00 | 16 Sep 2015 05:00 | 2200-0500, Lane 3 closure, Northbound for survey works | M4 Spur Northbound | Lane Closure | Inspection/Survey | Not set | Not set |
M1 | 14 Sep 2015 22:00 | 15 Sep 2015 05:00 | 22:00-05:00hrs Total closure of M1 North jct 1 Elevated Entry slip with diversion around Rbt and rejoin M1 North via lower Entry slip for patching works | M1 Northbound Jct 1 Entry slip from A406 Westbound | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 15 Sep 2015 07:28 | 15 Sep 2015 09:02 | 2 Vehicle RTC lanes 3-4 | Jn 16 to Jn 17 | Lane Closure | Other | Not set | Not set |
M25 | 15 Sep 2015 19:30 | 15 Sep 2015 20:45 | single veh RTC lane 2 of link road closed | M25B to M1A | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 15 Sep 2015 20:16 | 15 Sep 2015 21:16 | Single veh RTC- with Lane 1 & 2 closure. | Jn 21A to Jn 22 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 15 Sep 2015 22:00 | 16 Sep 2015 05:00 | 2200-0500 hrs, Lane 1,2 closure, anti-clockwise for electrical works | Jn 21 to Jn 20 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 15 Sep 2015 22:00 | 16 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 and 2 closure clockwise for safety fence repairs | Jn 22 to Jn 23 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 15 Sep 2015 22:00 | 16 Sep 2015 05:00 | 2200hrs - 0500hrs, lanes 1,2 closure, anti-clockwise, for cat 1 barrier repairs | Jn 24 to Jn 23 please set NINA signs for 136.7 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 15 Sep 2015 22:00 | 16 Sep 2015 05:00 | 2200hrs - 0500hrs, lanes 1,2 closure, anti-clockwise, for barrier repair | Jn 25 to Jn 24 please set NINA Signs for 145/9 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A3 | 15 Sep 2015 22:00 | 16 Sep 2015 05:00 | 2200 - 0500hrs, 2 and 3 closure, southbound for litter clearance | Esher to Painshill | Lane Closure | Litter Clearance | Not set | Not set |
A3 | 15 Sep 2015 22:00 | 16 Sep 2015 05:00 | 2200 - 0500hrs, lane 2 and 3 closure, northbound for litter clearance | Painshill to Boundary | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 15 Sep 2015 22:00 | 16 Sep 2015 05:00 | 22:00-05:00 Total closure Jct 22 Clockwise entry slip with diversion to Jct 21a and rtn m25 clockwise for safety fence repairs | M25 Clockwise Jct 22 Entry slip | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 16 Sep 2015 09:30 | 16 Sep 2015 16:00 | 0930-1600 hrs, hardshoulder closure, northbound for vms renewal | Jct 5 to 6 | Lane Closure | Signs - Maintenance | Not set | Not set |
M25 | 16 Sep 2015 18:46 | 16 Sep 2015 19:11 | Collapsed Manhole cover lane 1 | Jn 9 to Jn 10 | Lane Closure | Other | Not set | Not set |
M25 | 16 Sep 2015 22:00 | 17 Sep 2015 05:00 | 2200-0500hrs, Lane 1,2,3 closure Clockwise, for patching works | Jn 16 to Jn 17 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 16 Sep 2015 22:00 | 17 Sep 2015 05:00 | 2200 - 0500hrs, lane 2 and 3 closure, northbound for litter clearance | Wisley to Esher | Lane Closure | Litter Clearance | Not set | Not set |
M4 | 16 Sep 2015 22:00 | 10 Oct 2015 06:00 | 2200-0530,hrs, Lane 1 or 2 Closure, East Bound for Structure Works | Junction 2 Exit slip | Lane Closure | Construction - Bridge/Structure | Not set | Not set |
A3 | 16 Sep 2015 22:00 | 17 Sep 2015 05:00 | 2200 - 0500hrs, lane 2 and 3 closure, southbound for litter clearance | Esher to Wisley | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 16 Sep 2015 22:00 | 19 Sep 2015 05:00 | 22:00 - 05:00 carriageway closure anticlockwise,for barrier works. M40 DBFO approved diversion 3443460 to M40 Junction 2 and return, then use the M40 Eastbound to M25 Anticlockwise Link road | M40 Westbound link to M25 Anticlockwise | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 17 Sep 2015 09:30 | 18 Sep 2015 16:00 | 0930-1600hrs, Hard shoulder closure south bound, for cat 1 boundary fence repairs | Jn 5 to Jn 4 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 17 Sep 2015 13:53 | 17 Sep 2015 14:13 | RTC | Jn 7 to Jn 7 | Lane Closure | Road Traffic Collision | Not set | Not set |
