Transparency data

Restoring Your Railway Fund: bids received

Published
Download CSV 8.53KB

Scheme Name Scheme Region Ideas Fund Round
To reinstate Glazebrook Junction to Skelton Junction The North West 1
To reinstate the Walkden to Bolton line The North West 1
To introduce an orbital passenger rail route between Stockport and Ashton The North West 1
To reinstate the Keswick to Penrith Railway The North West 1
To reinstate the Burscough Curves The North West 1
To re-double from Oldham Mumps to Grotton Greenfield The North West 1
To reinstate the Rose Hill (Marple) to Maple Grove Line, Stockport The North West 1
To reinstate the Bolton-Radcliffe and Bolton to Bury lines The North West 1
To reinstate the East Didsbury to Stockport line The North West 1
To reconnect stations in the Rossendale Valley area The North West 1
To re-double the mid-Cheshire line, Altrincham-Stockport The North West 1
To repurpose the Warrington to Stockport line The North West 1
To reinstate the Bury-Heywood-Rochdale lines The North West 1
To reintroduce passenger services between Clitheroe and Hellifield and explore freight options The North West 1
To enhance services between Morpeth and Berwick The North East 1
To reintroduce passenger services to former freight alignment to link existing Metro lines at Cobalt The North East 1
To open a new station at Gilsland-Tyne Valley Line The North East 1
To open a new station to serve the village of Belford-Northumberland The North East 1
To reinstate the Bensham Curve and freight line The North East 1
To reinstate the Leamside South of Tyne & Wearside Loop The North East 1
To reinstate the Maldon to Witham line The East 1
To reinstate the passing loop between St Albans Abbey and Watford Junction (Abbey Line) The East 1
To reinstate the line for Barnsley to Wakefield via Royston - North Midland Railway Yorkshire and Humberside 1
To operate regular local passenger services over the Doncaster-Askern line Yorkshire and Humberside 1
To reinstate the Wortley Curve Yorkshire and Humberside 1
To introduce passenger services between Sheffield and Stocksbridge on freight route Yorkshire and Humberside 1
To introduce passenger services on the Barrow Hill line between Sheffield and Chesterfield Yorkshire and Humberside 1
To re-open the Stoke-Leek line The Midlands 1
To reinstate the Peaks and Dales Railway The Midlands 1
To reinstate the rail sidings at the former Ironbridge Power Station The Midlands 1
To reinstate the Oswestry to Gobowen line (Cambrian Heritage Railways) The Midlands 1
To reinstate pax service on the currently freight only branch line between Stourbridge and Brierly Hill The Midlands 1
To re-open Pontrilas station The Midlands 1
To re-open stations on the Sutton Park line The Midlands 1
To re-open a Tettenhall area station The Midlands 1
To open a new station at Galley Common (Nuneaton) The Midlands 1
To reinstate pax services on Lichfield-Alrewas-Burton-on-Trent rail line The Midlands 1
To open new stations at Foleshill, Coundon Road & Biley/Willenhall The Midlands 1
To reinstate Etruria station The Midlands 1
To reintroduce passenger services on the Leicester to Burton (Ivanhoe) line The Midlands 1
To re-open the Meir station between Stoke-On-Trent and North Staffordshire The Midlands 1
To open new stations at Castle Bromwich and Fort Parkway The Midlands 1
To reinstate the Helston Railway Link The South West 1
To double-track majority of Thingly Junction to Bradford Junction The South West 1
To re-open Stonehouse Bristol Road The South West 1
To extend the light railway to the Barnstable Branch (Chivenor Braunton) The South West 1
To extend the Lostwithiel to Carne Point (Fowey) rail line The South West 1
To restore the Newton Abbot to Heathfield railway link The South West 1
To re-open the Tavistock-Okehampton line The South West 1
To reinstate the Cirencester-Kemble line The South West 1
To re-open the Sharpness branch line The South West 1
To restore the line to Gravity innovation campus The South West 1
To reinstate rail access to Devizes via a new station at Lydeway The South West 1
To re-open the Wellington and Cullompton Railway The South West 1
To introduce a Westbury Station Hub The South West 1
To operate Connected and Autonomous Vehicles (CAVs) along former rail alignment The South East 1