A1 | 17 Sep 2015 21:00 | 19 Sep 2015 06:00 | 2100-0600 hrs, Total Closure Northbound, for VMS renewal, Diversion Rowley Lane to J23 | Sterling corner to Jct 1 | Carriageway Closure | Signs - Maintenance | Not set | Not set |
A3 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200 - 0500hrs, lane 3 closure, northbound for litter clearance | Ockham to Painshill (MP 15/5 to MP 10/8) | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200-0500 hrs, Lane 4,3,2 closure, anti-clockwise for electrical works | Jn 22 to Jn 21A | Lane Closure | Electrical Works | Not set | Not set |
M25 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 2 closure, clockwise for cat 1 barrier repairs | Jn 8 to Jn 9 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200 - 0500hrs, lane 2, 3 and 4 closure switch to lane 1, 2 and 3 closure, clockwise for carriageway repairs. | Jn 14 to Jn 16 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A3 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200 - 0500hrs, lane 2 and 3 closure, southbound for litter clearance | Painshill to Ockham (MP 10/8 to MP 15/2) | Lane Closure | Litter Clearance | Not set | Not set |
M25 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200 - 0500hrs, link road closure, eastbound for carriageway repairs, diversion via Jct 14 and return | M4 Eastbound to M25 Clockwise (MP 28/8) | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200 - 0500hrs, link road closure, westbound for carriageway repairs, diversion to Jct 14 and return | M4 Westbound to M25 Clockwise (MP 26/2) | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 22:00-05:00hrs, Total Slip Closure, southbound link for electrical works. Diversion to M25 Jct 28 and return | M11 Jct 6 Southbound Link to M25 Anti-clockwise | Carriageway Closure | Electrical Works | Not set | Not set |
A30 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 22.00 to 05.00 Lane 2 Closure Eastbound for electrical works | A30 EASTBOUND FROM JCT 13 ROUNABOUT TO CROOKED BILLET ROUNDABOUT | Lane Closure | Electrical Works | Not set | Not set |
A30 | 17 Sep 2015 22:00 | 18 Sep 2015 05:00 | 2200-0500 hrs, Lane 2 closure, westbound for electrical works | A30 WESTBOUND CROOKED BILLET RAB TO JCT 13 RAB | Lane Closure | Electrical Works | Not set | Not set |
M25 | 18 Sep 2015 05:58 | 18 Sep 2015 06:39 | Lane 1 for offside tyre change. | Jn 9 to Jn 8 | Lane Closure | Other | Not set | Not set |
M25 | 18 Sep 2015 11:11 | 18 Sep 2015 11:45 | Lane 1 closure for for fire | Jn 10 to Jn 11 | Lane Closure | Other | Not set | Not set |
M25 | 18 Sep 2015 13:08 | 18 Sep 2015 14:47 | RTC - 2 x cars blocking lane 4 | Jn 9 to Jn 10 | Lane Closure | Road Traffic Collision | Not set | Not set |
M1 | 18 Sep 2015 23:00 | 19 Sep 2015 05:00 | 2300-0500hrs, Lane 3 and 2 closure Northbound, for patching works | Jn MSA to Jn 5 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M3 | 18 Sep 2015 23:00 | 19 Sep 2015 05:00 | 2300-0500hrs, Lane 1 closure, eastbound for cat 1 barrier repairs | Jn 2 to Jn 1 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 18 Sep 2015 23:00 | 19 Sep 2015 05:00 | 2300-0500 hrs, Lane 1 closure, clockwise for cat 1 barrier repairs | Jn 8 to Jn 9 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A3 | 18 Sep 2015 23:00 | 19 Sep 2015 05:00 | 2300 - 0500hrs, lane 1 closure, northbound for litter clearance | Ockham to Wisley (15/2 to MP 14/6) | Lane Closure | Litter Clearance | Not set | Not set |
A3 | 18 Sep 2015 23:00 | 19 Sep 2015 05:00 | 23:00hrs to 05:00hrs: Entry slip road closure, northbound for litter clearance. Diversion via Forest Road, Horsley Road, Downside Road, Bridge Road and A245 to Painshill. | Ockham Entry Slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M1 | 18 Sep 2015 23:00 | 19 Sep 2015 05:00 | 2300-0500hrs, Lane 1 closure northbound, as safety lane | Jct 4 Entry slip | Lane Closure | Other | Not set | Not set |
M4 | 20 Sep 2015 11:46 | 20 Sep 2015 14:10 | RTC off network Carriageway closure req J5. | Jn 5 to Jn 5 | Carriageway Closure | Road Traffic Collision | Not set | Not set |
M1 | 20 Sep 2015 13:49 | 20 Sep 2015 13:58 | RTC - car into central reservation - lanes 2+3 closed | Jn MSA to Jn 4 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 20 Sep 2015 19:40 | 20 Sep 2015 20:41 | Lane 1 for RTC | Jn 24 to Jn 25 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 20 Sep 2015 22:30 | 21 Sep 2015 05:30 | 2200-0530hrs, lane 1 closure, anticlockwise, for surfacing works on the link road | Jn 22 to Jn 21A | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M1 | 20 Sep 2015 22:30 | 21 Sep 2015 05:00 | 2230-0500hrs, lane 1 closure Southbound, for safety fence repairs | Jn 4 to Jn MSA | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 20 Sep 2015 22:30 | 21 Sep 2015 05:30 | 2200-0530hrs, link road closure, anticlockwise for resurfacing works. Diversion via jnc 20 | M25 Anticlockwise link to M1 Northbound | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 20 Sep 2015 22:30 | 21 Sep 2015 05:30 | 2200-0530hrs, Lane 2 closure, clockwise link road for urgent resurfacing works | M25 Clockwise link to M1 Northbound | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 21 Sep 2015 09:30 | 25 Sep 2015 16:00 | 09.30-16.00hrs hardshoulder closure clockwise for camera works | Jn 21A to Jn 22 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 21 Sep 2015 14:31 | 21 Sep 2015 14:54 | Lane 1 for emergency services due to multi veh RTC | Jn 15 to Jn 14 | Lane Closure | Road Traffic Collision | Not set | Not set |
M1 | 21 Sep 2015 14:46 | 21 Sep 2015 15:23 | Lane 3 blocked by Fire brigade for single veh RTC in n/side and o/side barrier | Jn MSA to Jn MSA | Lane Closure | Road Traffic Collision | Not set | Not set |
M1 | 21 Sep 2015 21:00 | 23 Sep 2015 06:00 | 2100-0600 hrs, Lane 1+2 closure, southbound for joint works | junction 3- junction 1 | Lane Closure | Structure - Maintenance | Not set | Not set |
M1 | 21 Sep 2015 21:00 | 23 Sep 2015 06:00 | 2100-0600 hrs, Slip road closure, southbound for joing works. Diversion to A406,A41 and A1 | Junction 2 Exit slip road | Carriageway Closure | Structure - Maintenance | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:00 | 2200-0500 hrs, Lane 4,3 closure, anti-clockwise for electrical works | Jn 16 to Jn 15 | Lane Closure | Electrical Works | Not set | Not set |
A3 | 21 Sep 2015 22:00 | 24 Sep 2015 05:30 | 2200-0530 hrs, Lane 1,2 closure northbound for slip road surfacing works. | Jn M25 to Jn A245 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:00 | 22:00-05:00hrs Lane 4 and 3 closure Anticlockwise for Patching Repairs | Jn 22 to Jn 21A | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M4 | 21 Sep 2015 22:00 | 22 Sep 2015 05:30 | 2200-0500 hrs, Lane 1+2 closure switch to lane 3/2 closure, East bound for Bridge works | junction 5 - 4 | Lane Closure | Structure - Maintenance | Not set | Not set |