To re-open the Lewis to Uckfield & Tunbridge Wells to Eridge/Ashurst - Brighton Main Line The South East 1
To reinstate the branch lines on the Isle of Wight The South East 1
To introduce passenger services on the Totton-Fawley (Waterside) line The South East 1
To introduce a passing loop and associated signaling to the South Fylde line The North West 2
To open a two platform railway station at Kenyon Junction station The North West 2
To re-open Golborne Railway Station The North West 2
To reinstate the Bolton-Radcliffe / Bolton-Bury The North West 2
To reinstate the Beeston Castle and Tarporley railway station The North West 2
To re-open Midge Hall Station The North West 2
To re-double the Mid Cheshire Line between Stockport and Altrincham and associated station reopenings The North West 2
To re-double the Stockport to Ashton Line The North West 2
To reinstate passenger services between Glazebrook Junction and Skelton Junction The North West 2
To introduce a Metrolink/Tram Train service extending the existing service from East Didsbury to Stockport The North West 2
To introduce a new fixed public transit transport system between Consett and Newcastle The North East 2
To re-open a station at Ferryhill The North East 2
To re-open the Wymondham-Dereham line The East 2
To reinstate the King’s Lynn to Hunstanton Railway The East 2
To reinstate the Beverley to York rail line Yorkshire and Humberside 2
To restore a daily train service on the Keighley and Worth Valley Railway Yorkshire and Humberside 2
To reinstate the Upper Wensleydale Railway Yorkshire and Humberside 2
To restore passenger rail to the Sheaf Valley Yorkshire and Humberside 2
To restore a South Humber Link Yorkshire and Humberside 2
To reinstate the South Yorkshire Joint Railway Yorkshire and Humberside 2
To open a new station at Waverley Yorkshire and Humberside 2
To re-open the Stratford upon Avon to Honeybourne-Worcester/Oxford (SWO) Railway Line The Midlands 2
To increase stopping services at Radcliffe-on-Trent and Bottesford stations on the Poacher line between Grantham and Nottingham The Midlands 2
To increase services to Nottingham and Leicester, via Syston and Loughborough from Melton Mowbray The Midlands 2
To reconnect Ashfield Communities through the Maid Marian Line The Midlands 2
To introduce a passenger service to Shepton Mallet in Somerset The South West 2
To reinstate the Radstock railway The South West 2
To re-open the former St Anne’s Park railway station on the Great Western Main Line from Bristol Temple Meads towards Bath The South West 2
To re-open the Primrose Line The South West 2
To enhance services on the Newquay Line The South West 2
To support frequency enhancements to Falmouth The South West 2
To restore secondary services on the Great Western Main line The South West 2
To re-open the Goodrington and Churston Stations The South West 2
To open a new station for Langport and Somerton area The South West 2
To open Charfield Station The South West 2
To reinstate Bodmin to Wadebridge railway and associated work The South West 2
To reinstate the Ashburton and Buckfastleigh Junction Railway The South West 2
To enhance Bristol West capacity The South West 2
To extend Light railway to the Barnstaple Branch (Chivenor Braunton) “TawLink” The South West 2
To restore the rail link and establish a safe cycle path between Cirencester, the University and Kemble The South West 2
To introduce a heritage line and potentially a year-round passenger service between Swanage and Wareham The South West 2
To improve railway services at Pilning station, as well as to reinstate the footbridge to platform 2 The South West 2
To increase service provision from Bodmin General to Bodmin Parkway The South West 2
To restore the rail connection between Horsham to Worthing with a chord approximately 1km in length The South East 2
To re-open Camberwell Station, London SE5 The South East 2
To unlock capacity and services through Bramley (Hants) The South East 2
To reinstate the dismantled railway between Oakley and the former Aston Rowant station The South East 2
To introduce step free access at the Carshalton Beeches The South East 2
To open a Wantage and Grove Station and associated train service The South East 2
To open a station in Magor and Undy in South Monmouthshire Wales 2
To restore services on the Anglesey Central Railway between Gaerwen and Amlch Wales 2