A1M | 21 Sep 2015 22:00 | 22 Sep 2015 05:00 | 22:00-05:00hrs Lane 2 closure Northbound for safety fence repairs | Jn 1 to Jn 3 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A1M | 21 Sep 2015 22:00 | 22 Sep 2015 05:00 | 2200-0500hrs, Lane 2 closure southbound, for safety fence repairs | Jn 3 to Jn 2 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:00 | 2200 - 0500hrs, lane 1 and 2 closure, clockwise for routine maintenance | Jn 6 to Jn 8 | Lane Closure | Sweeping of Carriageway | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 2 closure, clockwise for cat 1 Quadguard repairs | Jn 8 to Jn 9 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 01 Oct 2015 05:30 | 22:00hrs to 05:30hrs: Lane 1 and 2 closure anticlockwise for concrete bay replacements. | Jn 11 to Jn 10 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:30 | 2200-0500 hrs, Clockwise link road closure for Structural works. Diversion to M4 Jct 5 and return | M25 Clockwise link to M4 Eastbound | Carriageway Closure | Structure - Maintenance | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:30 | 2200-0530 hrs, anti-clockwise link road closure for structural works.Diversion to m4 junction 5 and return | M25 anti-clockwise link to M4 eastbound | Carriageway Closure | Structure - Maintenance | Not set | Not set |
A3 | 21 Sep 2015 22:00 | 24 Sep 2015 05:30 | 2200-0530 hrs, exit slip closure northbound for surfacing works. Diversion to Jn A244 and return | Painshill Northbound exit slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:30 | 2200-0500 hrs, 1 closure, anti-clockwise entry slip for bridge works | junction 16 - junction 15 | Lane Closure | Structure - Maintenance | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:30 | 2200-0500 hrs, Lane 3+2 closure, clockwise exit slip for bridge works | junction 14 - junction 15 | Lane Closure | Structure - Maintenance | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 22 Sep 2015 05:00 | 22:00-05:00hrs,link road closure anticlockwise for electrical works. Diversion to Jct 28 and return | M11 Southbound Link to M25 Anti-clockwise | Carriageway Closure | Electrical Works | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 01 Oct 2015 05:30 | 22:00hrs to 05:30hrs: Entry slip road closure anticlockwise for concrete bay replacements. Diversion to Jct 13 and return | Jct 11 Anticlockwise Entry slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 21 Sep 2015 22:00 | 02 Oct 2015 05:00 | 22:00 - 05:00 carriageway closure anticlockwise,for barrier works. Diversion to M25 Junction 17 and return. | M40 Westbound link to M25 Anticlockwise | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 22 Sep 2015 05:55 | 22 Sep 2015 07:05 | Lane 1,2,3, closure | Jn 8 to Jn 7 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 22 Sep 2015 09:30 | 22 Sep 2015 16:00 | 09.30 - 16.00 hrs H/S Closure for VMS Renewals. | M4 Westbound Slip Road to M25 Anticlockwise | Lane Closure | Signs - Maintenance | Not set | Not set |
M4 | 22 Sep 2015 22:00 | 26 Sep 2015 06:00 | 2200-0530hrs, Lane 1 Closure, Westbound for Strengthening works | Jn 1 to Jn 2 | Lane Closure | Construction - Bridge/Structure | Not set | Not set |
M4 | 22 Sep 2015 22:00 | 26 Sep 2015 06:00 | 2200 - 0530 Hrs, Exit Slip westbound Carriageway Closure, for structure works. Diversion Route: Follow M4 towards Junction 3 and follow A316 Parkway on the A4 Great West Road | Junction 2 Exit Slip | Carriageway Closure | Construction - Bridge/Structure | Not set | Not set |
M25 | 22 Sep 2015 22:00 | 23 Sep 2015 05:00 | 22:00-05:00hrs lane 1 and 2 closure Anti-clockwise for patching repairs | Jn 23 to Jn 21A | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M1 | 22 Sep 2015 22:00 | 23 Sep 2015 05:00 | 22:00-05:00hrs Lane 3 and 2 closure Northbound for safety fence repairs | Jn MSA to Jn 4 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 22 Sep 2015 22:00 | 23 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 closure Southbound for safety fence repairs | Jn 4 to Jn MSA | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 22 Sep 2015 22:00 | 23 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 closure, anti-clockwise for electrical works | Jn 4 to Jn 5 | Lane Closure | Electrical Works | Not set | Not set |
M1 | 22 Sep 2015 22:00 | 23 Sep 2015 05:00 | 22:00-05:00hrs, Lane 3/2 closure, southbound for electrical works | Jn 5 to Jn 4 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 22 Sep 2015 22:00 | 23 Sep 2015 05:00 | 2200 - 0500hrs, lane 1 and 2 closure, anticlockwise for scheduled routine maintenance | Jn 7 to Jn 5 | Lane Closure | Sweeping of Carriageway | Not set | Not set |
M25 | 22 Sep 2015 22:00 | 24 Sep 2015 05:30 | 2200-0530 hrs, Lane 1 & 2 closure, anti-clockwise for surfacing works | Jn 8 to Jn 7 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 22 Sep 2015 22:00 | 01 Oct 2015 05:30 | 2200-0530 hrs,anticlockwise entry slip closure for surfacing works. Diversion to Jct 9 and return | Jct 8 anticlockwise entry slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 22 Sep 2015 22:00 | 23 Sep 2015 05:00 | 22:00-05:00hrs Total closure M25 Anti-clockwise Entry slip with diversion to jct 23 and rtn for patching repairs | M25 Anticlockwise jct 22 Entry slip | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 23 Sep 2015 07:32 | 23 Sep 2015 22:00 | Veh Fire Main C/way | Jn 25 to Jn 24 | Carriageway Closure | Other | Not set | Not set |
A3 | 23 Sep 2015 08:50 | 23 Sep 2015 12:45 | Over turned lorry | Jn B2039 to Jn M25 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 23 Sep 2015 17:02 | 23 Sep 2015 18:25 | RTC | Jn 16 to Jn 17 | Lane Closure | Other | Not set | Not set |
M4 | 23 Sep 2015 19:56 | 23 Sep 2015 20:29 | single veh RTC - lane 2 | Jn 2 to Jn 1 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 and 2 closure Anticlockwise for patching repairs | Jn 19 to Jn 18 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 & Lane 2 Closure, Clockwise for Emergency Speed Camera Repairs | Jn 23 to Jn 24 | Lane Closure | Emergency Works - Unspecified | Not set | Not set |
M25 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 2200hrs - 0500hrs, lanes 1,2,3 closure, anti-clockwise, for Barrier repair and incident recovery | Jn 25 to Jn 24 Please set NINA signs for 145.9 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A1 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 closure, northbound for electrical works | Jn A5135 to Jn M25 | Lane Closure | Electrical Works | Not set | Not set |
M3 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 2200-0500hrs, Lane 1 closure, eastbound for cat 1 barrier repairs | Jn 2 to Jn 1 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 2200-0500 hrs, Lane 1 closure, clockwise for cat1 draiange works | Jn 8 to Jn 9 | Lane Closure | Drainage | Not set | Not set |
M25 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 2200-0500hrs entry Slip Closure, Clockwise for Emergency Speed Camera Repairs.Diversion to Jct 22 and return | Jct 23 clockwise entry slip | Carriageway Closure | Emergency Works - Unspecified | Not set | Not set |
M1 | 23 Sep 2015 22:00 | 24 Sep 2015 05:00 | 22:00-05:00hrs MSA Southbound Entry slip closure for Safety fence repairs. Diversion to jct 5 and return | Jct MSA Southbound Entry slip | Carriageway Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 closure clockwise for safety fence repairs | Jn 16 to Jn 16 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 22:00-05:00hrs Lane 3/2 Closure, Northbound for electrical works | Jn 4 to Jn 5 | Lane Closure | Electrical Works | Not set | Not set |
M1 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 22:00-05:00hrs, Lane 3/2 closure, southbound for electrical works | Jn 5 to Jn 4 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 2200 - 0500hrs, lane 1, 2 & 3 closure, clockwise for routine maintenance | Jn 8 to Jn 10 | Lane Closure | Sweeping of Carriageway | Not set | Not set |
M25 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 2200-0500 hrs, Lane 4 closure, clockwise for cat 1 gully crate & frame replacement | Jn 10 to Jn 11 | Lane Closure | Drainage | Not set | Not set |
M25 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 2200 - 0500hrs, slip road closure, clockwise for routine maintenance, diversion via Jct 10 | Jct 9 Exit Slip (MP 61/5) | Carriageway Closure | Sweeping of Carriageway | Not set | Not set |
M25 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 2200 - 0500hrs, slip road closure, clockwise for routine maintenance, diversion via Jct 8 and return | Jct 9 Entry Slip | Carriageway Closure | Sweeping of Carriageway | Not set | Not set |
M25 | 24 Sep 2015 22:00 | 25 Sep 2015 05:00 | 22:00-05:00hrs Link road closure clockwise for CAT 1 Safety fence repairs. Diversion to jct 17 and return | M25 Clockwise to M40 Eastbound Link | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M1 | 25 Sep 2015 09:30 | 25 Sep 2015 16:00 | 0930 - 1600 hrs, hardshoulder closure, southbound for vms renewal | Jn MSA to Jn 2 | Lane Closure | Signs - Maintenance | Not set | Not set |
M25 | 25 Sep 2015 13:10 | 25 Sep 2015 14:55 | BDV | Jn 9 to Jn 10 | Lane Closure | Other | Not set | Not set |
M25 | 25 Sep 2015 16:32 | 25 Sep 2015 18:05 | RTC - motorcyclist involved, lanes 1, 2 and 3 blocked, lane 4 running past scene | Jn 18 to Jn 19 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 22:00-05:00hrs, Lane 1 closure, Anti-clockwise, for electrical works | Jn 22 to Jn 21A | Lane Closure | Electrical Works | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 23:00-05:00hrs Lane 1 closure clockwise for safety fence repairs | Jn 22 to Jn 23 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 2300-0500 hrs, Lane 1,2 closure, anti-clockwise for CAT 1 electrical works | Jn 25 to Jn 23 | Lane Closure | Electrical Works | Not set | Not set |
M1 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 23:00-05:00hrs Lane 1 and 2 closure southbound for patching works | Jn 5 to Jn MSA | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 06:00 | 2300-0600hrs, Lane 1 & 2 Closure, Anti-clockwise for Technology Works | Jn 7 to Jn 5 | Lane Closure | Communications | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 2300-0500 hrs, Lane 4 3 2 closure,clockwise for cat 1 patching | Jn 8 to Jn 10 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 2300 - 0500hrs, lane 1, 2 and 3 closure, clockwise for carriageway repairs. | Jn 10 to Jn 11 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 2300-0500 hrs, Lane 1 2 closure, closure for cat 1 pothole repairs. | Jn 12 to Jn 13 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 25 Sep 2015 23:00 | 26 Sep 2015 05:00 | 2300-0500 hrs, Lane 1 Entry slip closure, anti-clockwise for CAT1 works | Jct 24 Anticlockwise Entry slip | Lane Closure | Electrical Works | Not set | Not set |
M25 | 26 Sep 2015 07:05 | 26 Sep 2015 08:04 | LAne 4 for RTC | Jn 9 to Jn 10 | Lane Closure | Road Traffic Collision | Not set | Not set |
M1 | 27 Sep 2015 01:00 | 27 Sep 2015 09:00 | 2200-0500 hrs, Hard shoulder closure clockwise for inspection/survey. | Jct 2 to Jct 3 | Lane Closure | Inspection/Survey | Not set | Not set |
M25 | 27 Sep 2015 13:20 | 27 Sep 2015 15:38 | Lane 1 closure for RTC | Jn 8 to Jn 7 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 27 Sep 2015 22:30 | 28 Sep 2015 05:30 | 2230-0530 hrs, lane 1 closure, for urgent resurfacing works | Jn 20 to Jn 21A | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 27 Sep 2015 22:30 | 28 Sep 2015 05:30 | 2230-0530hrs, lane 1 closure anticlockwise for resurfacing works | Jn 21A to Jn 21A | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 27 Sep 2015 22:30 | 28 Sep 2015 05:30 | 2200-0530hrs, link road closure, anticlockwise for resurfacing works. Diversion via Jct 21a, A405 South to M1 Jct 6 | M25 Anticlockwise link to M1 Northbound | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 27 Sep 2015 22:30 | 28 Sep 2015 05:30 | 2200-0530hrs, Link Road closure, clockwise for urgent resurfacing works. Diversion via Jct 21a, A405 South to M1 Jct 6 | M25 Clockwise link to M1 Northbound | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 28 Sep 2015 06:13 | 28 Sep 2015 08:17 | Multi Veh RTC Lanes 3 & 4 closed. | Jn 20 to Jn 19 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 28 Sep 2015 09:11 | 28 Sep 2015 09:56 | BDV HGV | Jn 24 to Jn 23 | Lane Closure | Other | Not set | Not set |
A1M | 28 Sep 2015 09:30 | 02 Oct 2015 16:00 | 0930 to 1600 hard shoulder closure, clockwise to carry out urgent sign and electrical works. | A1(M) J5 to J6 Northbound | Lane Closure | Communications | Not set | Not set |
M25 | 28 Sep 2015 09:30 | 02 Oct 2015 16:00 | 09.30-16.00hrs hardshoulder closure clockwise for hadce install | Jn 9 to Jn 10 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 28 Sep 2015 09:35 | 28 Sep 2015 10:08 | BDV HGV Lane 1 | Jn 25 to Jn 24 | Lane Closure | Other | Not set | Not set |
A3113 | 28 Sep 2015 11:32 | 28 Sep 2015 22:00 | Lane 3 closed due to RTC on J14 M25 Roundabout | A3113 closed at the Junction with J14 M25 roundabout | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 28 Sep 2015 22:00 | 29 Sep 2015 05:00 | 2200-0500 hrs, Lane 4,3,2 closure, clockwise for electrical works | Jn 17 to Jn 18 | Lane Closure | Electrical Works | Not set | Not set |
M25 | 28 Sep 2015 22:00 | 29 Sep 2015 05:30 | 2130-0530hrs, Lane 4 and 3 closure, anticlockwise for Maurer joint replacement | Jn 21 to Jn 20 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 28 Sep 2015 22:00 | 29 Sep 2015 05:00 | 2200-0500 hrs, Lane 1,2 closure, anti-clockwise for CAT1 electrical works | Jn 25 to Jn 24 | Lane Closure | Electrical Works | Not set | Not set |
M4 | 28 Sep 2015 22:00 | 02 Oct 2015 05:30 | 2200-0530hrs Lane 1/2 closure Westbound for VMS renewals also varioguard on hardshoulder. | Jn 3 to Jn 4B | Lane Closure | Signs - Maintenance | Not set | Not set |
A1M | 28 Sep 2015 22:00 | 29 Sep 2015 05:00 | 22:00 to 05:00hrs, lane 1 closure, northbound, for routine maintenance. | Jn 1 to Jn 3 | Lane Closure | Litter Clearance | Not set | Not set |
M1 | 28 Sep 2015 22:00 | 30 Sep 2015 05:00 | 22:00-05:00hrs Lane 1 closure southbound for safety fence repairs | Jn 6A to Jn 5 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A1M | 28 Sep 2015 22:00 | 03 Oct 2015 05:00 | 2200-0500hrs, Lane 2 and 3 closure northbound, for bridge joint repairs | Jn 5 to Jn 6 | Lane Closure | Structure - Maintenance | Not set | Not set |
M25 | 28 Sep 2015 22:00 | 30 Sep 2015 05:30 | 2200-0530 hrs, Lane 1 closure, for resurfacing works | Jn 16 to Jn 15 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A1M | 28 Sep 2015 22:00 | 29 Sep 2015 05:00 | 22:00 to 05:00hrs, slip road closure northbound, for routine maintenance. Diversion Jn 3 via A1001 and return | Jct 2 Northbound exit slip | Carriageway Closure | Litter Clearance | Not set | Not set |
M25 | 28 Sep 2015 22:00 | 30 Sep 2015 05:30 | 2200-0530, M25 anticlockwise link road closure for resurfacing works. Diversion M25 jnc 15 to 14 | M25 Junction 15 to M4 Link road | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 28 Sep 2015 22:00 | 02 Oct 2015 05:30 | 2200-0530 hrs, closure of north bound link roads for resurfacing works. Diversion to A237 roundabout | M23 north bound to M25 clockwise and anticlockwise link | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A40 | 28 Sep 2015 22:00 | 24 Oct 2015 05:30 | 2200-0530 hrs, Lane 1 and 2 closure, Westbound for VMS Renewals | Jn Swakeleys to Jn Denham | Lane Closure | Signs - Maintenance | Not set | Not set |
A3113 | 28 Sep 2015 22:00 | 29 Sep 2015 05:00 | 2200-0500 hrs, Lane 3 2 closure on roundabout for CAT 1 Barrier repairs | Jct 14 Roundabout | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 28 Sep 2015 22:00 | 29 Sep 2015 05:00 | 2200-0500 hrs, Lane 2 closure, J14 anti-clockwise exit slip for cat 1 barrier repairs | Jct 14 anti-clockwise exit slip | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A3113 | 28 Sep 2015 22:00 | 29 Sep 2015 05:00 | 2200-0500 hrs, Lane 2 closure, westbound for cat1 barrier repairs | A3113 westbound from Spout lane to M25 J14 rbt | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 29 Sep 2015 15:21 | 29 Sep 2015 17:28 | CAR FIRE | Jn 17 to Jn 17 | Carriageway Closure | Other | Not set | Not set |
A3 | 29 Sep 2015 17:44 | 29 Sep 2015 19:34 | Two vehicle RTC | Jn A245 to Jn A244 | Lane Closure | Road Traffic Collision | Not set | Not set |
M25 | 29 Sep 2015 22:00 | 30 Sep 2015 05:00 | 22:00-05:00hrs, Lane 1 closure, Anti-clockwise for electrical works | Jn 25 to Jn 24 | Lane Closure | Electrical Works | Not set | Not set |
A3 | 29 Sep 2015 22:00 | 30 Sep 2015 05:00 | 2200-0500 hrs, Lane 3 2 closure southbound for cat 1 barrier repairs | Jn A244 to Jn A245 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
A3 | 29 Sep 2015 22:00 | 30 Sep 2015 05:00 | 2200-0500 hrs, Lane 3 2 closure,northbound for cat1 barrier repairs | Jn A245 to Jn A244 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 29 Sep 2015 22:00 | 30 Sep 2015 05:00 | 22:00-05:00hrs Lane 4 and 3 Closure clockwise for cat 1 safety fence repairs | Jn 15 to Jn 16 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 29 Sep 2015 22:00 | 30 Sep 2015 05:00 | 22:00-05:00hrs, exit slip closure anti-clockwise for electrical works. Diversion to Jct 23 and return | Jct 24 Anti-clockwise Exit Slip | Carriageway Closure | Electrical Works | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 22:00-05:00hrs Lane 1 and 2 closure clockwise for safety fence repairs | Jn 15 to Jn 16 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 2200-0500 hrs, Lane 1,2,3 closure, clockwise for CAT1 electrical works | Jn 18 to Jn 19 | Lane Closure | Electrical Works | Not set | Not set |
M4 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 2200 - 0500hrs, lane 1 and 2 closure, eastbound for carriageway repairs. | Jn 4B to Jn 4 | Lane Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
A1M | 30 Sep 2015 22:00 | 03 Oct 2015 05:00 | 22:00-05:00hrs Lane 1 and 2 closure southbound for CAT 1 tree clearance works | Jn 6 to Jn 4 | Lane Closure | Horticulture (Cutting and Planting) | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 2200-0500 hrs, Lane 4 3 2 closure, anti-clockwise for cat 1 barrier and signal repairs | Jn 8 to Jn 7 | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 2200-0500hrs, hardshoulder closure, westbound for electrical works | M40 Westbound to M25 Anticlockwise link road (MP 31/6) | Lane Closure | Electrical Works | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 2200 - 0500hrs, link road closure, anticlockwise for carriageway repairs, diversion via Jct 5 and return | M25 Anticlockwise to M4 Eastbound Link (MP 96/0) | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 2200 - 0500hrs, link road closure, clockwise for carriageway repairs, diversion via Jct 5 | M25 Clockwise to M4 Eastbound (MP 94/0) | Carriageway Closure | Carriageway - Reconstruction/Repair | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 2200-0500hrs, Link road closure anticlockwise for electrical works. Diversion to M25 Jct 28 and return | M11 Northbound Link to M25 Anti-clockwise | Carriageway Closure | Electrical Works | Not set | Not set |
M25 | 30 Sep 2015 22:00 | 01 Oct 2015 05:00 | 22:00-05:00hrs Total closure M25 Clockwise to M40 Westbound link with diversion to jct 17 and rtn | M25 Clockwise to M40 Westbound link | Lane Closure | Safety Barrier/Fence Repairs | Not set | Not set |